- 09:34, 7 April 2021 diff hist +435 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 09:34, 7 April 2021 diff hist 0 N File:3.31.21 BeamCommissioningPlanLayout AIPINJ-1 firstpass.ods current
- 09:30, 7 April 2021 diff hist 0 N File:BeamINJphase1v5.pptx current
- 09:27, 7 April 2021 diff hist 0 N File:210401 Phase1 Commissioning.docx current
- 09:25, 7 April 2021 diff hist -13 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 09:25, 7 April 2021 diff hist -9 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 09:21, 7 April 2021 diff hist +204 CIS Phase 1 work plans →Week 28 (Apr 12 - Apr 16)
- 09:19, 7 April 2021 diff hist +18 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 09:17, 7 April 2021 diff hist -62 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 09:15, 7 April 2021 diff hist -19 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 18:02, 6 April 2021 diff hist +4 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 17:46, 6 April 2021 diff hist -10 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 17:46, 6 April 2021 diff hist -1,921 CIS Phase 1 work plans →Week 28 (Apr 12 - Apr 16)
- 16:58, 6 April 2021 diff hist +26 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 16:53, 6 April 2021 diff hist -14 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 16:52, 6 April 2021 diff hist +20 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 16:46, 6 April 2021 diff hist +18 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 16:44, 6 April 2021 diff hist 0 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 16:44, 6 April 2021 diff hist -37 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 16:35, 6 April 2021 diff hist -63 CIS Phase 1 work plans →Week 28 (Apr 12 - Apr 16)
- 16:22, 6 April 2021 diff hist +96 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 16:19, 6 April 2021 diff hist +122 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 15:48, 6 April 2021 diff hist -37 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 08:50, 6 April 2021 diff hist +213 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 08:11, 6 April 2021 diff hist +13 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 20:12, 5 April 2021 diff hist +8 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 15:37, 5 April 2021 diff hist +25 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 10:13, 5 April 2021 diff hist -27 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 10:12, 5 April 2021 diff hist +26 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 10:10, 5 April 2021 diff hist +65 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 10:08, 5 April 2021 diff hist +339 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 09:54, 5 April 2021 diff hist -1 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 09:52, 5 April 2021 diff hist +174 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 08:24, 5 April 2021 diff hist +64 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 08:13, 5 April 2021 diff hist +1 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 08:12, 5 April 2021 diff hist +101 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 18:15, 2 April 2021 diff hist +6 CIS Phase 1 work plans →Penetration Work
- 18:15, 2 April 2021 diff hist 0 CIS Phase 1 work plans →Penetration Work
- 18:14, 2 April 2021 diff hist +216 CIS Phase 1 work plans →Penetration Work
- 18:12, 2 April 2021 diff hist +2 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 18:11, 2 April 2021 diff hist +84 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 18:11, 2 April 2021 diff hist -2 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 18:10, 2 April 2021 diff hist -2 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 17:56, 2 April 2021 diff hist +93 CIS Phase 1 work plans
- 12:33, 2 April 2021 diff hist +1 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 12:32, 2 April 2021 diff hist +40 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 12:32, 2 April 2021 diff hist 0 N File:BeamDrivers Pt2 3.16.21.pdf current
- 08:20, 2 April 2021 diff hist +50 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 09:01, 1 April 2021 diff hist +78 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:57, 1 April 2021 diff hist +85 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:27, 1 April 2021 diff hist -55 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 22:14, 31 March 2021 diff hist +96 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:12, 31 March 2021 diff hist +6 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:11, 31 March 2021 diff hist +55 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 20:01, 30 March 2021 diff hist +30 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 18:17, 30 March 2021 diff hist +2,507 CIS Phase 1 work plans →Week 30 (Apr 26 - Apr 30)
- 18:16, 30 March 2021 diff hist +2,508 CIS Phase 1 work plans →Week 29 (Apr 19 - Apr 23)
- 18:16, 30 March 2021 diff hist +2,510 CIS Phase 1 work plans →Week 28 (Apr 12 - Apr 16)
- 18:15, 30 March 2021 diff hist +152 CIS Phase 1 work plans →Week 27 (Apr 5 - Apr 9)
