All public logs
Jump to navigation
Jump to search
Combined display of all available logs of Ciswikidb. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)- 10:39, 13 October 2020 Poelker talk contribs uploaded File:Updated elevated HDIce beamline.pdf
- 13:00, 11 October 2020 Poelker talk contribs uploaded File:HDIce status report end run1.pdf
- 14:43, 8 October 2020 Poelker talk contribs uploaded File:Yan's photocathode paper PRAB.pdf
- 15:41, 7 October 2020 Poelker talk contribs uploaded File:Running log during run1.docx
- 19:50, 1 October 2020 Poelker talk contribs uploaded a new version of File:HDIce run2 and 3 schedule.jpg
- 19:49, 1 October 2020 Poelker talk contribs uploaded File:HDIce run2 and 3 schedule.jpg
- 19:43, 1 October 2020 Poelker talk contribs uploaded File:SRF and CRYO tasks related to replumbing the CTF, between runs 1 and 2.jpg
- 19:39, 1 October 2020 Poelker talk contribs uploaded File:SRF and CRYO tasks related to replumbing the CTF, between runs 1 and 2.jpeg
- 19:33, 1 October 2020 Poelker talk contribs uploaded File:CTF schedule updated.JPG
- 19:32, 1 October 2020 Poelker talk contribs uploaded a new version of File:Sajini-JSACTF schedule between runs 1 and 2.jpg
- 19:31, 1 October 2020 Poelker talk contribs uploaded File:Sajini-JSACTF schedule between runs 1 and 2.jpg
- 10:23, 28 September 2020 Poelker talk contribs uploaded File:P&C meeting September 28, 2020.pptx
- 09:32, 28 September 2020 Poelker talk contribs uploaded File:Revised schedule for runs 2 and 3.docx
- 14:46, 25 September 2020 Poelker talk contribs uploaded File:How to perform a QE scan.docx
- 14:42, 25 September 2020 Poelker talk contribs uploaded File:UITF HDIce schedule now through end of run3.docx
- 14:41, 25 September 2020 Poelker talk contribs uploaded a new version of File:HDIce schedule now through end of run3.docx
- 14:40, 25 September 2020 Poelker talk contribs uploaded File:HDIce schedule now through end of run3.docx
- 15:55, 15 September 2020 Poelker talk contribs uploaded File:UED August 2020.pdf
- 12:07, 4 September 2020 Poelker talk contribs uploaded File:HDIce run1 tasks and goals.pdf
- 16:06, 1 September 2020 Poelker talk contribs uploaded File:HDIce run 1, 2 and 3 schedules with LHe usage.pdf
- 14:18, 31 August 2020 Poelker talk contribs uploaded File:Request to operate UITF.pdf
- 14:17, 31 August 2020 Poelker talk contribs uploaded File:UITF Permission to Operate letter.pdf
- 15:02, 26 August 2020 Poelker talk contribs uploaded File:Summary of run0 highlights.docx
- 12:32, 26 August 2020 Poelker talk contribs uploaded File:UITF FSD nodes 8 26 2020.xls
- 12:30, 26 August 2020 Poelker talk contribs uploaded File:FSD nodes for HDIce.pdf
- 11:33, 21 August 2020 Poelker talk contribs uploaded File:Running log during run0.docx
- 08:25, 17 August 2020 Poelker talk contribs uploaded File:Remaining run0 tasks.docx
- 08:24, 17 August 2020 Poelker talk contribs uploaded File:Tasks between run0 and run1.docx
- 11:33, 29 April 2020 Poelker talk contribs uploaded File:HDIce to do list 4 29 2020.docx
- 12:02, 18 April 2020 Poelker talk contribs uploaded File:SAF 162 UITF Operator training ppt slides ver3.pptx
- 12:45, 26 March 2020 Poelker talk contribs uploaded File:Medcon6 week 1 group meeting.docx
- 15:31, 19 March 2020 Poelker talk contribs uploaded File:P&C meeting 3 17 2020.pptx
- 15:47, 17 March 2020 Poelker talk contribs uploaded File:UITF operator training slides draft version 3 17 2020.pptx
- 13:49, 13 March 2020 Poelker talk contribs uploaded File:UITF operator training slides draft version 3.pptx
- 10:40, 9 March 2020 Poelker talk contribs uploaded a new version of File:UITF operator training slides draft.pptx
