Gallery of new files
Jump to navigation
Jump to search
This special page shows the last uploaded files.
- Sunil Pokharel presentation 200 keV beam into Grigory's quarter CM with Nb3Sn coated cavities.pdf Poelker
15:46, 29 April 2021
; 796 KB
- Hernandez-Garcia IEEE-abstract JLab approved and conference accepted.docx Chgarcia
13:56, 16 April 2021
; 22 KB
- UITF pucks in HV and prep chambers as of March 31 2021.jpg Chgarcia
14:56, 14 April 2021
3,024 × 4,032; 2.04 MB
- Max's RF power measurements related to nonlinear behavior of 2-cell GSet.pdf Poelker
14:26, 12 April 2021
; 108 KB
- Horizontal Wien Integrals (19.9A Hyst) with SCE410 CORRECT Ni plates.xlsx Chgarcia
08:57, 12 April 2021
; 1.82 MB
- Vertical & Horizontal Wien assembly procedure Rev01 April 6 2021.docx Chgarcia
15:26, 6 April 2021
; 4.13 MB
- Neil's old spreadsheet of installation group tasks associated with booster installation.xls Poelker
14:30, 17 March 2021
; 14 KB
- Neil's spreadsheet of installation group tasks associated with booster installation.xls Poelker
13:27, 17 March 2021
; 14 KB
- The sense circuit for 15 degree dipole magnet that provides gun HV permission.docx Poelker
14:17, 25 February 2021
; 901 KB
- Max's thoughts on impact of buncher on booster GSet calibration.pdf Poelker
11:19, 22 February 2021
; 4.4 MB
- JLab photoguns for Kevin presented at the morning meeting Feb 18 2021.pptx Chgarcia
11:28, 18 February 2021
; 13.44 MB
- Physics Division review of Andy's request for fourth run, so called run2b.pdf Poelker
11:34, 17 February 2021
; 48 KB
- Gun2 Tee electrode 200kV HV codnitoning plan 2021 draft01.pptx Chgarcia
09:20, 15 February 2021
; 418 KB
- Joe's slides describing UITF 210211 160317 UITF OpsReview Grames Redux.pptx Grames
17:23, 11 February 2021
; 4.05 MB
- Marcy's molflo simulations imagining a beamline accident at HDIce.pptx Poelker
14:02, 2 February 2021
; 189 KB
- Alicia's booster simulations amended since 2016 version1.pptx Poelker
12:09, 15 January 2021
; 7.46 MB
- V-Wien S&A electrodes only prior to use of teflon block spacers.xlsx Chgarcia
12:02, 8 January 2021
; 53 KB
- Andy's presentation at Hall B 'roundtable' discussion Run2 and 3 preliminary summary 1 6 21.pdf Poelker
14:22, 7 January 2021
; 3.68 MB
- CEBAF Wiens rebuild schedule Nov 13 2020.png Chgarcia
11:19, 13 November 2020
2,974 × 1,262; 1.24 MB
- Chapter 7 Modern Developments in Vacuum Electron Sources.pdf Poelker
10:32, 9 November 2020
; 3.31 MB
- Charpter 7 Modern Developments in Vacuum Electron Sources.pdf Poelker
10:29, 9 November 2020
; 3.31 MB
- CEBAF Wien rebuild schedule updated Oct 20 2020.png Chgarcia
15:19, 20 October 2020
1,999 × 693; 1.13 MB
- CEBAF Wien rebuild schedule updated Oct 19 2020.png Chgarcia
13:35, 20 October 2020
1,999 × 693; 1.13 MB
- SRF and CRYO tasks related to replumbing the CTF, between runs 1 and 2.jpg Poelker
19:43, 1 October 2020
793 × 873; 106 KB
- SRF and CRYO tasks related to replumbing the CTF, between runs 1 and 2.jpeg Poelker
19:39, 1 October 2020
793 × 873; 106 KB
- Vacuum vs applied voltage Wien rebuilt with alumina screws and washers.pdf Chgarcia
14:32, 17 August 2020
; 11.46 MB
- SF6 gas pressure vs weight table UITF & CEBAF HVPS tanks.png Chgarcia
16:58, 5 August 2020
2,274 × 1,534; 5.9 MB
- R30 resistor tank CST and POISSON models and SF6 breakdown curves.pptx Chgarcia
15:45, 5 August 2020
; 6.3 MB