- 18:04, 30 March 2021 diff hist +1 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 18:04, 30 March 2021 diff hist -84 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 18:03, 30 March 2021 diff hist +306 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (April '21)
- 17:59, 30 March 2021 diff hist +110 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 10:12, 30 March 2021 diff hist +944 CIS Phase 1 work plans
- 09:58, 30 March 2021 diff hist +3,345 CIS Phase 1 work plans
- 09:52, 30 March 2021 diff hist +185 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:14, 30 March 2021 diff hist -32 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 21:33, 29 March 2021 diff hist -15 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 20:46, 29 March 2021 diff hist -3 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 20:44, 29 March 2021 diff hist -1 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 20:44, 29 March 2021 diff hist +44 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 19:31, 29 March 2021 diff hist +119 Phase 1 →ATLIS Tasks
- 18:46, 29 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →Activities
- 18:46, 29 March 2021 diff hist +130 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 18:44, 29 March 2021 diff hist 0 N File:Beam commissioning full details rev8.png current
- 18:44, 29 March 2021 diff hist 0 N File:Commissioning testplans Rev8.png current
- 18:44, 29 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →Activities
- 18:36, 29 March 2021 diff hist -5 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 17:38, 29 March 2021 diff hist +1 AIPINJ - Layouts →Injector Quick Reference
- 17:38, 29 March 2021 diff hist -1 AIPINJ - Layouts →Injector Quick Reference
- 17:38, 29 March 2021 diff hist 0 N File:12GeV injector quick reference rev17 DRAFT-4.pdf current
- 17:37, 29 March 2021 diff hist +121 AIPINJ - Layouts →Injector Quick Reference
- 09:57, 29 March 2021 diff hist +119 Phase 1 →ATLIS Tasks
- 09:14, 29 March 2021 diff hist +89 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:22, 29 March 2021 diff hist -67 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:22, 29 March 2021 diff hist -37 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:06, 29 March 2021 diff hist +20 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 17:40, 26 March 2021 diff hist +90 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 17:39, 26 March 2021 diff hist -5 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 17:38, 26 March 2021 diff hist -13 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 17:38, 26 March 2021 diff hist +55 CIS Phase 1 work plans
- 17:26, 26 March 2021 diff hist -66 CIS Phase 1 work plans →Penetration Work
- 17:26, 26 March 2021 diff hist +82 CIS Phase 1 work plans
- 17:25, 26 March 2021 diff hist +13 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 17:24, 26 March 2021 diff hist +107 Phase 1 →ATLIS Tasks
- 09:26, 26 March 2021 diff hist +286 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 09:13, 26 March 2021 diff hist -40 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 09:13, 26 March 2021 diff hist +138 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:23, 26 March 2021 diff hist +116 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:21, 26 March 2021 diff hist +62 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:58, 25 March 2021 diff hist +71 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 17:24, 24 March 2021 diff hist +124 Phase 1 →ATLIS Tasks
- 10:07, 24 March 2021 diff hist 0 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 10:07, 24 March 2021 diff hist 0 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 10:06, 24 March 2021 diff hist +48 CIS Phase 1 work plans
- 10:04, 24 March 2021 diff hist +528 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 09:42, 24 March 2021 diff hist -22 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 09:42, 24 March 2021 diff hist +484 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 21:02, 23 March 2021 diff hist -107 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 09:57, 23 March 2021 diff hist -2 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 09:56, 23 March 2021 diff hist 0 N File:Beam commissioning full details rev7.png current
- 09:56, 23 March 2021 diff hist 0 N File:Commissioning testplans Rev7.png current
- 09:56, 23 March 2021 diff hist +1 Phase 1 - HCO & Commissioning →ATLis Testplans
- 09:55, 23 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →Activities
- 09:55, 23 March 2021 diff hist +344 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 08:25, 23 March 2021 diff hist +67 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 08:21, 23 March 2021 diff hist +71 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 18:52, 22 March 2021 diff hist +29 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 18:45, 22 March 2021 diff hist -8 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 18:44, 22 March 2021 diff hist -2 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 18:42, 22 March 2021 diff hist +25 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 18:36, 22 March 2021 diff hist -2 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 18:35, 22 March 2021 diff hist +31 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 18:28, 22 March 2021 diff hist +131 Phase 1 →ATLIS Tasks