- 14:21, 8 March 2020 Poelker talk contribs uploaded File:HDIce test schedule.jpg
- 14:16, 8 March 2020 Poelker talk contribs uploaded File:UITF operator training slides draft.pptx
- 16:45, 4 March 2020 Poelker talk contribs uploaded File:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx
- 16:45, 4 March 2020 Poelker talk contribs uploaded File:Tune mode generator alignment procedure.pdf
- 13:14, 4 March 2020 Poelker talk contribs uploaded File:Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx
- 15:40, 24 February 2020 Poelker talk contribs uploaded File:ACC-20-97400-LOSP.pdf
- 16:35, 21 February 2020 Poelker talk contribs uploaded File:Rogowski coil commissioning.docx
- 13:56, 11 February 2020 Poelker talk contribs uploaded File:HDIce target loading OSP.pdf
- 10:00, 29 January 2020 Poelker talk contribs uploaded File:Wednesday scheduling mtg injector instabilities.pdf
- 10:00, 29 January 2020 Poelker talk contribs uploaded File:Wednesday scheduling mtg injector instabilities.pptx
- 09:59, 29 January 2020 Poelker talk contribs uploaded File:Wednesday scheduling mtg UITF status.pptx
- 14:02, 23 January 2020 Poelker talk contribs uploaded File:P&C meeting 1 21 2020.pptx
- 16:34, 15 January 2020 Poelker talk contribs uploaded File:Dave Kashy's suggestion for heating the buncher.pdf
- 13:07, 15 January 2020 Poelker talk contribs uploaded File:HDIce ERR report summary.pdf
- 09:29, 15 January 2020 Poelker talk contribs uploaded File:UITF commissioning status Jan 15, 2020 Wed scheduling meeting MCC.pdf
- 17:22, 13 January 2020 Poelker talk contribs uploaded File:UITF commissioning status Jan 15, 2020 Wed scheduling meeting MCC.pptx
- 11:56, 9 January 2020 Poelker talk contribs uploaded File:Present status FSD nodes at UITF 1 9 2020.jpg
- 17:04, 7 January 2020 Poelker talk contribs uploaded File:Nanostructured photocathode paper theoretical study.pdf
- 12:48, 7 January 2020 Poelker talk contribs uploaded File:Yan paper draft 1 7 2020.docx
- 14:26, 6 January 2020 Poelker talk contribs uploaded File:UITF sweep procedure SSG-PR-03-101 Rev. 20.0 January 3, 2020.pdf
- 17:10, 3 January 2020 Poelker talk contribs uploaded File:HDIce to do list 1 3 2020.docx
- 17:07, 3 January 2020 Poelker talk contribs uploaded File:HDIce request for computer support Accel SysAdmin Group.docx
- 15:08, 3 January 2020 Poelker talk contribs uploaded File:TJSO letter.jpg
- 15:06, 3 January 2020 Poelker talk contribs uploaded File:Permission from Stuart to commission UITF accelerator.pdf
- 15:05, 3 January 2020 Poelker talk contribs uploaded File:DOE Site Office permission to commission UITF accelerator.pdf
- 13:54, 9 December 2019 Poelker talk contribs uploaded File:Nanostructured photocathode paper experimental results.pdf
- 11:04, 9 December 2019 Poelker talk contribs uploaded File:Permission to commission.pdf
- 11:04, 9 December 2019 Poelker talk contribs uploaded File:CONOPS approval.pdf
- 14:27, 3 December 2019 Poelker talk contribs uploaded File:UITF shielding package by Vashek Vylet.pdf
- 12:45, 27 November 2019 Poelker talk contribs uploaded File:UITF sweep procedure SSG-PR-03-101 Rev. 19.2.pdf
- 12:51, 21 November 2019 Poelker talk contribs uploaded File:HDIce Dump Magnet OSP.pdf
- 19:40, 18 November 2019 Poelker talk contribs uploaded File:Matt's final presentation UITF status.pptx
- 11:42, 18 November 2019 Poelker talk contribs uploaded File:UITF Commissioning Plan approved.pdf
- 09:58, 18 November 2019 Poelker talk contribs uploaded File:Engineering tasks November 18 2019.docx
- 14:27, 15 November 2019 Poelker talk contribs uploaded File:Matt's presentation UITF status.pptx
