Gallery of new files
Jump to navigation
Jump to search
This special page shows the last uploaded files.
- JL0045108-A-dwg1 T-shape large shield electrode with groove.pdf Chgarcia
12:23, 3 February 2020
; 452 KB
- T-shape SS electrode on white R28 insulator & vacuum fired flange.JPG Chgarcia
11:41, 29 January 2020
3,024 × 4,032; 1.65 MB
- T-shape SS electrode on white R28 insulator iso view.JPG Chgarcia
11:38, 29 January 2020
4,032 × 3,024; 1.67 MB
- T-shape SS electrode on white R28 insultoar side view.JPG Chgarcia
11:37, 29 January 2020
4,032 × 3,024; 1.66 MB
- ACC2003000-0310 REV A CEBAF T-Shape electrode & ceramic assembly.pdf Chgarcia
11:11, 29 January 2020
; 226 KB
- UITF commissioning status Jan 15, 2020 Wed scheduling meeting MCC.pdf Poelker
09:29, 15 January 2020
; 3.06 MB
- UITF commissioning status Jan 15, 2020 Wed scheduling meeting MCC.pptx Poelker
17:22, 13 January 2020
; 11.99 MB
- UITF sweep procedure SSG-PR-03-101 Rev. 20.0 January 3, 2020.pdf Poelker
14:26, 6 January 2020
; 1.86 MB
- DOE Site Office permission to commission UITF accelerator.pdf Poelker
15:05, 3 January 2020
; 212 KB
- LERF cathode re-cesiation procedure revised Aug 2016 by CHG.pdf Chgarcia
10:08, 20 November 2019
; 66 KB
- SIMULATION STUDY OF THE EMITTANCE MEASUREMENTS IN MAGNETIZED ELECTRON BEAM.pdf Sajini
11:02, 11 October 2019
; 852 KB
- Wien filter modeled in CTS by Gabriel and tested to 20kV per plate in UITF 2019.pptx Chgarcia
11:40, 8 October 2019
; 1.94 MB
- ACC2003000-0310 REV A CEBAF Small shield electrode & R28 black insulator assembly.pdf Chgarcia
13:37, 23 August 2019
; 91 KB
- CIS-ASY-R28-3 flange stamped with drawing number.JPG Chgarcia
13:30, 23 August 2019
4,032 × 3,024; 1.92 MB
- CIS-ASY-R28 3 Vac Fired engraved on flange.JPG Chgarcia
13:27, 23 August 2019
3,024 × 4,032; 2.01 MB
- JLAB-TN-18-020 Radiation Safety Aspects of the Upgraded Injector Test Facility Vashek Vylet.docx Poelker
15:38, 16 May 2019
; 3.75 MB
- Image rotation for emittance across cathode re-calculation.xlsx Chgarcia
11:05, 30 April 2019
; 106 KB
- Updated MeV songsheets Shaun Gregory drawings of "as built" beamline.pdf Poelker
13:21, 18 March 2019
; 3.44 MB
- UITF trunk cables and terminals between cross connects.pdf Hansknec
09:49, 27 February 2019
; 105 KB
- Our 400kV gun R&D plan for Joe KEK visit to JLab Feb 25 2019.pptx Chgarcia
16:09, 20 February 2019
; 25.68 MB
- Revised THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf Poelker
12:36, 20 February 2019
; 389 KB
- Revised OSP 82655 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf Poelker
12:36, 20 February 2019
; 2.39 MB