Gallery of new files
Jump to navigation
Jump to search
This special page shows the last uploaded files.
- SIMULATION STUDY OF THE EMITTANCE MEASUREMENTS IN MAGNETIZED ELECTRON BEAM.pdf Sajini
11:02, 11 October 2019
; 852 KB
- Wien filter modeled in CTS by Gabriel and tested to 20kV per plate in UITF 2019.pptx Chgarcia
11:40, 8 October 2019
; 1.94 MB
- ACC2003000-0310 REV A CEBAF Small shield electrode & R28 black insulator assembly.pdf Chgarcia
13:37, 23 August 2019
; 91 KB
- CIS-ASY-R28-3 flange stamped with drawing number.JPG Chgarcia
13:30, 23 August 2019
4,032 × 3,024; 1.92 MB
- CIS-ASY-R28 3 Vac Fired engraved on flange.JPG Chgarcia
13:27, 23 August 2019
3,024 × 4,032; 2.01 MB
- JLAB-TN-18-020 Radiation Safety Aspects of the Upgraded Injector Test Facility Vashek Vylet.docx Poelker
15:38, 16 May 2019
; 3.75 MB
- Image rotation for emittance across cathode re-calculation.xlsx Chgarcia
11:05, 30 April 2019
; 106 KB
- Updated MeV songsheets Shaun Gregory drawings of "as built" beamline.pdf Poelker
13:21, 18 March 2019
; 3.44 MB
- UITF trunk cables and terminals between cross connects.pdf Hansknec
09:49, 27 February 2019
; 105 KB
- Our 400kV gun R&D plan for Joe KEK visit to JLab Feb 25 2019.pptx Chgarcia
16:09, 20 February 2019
; 25.68 MB
- Revised THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf Poelker
12:36, 20 February 2019
; 389 KB
- Revised OSP 82655 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf Poelker
12:36, 20 February 2019
; 2.39 MB
- THA for the OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF)revision2.pdf Poelker
12:06, 13 February 2019
; 521 KB
- OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx Poelker
12:05, 13 February 2019
; 23.07 MB
- OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf Poelker
12:05, 13 February 2019
; 2.59 MB
- Haysg JL0067948-MAGNETIZED BEAM THERMIONIC GUN ASSY 12Feb2019.pdf Suleiman
16:02, 12 February 2019
; 3.5 MB
- OSP-UITF keV beam operations approved revision3 approved OSP format with signatures.pdf Poelker
16:36, 11 February 2019
; 4.08 MB
- Haysg JL0067948-MAGNETIZED BEAM THERMIONIC GUN ASSY 28Jan2019.pdf Suleiman
10:32, 28 January 2019
; 3.55 MB
- Photo3 of MeV beamline girder under construction1.jpg Poelker
16:48, 22 January 2019
1,800 × 1,200; 423 KB
- Photo2 of MeV beamline girder under construction1.jpg Poelker
16:46, 22 January 2019
3,024 × 4,032; 2.6 MB
- Photo1 of MeV beamline girder under construction1.jpg Poelker
16:38, 22 January 2019
4,032 × 3,024; 2.68 MB
- Summary of beam parameter requirements for MOLLER Jan2019.pdf Suleiman
16:10, 21 January 2019
; 206 KB
- Revised north wall shielding plan per Walt - extended tile.jpg Poelker
12:15, 8 January 2019
1,824 × 1,024; 377 KB
- Requested modification of north pier to accommodate helium vent pipe.pdf Poelker
10:19, 8 January 2019
; 754 KB
- InjectorUpgradePlanning GPTsimsJayNewSolenoidDesign 2018 12 12.pptx Hofler
17:39, 11 December 2018
; 51.36 MB
- Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP.pdf Poelker
10:55, 3 December 2018
; 1.33 MB
- Sajini Space charge effect in magnetized beam 19Nov2018.pptx Suleiman
10:48, 21 November 2018
; 87 KB
- Paul Metcalf's draft PSS BCM engineering requirements document.pdf Poelker
12:53, 14 November 2018
; 1.74 MB