- 13:02, 14 November 2019 Poelker talk contribs uploaded File:Matt's presentation UITF status etc.,.pptx
- 13:48, 13 November 2019 Poelker talk contribs uploaded File:300 kV inverted gun paper.pdf
- 10:43, 13 November 2019 Poelker talk contribs uploaded File:UITF Commissioning Plan.docx
- 13:24, 11 November 2019 Poelker talk contribs uploaded File:CIS list 11 11 2019.docx
- 09:42, 7 November 2019 Poelker talk contribs uploaded File:Catwalk engineering calculations from Tom Renzo.pdf
- 11:27, 6 November 2019 Poelker talk contribs uploaded File:HDIce ERR agenda.pdf
- 11:27, 6 November 2019 Poelker talk contribs uploaded File:HDIce ERR charge.pdf
- 15:24, 5 November 2019 Poelker talk contribs uploaded File:Approved UITF Operator List 11 5 2019.docx
- 15:23, 5 November 2019 Poelker talk contribs uploaded File:Approved Operator List.jpg
- 11:54, 5 November 2019 Poelker talk contribs uploaded File:MeV beamline layout 11 5 2019.pdf
- 11:52, 5 November 2019 Poelker talk contribs uploaded File:MeV beamline spreadsheet.xls
- 10:36, 1 November 2019 Poelker talk contribs uploaded File:P&C meeting 10 28 2019.pptx
- 15:56, 31 October 2019 Poelker talk contribs uploaded File:Mason Stoecker gas brem poster.pptx
- 16:17, 29 October 2019 Poelker talk contribs uploaded File:ASE approval letter from Site Office.pdf
- 12:44, 21 October 2019 Poelker talk contribs uploaded File:HDIce dump testing schedule.xls
- 12:43, 21 October 2019 Poelker talk contribs uploaded File:HDIce dump testing schedule.jpg
- 08:48, 17 October 2019 Poelker talk contribs uploaded File:JLAAC poelker UITF first draft.pptx
- 09:25, 14 October 2019 Poelker talk contribs uploaded File:UITF trench shielding with photos.xls
- 16:32, 11 October 2019 Poelker talk contribs uploaded File:UITF trench foam and shielding.xls
- 09:10, 8 October 2019 Poelker talk contribs uploaded File:UITF ASE rev0.pdf
- 11:37, 6 September 2019 Poelker talk contribs uploaded File:EWPAA 2019 poelker.pptx
- 12:45, 21 August 2019 Poelker talk contribs uploaded File:Modeling thin GaAs photocathodes.pdf
- 14:23, 18 July 2019 Poelker talk contribs uploaded File:Modifications to beamline.pdf
- 15:10, 2 July 2019 Poelker talk contribs uploaded File:UITF ARR brief summary report.pdf
- 15:50, 25 June 2019 Poelker talk contribs uploaded File:UITF sweep procedure S6024.pdf
- 12:41, 21 June 2019 Poelker talk contribs uploaded File:UOD version June 21, 2019.pdf
- 10:08, 21 June 2019 Poelker talk contribs uploaded File:UITF Cave2 ceiling roof tile removal THA.pdf
- 10:08, 21 June 2019 Poelker talk contribs uploaded File:UITF Cave2 ceiling roof tile removal OSP.pdf
- 10:05, 21 June 2019 Poelker talk contribs uploaded a new version of File:UITF Cave2 ceiling roof tile removal OSP.docx
- 10:04, 21 June 2019 Poelker talk contribs uploaded File:UITF Cave2 ceiling roof tile removal OSP.docx
- 12:46, 15 June 2019 Poelker talk contribs uploaded File:Summary report UITF Conduct of Operations Review.docx
- 15:38, 16 May 2019 Poelker talk contribs uploaded File:JLAB-TN-18-020 Radiation Safety Aspects of the Upgraded Injector Test Facility Vashek Vylet.docx
- 13:20, 15 May 2019 Poelker talk contribs uploaded File:CIS to-do list today, May 2019.docx
- 13:19, 15 May 2019 Poelker talk contribs uploaded File:CIS to-do list from one year ago, May 2018.docx
- 17:21, 13 May 2019 Poelker talk contribs uploaded File:UOD version 1 May 13, 2019.pdf
- 14:54, 8 May 2019 Poelker talk contribs uploaded File:M Herbert 200kV photogun.pptx
- 16:41, 24 April 2019 Poelker talk contribs uploaded File:UITF ASE Rev 0 version as of 4 24 2019.pdf
- 16:33, 24 April 2019 Poelker talk contribs uploaded File:UITF ASE Rev 0 ver2.pdf