- 09:10, 22 March 2021 diff hist -33 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 09:09, 22 March 2021 diff hist +87 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 19:17, 19 March 2021 diff hist +27 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 19:16, 19 March 2021 diff hist +13 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 19:14, 19 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →Activities
- 19:14, 19 March 2021 diff hist 0 N File:Beam commissioning full details rev6.png current
- 19:14, 19 March 2021 diff hist 0 N File:Commissioning testplans Rev6.png current
- 19:13, 19 March 2021 diff hist +2 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 19:13, 19 March 2021 diff hist +137 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 19:07, 19 March 2021 diff hist +825 Phase 1 - HCO & Commissioning →ATLis Testplans
- 09:41, 19 March 2021 diff hist 0 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 09:41, 19 March 2021 diff hist 0 N File:InjSB Week25.png current
- 09:38, 19 March 2021 diff hist +48 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 09:37, 19 March 2021 diff hist -48 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 09:37, 19 March 2021 diff hist -119 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 09:35, 19 March 2021 diff hist +13 CIS Phase 1 work plans →Penetration Work
- 09:34, 19 March 2021 diff hist +1,279 CIS Phase 1 work plans
- 09:13, 18 March 2021 diff hist +6 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 09:12, 18 March 2021 diff hist +2 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 09:11, 18 March 2021 diff hist +159 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 19:20, 17 March 2021 diff hist +121 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 13:54, 17 March 2021 diff hist -79 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 13:53, 17 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →ATLis Testplans
- 13:53, 17 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →Activities
- 13:53, 17 March 2021 diff hist 0 N File:Beam commissioning full details rev5.png current
- 13:52, 17 March 2021 diff hist 0 N File:Commissioning testplans Rev5.png current
- 13:44, 17 March 2021 diff hist +6 Phase 1 - HCO & Commissioning →ATLis Testplans
- 13:43, 17 March 2021 diff hist +174 Phase 1 - HCO & Commissioning →ATLis Testplans
- 13:41, 17 March 2021 diff hist +129 Phase 1 →ATLIS Tasks
- 08:55, 17 March 2021 diff hist +107 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 08:20, 17 March 2021 diff hist +130 Useful Links
- 08:18, 17 March 2021 diff hist +115 CEBAF Operations
- 18:16, 16 March 2021 diff hist +18 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 14:12, 16 March 2021 diff hist +25 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 14:11, 16 March 2021 diff hist +99 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 11:56, 16 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 11:55, 16 March 2021 diff hist 0 N File:Beam commissioning full details rev4.png current
- 11:55, 16 March 2021 diff hist 0 N File:Commissioning testplans Rev4.png current
- 11:54, 16 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →Activities
- 11:44, 16 March 2021 diff hist +1 Phase 1 - HCO & Commissioning →ATLis Testplans
- 11:38, 16 March 2021 diff hist +2 Phase 1 - HCO & Commissioning →ATLis Testplans
- 11:37, 16 March 2021 diff hist +681 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 09:21, 16 March 2021 diff hist +114 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 08:23, 16 March 2021 diff hist +131 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 08:17, 16 March 2021 diff hist +35 CIS Phase 1 work plans →Week 26 (Mar 29 - Apr 2)
- 08:16, 16 March 2021 diff hist +35 CIS Phase 1 work plans →Week 25 (Mar 22 - Mar 26)
- 08:16, 16 March 2021 diff hist +36 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 08:09, 16 March 2021 diff hist -87 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 18:56, 15 March 2021 diff hist 0 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 18:56, 15 March 2021 diff hist 0 N File:InjSB Week24.png current
- 18:54, 15 March 2021 diff hist 0 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 18:39, 15 March 2021 diff hist +49 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 14:52, 15 March 2021 diff hist +51 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 14:52, 15 March 2021 diff hist +20 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 14:38, 15 March 2021 diff hist +269 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 13:47, 15 March 2021 diff hist +11 Phase 1 - HCO & Commissioning →Important Dates
- 13:22, 15 March 2021 diff hist +27 Phase 1 - HCO & Commissioning →Activities
- 13:21, 15 March 2021 diff hist +1 Phase 1 - HCO & Commissioning →Activities
- 13:21, 15 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →Activities
- 13:21, 15 March 2021 diff hist +35 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 13:20, 15 March 2021 diff hist 0 N File:Beam commissioning full details rev3.png current
