Gallery of new files
Jump to navigation
Jump to search
This special page shows the last uploaded files.
- THA for the OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF)revision2.pdf Poelker
12:06, 13 February 2019
; 521 KB
- OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx Poelker
12:05, 13 February 2019
; 23.07 MB
- OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf Poelker
12:05, 13 February 2019
; 2.59 MB
- Haysg JL0067948-MAGNETIZED BEAM THERMIONIC GUN ASSY 12Feb2019.pdf Suleiman
16:02, 12 February 2019
; 3.5 MB
- OSP-UITF keV beam operations approved revision3 approved OSP format with signatures.pdf Poelker
16:36, 11 February 2019
; 4.08 MB
- Haysg JL0067948-MAGNETIZED BEAM THERMIONIC GUN ASSY 28Jan2019.pdf Suleiman
10:32, 28 January 2019
; 3.55 MB
- Photo3 of MeV beamline girder under construction1.jpg Poelker
16:48, 22 January 2019
1,800 × 1,200; 423 KB
- Photo2 of MeV beamline girder under construction1.jpg Poelker
16:46, 22 January 2019
3,024 × 4,032; 2.6 MB
- Photo1 of MeV beamline girder under construction1.jpg Poelker
16:38, 22 January 2019
4,032 × 3,024; 2.68 MB
- Summary of beam parameter requirements for MOLLER Jan2019.pdf Suleiman
16:10, 21 January 2019
; 206 KB
- Revised north wall shielding plan per Walt - extended tile.jpg Poelker
12:15, 8 January 2019
1,824 × 1,024; 377 KB
- Requested modification of north pier to accommodate helium vent pipe.pdf Poelker
10:19, 8 January 2019
; 754 KB
- InjectorUpgradePlanning GPTsimsJayNewSolenoidDesign 2018 12 12.pptx Hofler
17:39, 11 December 2018
; 51.36 MB
- Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP.pdf Poelker
10:55, 3 December 2018
; 1.33 MB
- Sajini Space charge effect in magnetized beam 19Nov2018.pptx Suleiman
10:48, 21 November 2018
; 87 KB
- Paul Metcalf's draft PSS BCM engineering requirements document.pdf Poelker
12:53, 14 November 2018
; 1.74 MB
- THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf Poelker
14:18, 8 November 2018
; 290 KB
- OSP 79435 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf Poelker
14:17, 8 November 2018
; 1.89 MB
- EIC-CM BNL October 10-12 2017 Presentation Magnetized Beam Mamun Final.pdf Mamun
14:42, 2 November 2018
; 2.07 MB
- Spherical electrode with R30 insulator and 6 cm anode gap.PNG Chgarcia
15:07, 8 August 2018
960 × 1,030; 167 KB
- Modified T-shape electrode with 'mushroom' triple junction shield and doped black R28 insulator.PNG.PNG Chgarcia
15:03, 8 August 2018
960 × 1,030; 145 KB
- High Voltage Cables inventory updated August 6 2018.png Chgarcia
10:41, 6 August 2018
721 × 684; 126 KB
- Sajini Correlated and Uncorrelated Emittance June 25 2018.pptx Suleiman
10:14, 25 June 2018
; 611 KB
- UITF PSS BCM specifications draft with comments from Vashek.docx Poelker
09:26, 25 June 2018
; 561 KB
- ACC-18-74230-OSP QCM Commissioning with RF no beam plus attachments.pdf Poelker
13:45, 6 June 2018
; 7.29 MB
- Vashek presentation related to beamloss and UITF PSS BCM performance.pdf Poelker
14:09, 29 May 2018
; 840 KB
- Vashek's presentation related to beamloss and UITF PSS BCM performance.pdf Poelker
14:08, 29 May 2018
; 840 KB
- THA for the OSP 74230 QCM Operation at the Upgraded Injector Test Facility (UITF).pdf Poelker
12:30, 29 May 2018
; 381 KB
- OSP 74230 QCM Operation at the Upgraded Injector Test Facility (UITF).pdf Poelker
12:26, 29 May 2018
; 2.21 MB
- THA for OSP 74230 QCM Operation at the Upgraded Injector Test Facility (UITF).pdf Poelker
12:26, 29 May 2018
; 2.21 MB
- THA for OSP 74230- QCM Operation at the Upgraded Injector Test Facility (UITF).pdf Poelker
12:23, 29 May 2018
; 381 KB
- OSP 74230- QCM Operation at the Upgraded Injector Test Facility (UITF).pdf Poelker
12:22, 29 May 2018
; 2.21 MB
- Sajini sc 1 charge vs active no of particles 200kV 400A 0 32.docx Suleiman
08:40, 21 May 2018
; 1.74 MB