- 16:28, 24 April 2019 Poelker talk contribs uploaded File:UITF PSS overview.pdf
- 08:05, 24 April 2019 Poelker talk contribs uploaded File:UITF Shielding Summary Vylet COO review.pptx
- 14:19, 23 April 2019 Poelker talk contribs uploaded File:UITF COO review extras.pptx
- 10:10, 22 April 2019 Poelker talk contribs uploaded File:UITF status poelker COO review v2.pptx
- 08:56, 22 April 2019 Poelker talk contribs uploaded File:P&C Meeting UITF 4 22 2019.pptx
- 13:03, 19 April 2019 Poelker talk contribs uploaded File:UITF Machine Protection poelker COO review v1.pptx
- 13:03, 19 April 2019 Poelker talk contribs uploaded File:UITF status poelker COO review v1.pptx
- 12:05, 19 April 2019 Poelker talk contribs uploaded File:Proposed HDIce run schedule 4 2019.pdf
- 15:52, 18 April 2019 Poelker talk contribs uploaded File:UITF Accelerator Operations Directive UOD Rev 0.pdf
- 15:03, 18 April 2019 Poelker talk contribs uploaded File:UITF ASE Rev 0.pdf
- 15:03, 18 April 2019 Poelker talk contribs uploaded File:FSAD8.pdf
- 15:21, 16 April 2019 Poelker talk contribs uploaded File:UITF PSS BCM review summary document.docx
- 10:32, 25 March 2019 Poelker talk contribs uploaded File:P&C Meeting 2 26 2019.pptx
- 10:31, 25 March 2019 Poelker talk contribs uploaded File:P&C Meeting 3 25 2019.pptx
- 10:31, 25 March 2019 Poelker talk contribs uploaded File:2019.pptx
- 13:21, 18 March 2019 Poelker talk contribs uploaded File:Updated MeV songsheets Shaun Gregory drawings of "as built" beamline.pdf
- 12:36, 20 February 2019 Poelker talk contribs uploaded File:Revised THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf
- 12:36, 20 February 2019 Poelker talk contribs uploaded File:Revised OSP 82655 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf
- 12:06, 13 February 2019 Poelker talk contribs uploaded File:THA for the OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF)revision2.pdf
- 12:05, 13 February 2019 Poelker talk contribs uploaded a new version of File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx
- 12:05, 13 February 2019 Poelker talk contribs uploaded a new version of File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf
- 12:04, 13 February 2019 Poelker talk contribs uploaded File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx
- 12:03, 13 February 2019 Poelker talk contribs uploaded File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf
- 16:36, 11 February 2019 Poelker talk contribs uploaded File:OSP-UITF keV beam operations approved revision3 approved OSP format with signatures.pdf
- 16:30, 11 February 2019 Poelker talk contribs uploaded File:THA UITF keV beam operations approved revision3.pdf
- 16:29, 11 February 2019 Poelker talk contribs uploaded File:OSP UITF keV beam operations approved revision3.pdf
- 16:27, 11 February 2019 Poelker talk contribs uploaded File:OSP UITF keV beam operations approved revision3.docx
- 16:23, 11 February 2019 Poelker talk contribs uploaded File:UITF sweep procedure Rev. 19.0; February 4, 2019.pdf
- 17:15, 25 January 2019 Poelker talk contribs uploaded File:Accident scenario table revision.png
- 17:15, 25 January 2019 Poelker talk contribs uploaded File:Accident scenario table 1.png
- 16:48, 22 January 2019 Poelker talk contribs uploaded File:Photo3 of MeV beamline girder under construction1.jpg
- 16:46, 22 January 2019 Poelker talk contribs uploaded a new version of File:Photo2 of MeV beamline girder under construction1.jpg
- 16:45, 22 January 2019 Poelker talk contribs uploaded File:Photo2 of MeV beamline girder under construction1.jpg
- 16:38, 22 January 2019 Poelker talk contribs uploaded File:Photo1 of MeV beamline girder under construction1.jpg