- 13:20, 15 March 2021 diff hist +26 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 13:19, 15 March 2021 diff hist 0 N File:Commissioning testplans Rev3.png current
- 13:17, 15 March 2021 diff hist +42 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 12:58, 15 March 2021 diff hist -1 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 12:24, 15 March 2021 diff hist +464 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 12:18, 15 March 2021 diff hist +11 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 12:18, 15 March 2021 diff hist +8 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 12:17, 15 March 2021 diff hist -6 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 12:13, 15 March 2021 diff hist +299 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 12:11, 15 March 2021 diff hist +2 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 12:10, 15 March 2021 diff hist +65 Phase 1 - HCO & Commissioning →System Readiness / HCO Schedule (Apr 5 - Apr 30)
- 12:06, 15 March 2021 diff hist +956 Phase 1 - HCO & Commissioning
- 11:16, 15 March 2021 diff hist +571 Phase 1 →ATLIS Tasks
- 11:06, 15 March 2021 diff hist +93 Phase 1 →ATLIS Tasks
- 10:59, 15 March 2021 diff hist +135 Phase 1 →ATLIS Tasks
- 10:14, 15 March 2021 diff hist +35 Phase 1 - HCO & Commissioning →Important Dates
- 09:40, 15 March 2021 diff hist +85 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 09:36, 15 March 2021 diff hist +38 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 09:33, 15 March 2021 diff hist +255 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 17:08, 12 March 2021 diff hist 0 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 17:07, 12 March 2021 diff hist +12 CIS Phase 1 work plans →Week 23 (Mar 8 - Mar 12)
- 10:21, 12 March 2021 diff hist +78 CIS Phase 1 work plans →Week 24 (Mar 15 - Mar 19)
- 10:19, 12 March 2021 diff hist +1,030 CIS Phase 1 work plans
- 19:59, 11 March 2021 diff hist +122 Phase 1 →ATLIS Tasks
- 19:57, 11 March 2021 diff hist +157 Phase 1 →ATLIS Tasks
- 19:51, 11 March 2021 diff hist +6 Phase 1 →ATLIS Tasks
- 16:18, 9 March 2021 diff hist +144 Phase 1 →ATLIS Tasks
- 20:29, 5 March 2021 diff hist +121 AIPINJ - Layouts →Injector Quick Reference
- 20:28, 5 March 2021 diff hist 0 N File:12GeV injector quick reference rev17 DRAFT-3.pdf current
- 20:15, 5 March 2021 diff hist -12 Phase 1 →ATLIS Tasks
- 20:08, 5 March 2021 diff hist +44 Phase 1 →ATLIS Tasks
- 20:06, 5 March 2021 diff hist +173 Phase 1 →ATLIS Tasks
- 16:27, 5 March 2021 diff hist +13 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 10:47, 5 March 2021 diff hist +79 CIS Phase 1 work plans →Week 23 (Mar 8 - Mar 12)
- 10:42, 5 March 2021 diff hist +289 CIS Phase 1 work plans
- 10:39, 5 March 2021 diff hist +735 CIS Phase 1 work plans →Week 23 (Mar 8 - Mar 12)
- 10:32, 5 March 2021 diff hist -27 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 20:48, 4 March 2021 diff hist -32 CIS Phase 1 work plans →Penetration Work
- 20:45, 4 March 2021 diff hist +56 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 20:36, 4 March 2021 diff hist -46 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 20:34, 4 March 2021 diff hist +75 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 09:23, 4 March 2021 diff hist -16 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 20:50, 3 March 2021 diff hist +53 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 20:39, 3 March 2021 diff hist +46 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 20:00, 3 March 2021 diff hist +35 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 17:15, 3 March 2021 diff hist +115 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 11:02, 3 March 2021 diff hist +54 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 21:46, 2 March 2021 diff hist +3 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 15:29, 2 March 2021 diff hist +31 Phase 1 →ATLIS Tasks
- 15:08, 2 March 2021 diff hist +88 Phase 1
- 15:04, 2 March 2021 diff hist +166 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 21:07, 1 March 2021 diff hist +26 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)
- 21:02, 1 March 2021 diff hist +314 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 20:59, 1 March 2021 diff hist -51 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 20:46, 1 March 2021 diff hist +144 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 20:26, 1 March 2021 diff hist +2 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 20:25, 1 March 2021 diff hist -1 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 20:25, 1 March 2021 diff hist 0 N File:Commissioning testplans Rev2.png current
- 20:24, 1 March 2021 diff hist +1 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 20:24, 1 March 2021 diff hist -1 Phase 1 - HCO & Commissioning →Activities
- 20:24, 1 March 2021 diff hist -6 Phase 1 - HCO & Commissioning →Activities
- 20:23, 1 March 2021 diff hist 0 Phase 1 - HCO & Commissioning →Beam Commissioning (May 3 - Jul 2)
- 20:22, 1 March 2021 diff hist +180 Phase 1 - HCO & Commissioning
- 20:19, 1 March 2021 diff hist 0 File:Commissioning Activities Rev1.png Moser uploaded a new version of File:Commissioning Activities Rev1.png current
- 18:28, 1 March 2021 diff hist +166 CIS Phase 1 work plans →Week 22 (Mar 1- Mar 5)