- 16:36, 22 January 2019 Poelker talk contribs uploaded File:Updated spreadsheet of MeV items in sequential order.xls
- 16:36, 22 January 2019 Poelker talk contribs uploaded a new version of File:Updated MeV songsheets Keith Harding latest.pdf
- 16:35, 22 January 2019 Poelker talk contribs uploaded File:Updated MeV songsheets Keith Harding latest.pdf
- 12:11, 18 January 2019 Poelker talk contribs uploaded File:MeV beamline girder under construction1.jpg
- 12:06, 18 January 2019 Poelker talk contribs uploaded File:MeV beamline 80 20 image3.jpg
- 12:06, 18 January 2019 Poelker talk contribs uploaded File:MeV beamline 80 20 image2.jpg
- 12:05, 18 January 2019 Poelker talk contribs uploaded File:MeV beamline 80 20 image1.jpg
- 12:04, 18 January 2019 Poelker talk contribs uploaded File:20 image1.jpg
- 09:34, 14 January 2019 Poelker talk contribs uploaded File:Summary of the Uses of UITF meeting.docx
- 09:32, 14 January 2019 Poelker talk contribs uploaded File:P&C Meeting slides January 14, 2019.pptx
- 12:15, 8 January 2019 Poelker talk contribs uploaded File:Revised north wall shielding plan per Walt - extended tile.jpg
- 10:19, 8 January 2019 Poelker talk contribs uploaded File:Requested modification of north pier to accommodate helium vent pipe.pdf
- 10:16, 8 January 2019 Poelker talk contribs uploaded File:Revised north wall shielding plan per Walt.jpg
- 11:35, 7 January 2019 Poelker talk contribs uploaded File:UITF high bunch charge Grames and Jiquan version2.pptx
- 11:34, 7 January 2019 Poelker talk contribs uploaded File:Nb3Sn coated cavities.pptx
- 11:08, 7 January 2019 Poelker talk contribs uploaded File:Haipeng fast kicker tests.pptx
- 10:14, 7 January 2019 Poelker talk contribs uploaded File:Keith Welch north wall extra shielding.pdf
- 10:11, 7 January 2019 Poelker talk contribs uploaded a new version of File:Concrete "pier" to support chimney cap.jpg
- 10:09, 7 January 2019 Poelker talk contribs uploaded File:Concrete "pier" to support chimney cap.jpg
- 10:08, 7 January 2019 Poelker talk contribs uploaded File:Green steel blocks plus concrete "cap".jpg
- 11:13, 21 December 2018 Poelker talk contribs uploaded File:Chris Keith version2.pdf
- 11:13, 21 December 2018 Poelker talk contribs uploaded File:HDIce slides.pdf
- 15:49, 14 December 2018 Poelker talk contribs uploaded File:Keith Welch accident scenarios.docx
- 09:26, 12 December 2018 Poelker talk contribs uploaded File:UITF and CTF Ed Daly.pptx
- 14:07, 11 December 2018 Poelker talk contribs uploaded File:UITF thoughts poelker.pptx
- 12:48, 11 December 2018 Poelker talk contribs uploaded File:HDIce slides.pptx
- 10:31, 11 December 2018 Poelker talk contribs uploaded File:Wastewater treatment.pptx
- 10:29, 11 December 2018 Poelker talk contribs uploaded File:Commissioning the QCM.pptx
- 12:51, 10 December 2018 Poelker talk contribs uploaded File:Uses of UITF introduction poelker.pptx
- 12:50, 10 December 2018 Poelker talk contribs uploaded File:DNP Chris Keith.pptx
- 12:50, 10 December 2018 Poelker talk contribs uploaded File:Bubble at UITF.pptx
- 12:24, 10 December 2018 Poelker talk contribs uploaded File:P&C meeting November 26, 2018 Sandorfi UITF schedule.pptx
- 15:15, 5 December 2018 Poelker talk contribs uploaded File:Updated spreadsheet of MeV items in sequence.xls
- 15:15, 5 December 2018 Poelker talk contribs uploaded File:Updated MeV songsheets.pdf
- 10:55, 3 December 2018 Poelker talk contribs uploaded File:Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP.pdf
- 13:31, 24 November 2018 Poelker talk contribs uploaded File:Problems with photoguns version2.pptx
- 14:04, 20 November 2018 Poelker talk contribs uploaded File:Green block wall.png
- 14:04, 20 November 2018 Poelker talk contribs uploaded File:Tee-shaped block wall.png
- 14:03, 20 November 2018 Poelker talk contribs uploaded File:Laser hut wall shielding.png
- 12:53, 14 November 2018 Poelker talk contribs uploaded File:Paul Metcalf's draft PSS BCM engineering requirements document.pdf
- 09:49, 13 November 2018 Poelker talk contribs uploaded File:PSS BCM specs document version2.docx
- 09:48, 13 November 2018 Poelker talk contribs uploaded File:PSS BCM specs document version1.docx
- 14:18, 8 November 2018 Poelker talk contribs uploaded File:THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf
- 14:17, 8 November 2018 Poelker talk contribs uploaded File:OSP 79435 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf
- 13:16, 7 November 2018 Poelker talk contribs uploaded File:MeV items in sequence.xls
- 13:13, 7 November 2018 Poelker talk contribs uploaded File:MeV spreadsheet items in sequence.xls
- 09:47, 7 November 2018 Poelker talk contribs uploaded File:Version2 MeV beamline sequence of elements.xls
- 19:02, 6 November 2018 Poelker talk contribs uploaded File:Draft sequence of components for MeV beamlines.xls
- 09:55, 15 October 2018 Poelker talk contribs uploaded File:P&C meeting slides from 10 15 2018.pptx
- 09:52, 15 October 2018 Poelker talk contribs uploaded File:181015 MeV songsheet.pdf
- 15:12, 3 October 2018 Poelker talk contribs uploaded File:COMSOL modeling of 200kV gun.pdf
- 09:30, 3 October 2018 Poelker talk contribs uploaded File:TC03.jpg
- 09:29, 3 October 2018 Poelker talk contribs uploaded File:TC02.jpg
- 09:29, 3 October 2018 Poelker talk contribs uploaded File:TC01.jpg
- 15:12, 25 September 2018 Poelker talk contribs uploaded a new version of File:IR 15 01.pdf
- 15:09, 25 September 2018 Poelker talk contribs uploaded File:Tschalär MIT Bates technical note B IR 15 01.pdf
- 15:08, 25 September 2018 Poelker talk contribs uploaded File:IR 15 01.pdf
- 15:06, 25 September 2018 Poelker talk contribs uploaded File:IR 15-01.pdf
- 14:55, 25 September 2018 Poelker talk contribs uploaded File:Running log of discussions.docx
- 14:53, 25 September 2018 Poelker talk contribs uploaded File:Email discussion following the meeting.docx
- 17:09, 24 September 2018 Poelker talk contribs uploaded File:Hillert SPIN 2016 talk on resonant polarimetry.pdf
- 11:52, 13 September 2018 Poelker talk contribs uploaded File:Accel All Hands poelker CIS draft.pptx
- 13:55, 30 August 2018 Poelker talk contribs uploaded File:John UITF stuff.docx
- 08:48, 13 August 2018 Poelker talk contribs uploaded File:UITF P&C meeting 8 13 2018.pptx
- 14:53, 8 August 2018 Poelker talk contribs uploaded File:Problems with photoguns.pptx
- 12:01, 8 August 2018 Poelker talk contribs uploaded File:John Hansknecht effusion source heater controller.pdf
- 12:14, 7 August 2018 Poelker talk contribs uploaded File:Poelker BNL visit.pptx
- 15:03, 30 July 2018 Poelker talk contribs uploaded File:SCAM ver 4.docx
- 09:10, 12 July 2018 Poelker talk contribs uploaded File:GaAsSb AlGaAs photocathode study.pdf
- 09:09, 12 July 2018 Poelker talk contribs uploaded File:AlGaAs photocathode study.pdf
- 09:26, 25 June 2018 Poelker talk contribs uploaded File:UITF PSS BCM specifications draft with comments from Vashek.docx
- 14:57, 12 June 2018 Poelker talk contribs uploaded File:UITF ARR plan - Bob May draft from 2017.docx
- 14:55, 12 June 2018 Poelker talk contribs uploaded File:UITF ARR plan - Bob May draft rev1.docx
- 14:53, 12 June 2018 Poelker talk contribs uploaded a new version of File:UITF ARR Bob May draft rev1.docx
- 14:47, 12 June 2018 Poelker talk contribs uploaded File:UITF ARR Bob May draft rev1.docx
- 14:46, 12 June 2018 Poelker talk contribs uploaded a new version of File:UITF ARR Bob May's draft rev1.docx
- 14:45, 12 June 2018 Poelker talk contribs uploaded File:UITF ARR Bob May's draft rev1.docx
- 14:45, 12 June 2018 Poelker talk contribs uploaded File:UITF Accelerator Operations Directive Hari draft rev1.docx
- 14:44, 12 June 2018 Poelker talk contribs uploaded File:UITF Accelerator Operations Directive Hari's draft rev1.docx
- 11:47, 7 June 2018 Poelker talk contribs uploaded File:LHeC workshop at Daresbury Poelker Jan. 22 – 23, 2013.pptx
- 13:45, 6 June 2018 Poelker talk contribs uploaded File:ACC-18-74230-OSP QCM Commissioning with RF no beam plus attachments.pdf
- 08:25, 6 June 2018 Poelker talk contribs uploaded File:Elevated beamline.jpg
- 16:20, 29 May 2018 Poelker talk contribs uploaded File:UITF PSS BCM meeting 10 May, 2018.docx
- 14:23, 29 May 2018 Poelker talk contribs uploaded File:Beamline layout.jpg
- 14:09, 29 May 2018 Poelker talk contribs uploaded File:Vashek presentation related to beamloss and UITF PSS BCM performance.pdf
- 14:08, 29 May 2018 Poelker talk contribs uploaded File:Vashek's presentation related to beamloss and UITF PSS BCM performance.pdf
- 13:59, 29 May 2018 Poelker talk contribs uploaded File:UITF PSS BCM preliminary design proposal.pdf
- 12:30, 29 May 2018 Poelker talk contribs uploaded File:THA for the OSP 74230 QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
- 12:26, 29 May 2018 Poelker talk contribs uploaded File:OSP 74230 QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
- 12:26, 29 May 2018 Poelker talk contribs uploaded a new version of File:THA for OSP 74230 QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
- 12:25, 29 May 2018 Poelker talk contribs uploaded File:THA for OSP 74230 QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
- 12:23, 29 May 2018 Poelker talk contribs uploaded a new version of File:THA for OSP 74230- QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
- 12:22, 29 May 2018 Poelker talk contribs uploaded a new version of File:OSP 74230- QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
- 12:21, 29 May 2018 Poelker talk contribs uploaded File:OSP 74230- QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
- 12:20, 29 May 2018 Poelker talk contribs uploaded a new version of File:THA for OSP 74230- QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
- 12:19, 29 May 2018 Poelker talk contribs uploaded File:THA for OSP 74230- QCM Operation at the Upgraded Injector Test Facility (UITF).pdf
- 15:03, 10 April 2018 Poelker talk contribs uploaded File:UITF layout with beamline and trenches.jpeg
- 12:53, 10 April 2018 Poelker talk contribs uploaded File:QCM cryo screen shot.png
- 12:49, 10 April 2018 Poelker talk contribs uploaded File:UITF trench notes.xls
- 12:49, 10 April 2018 Poelker talk contribs uploaded File:UITF drawing, top view, showing trenches.jpeg
- 14:58, 2 April 2018 Poelker talk contribs uploaded File:Screening electrode at ground.pdf
- 13:59, 28 March 2018 Poelker talk contribs uploaded File:NEG coatings to improve vacuum.pdf
- 11:35, 21 March 2018 Poelker talk contribs uploaded File:Proceedings of Science submission, "Magnetized Electron Beam for JLEIC Re-circulator Cooler Ring".pdf
- 08:55, 12 March 2018 Poelker talk contribs uploaded File:UITF to do list 3 12 2018.docx
- 16:29, 7 March 2018 Poelker talk contribs uploaded File:UITF ODH Assessment.pdf
- 09:33, 26 February 2018 Poelker talk contribs uploaded File:UITF to do list 2 26 2018.docx
- 14:19, 23 February 2018 Poelker talk contribs uploaded File:UITF QCM OSP DRAFT.docx
- 14:19, 23 February 2018 Poelker talk contribs uploaded File:QCM Vacuum Vessel Assessment by Gary Cheng.docx