Gallery of new files
Jump to navigation
Jump to search
This special page shows the last uploaded files.
- JLab DC gun developments Hernandez-Garcia EWPAA 2022.pptx Chgarcia
13:28, 6 September 2022
; 70.86 MB
- Existing Wien capabilities for LERF gun voltage Carlos' slides 08-24-2022.pptx Chgarcia
08:11, 24 August 2022
; 1.21 MB
- Valeria Calibration of a Mott polarimeter slides summer 2022.pdf Chgarcia
12:19, 2 August 2022
; 3.61 MB
- Valeria Calibration of a Mott polarimeter paper draft summer 2022.pdf Chgarcia
12:18, 2 August 2022
; 5.75 MB
- JL0029599-2068-SPOOL 1.50 DIA 2.75 NR X 2.75 ROT REV-, prelim.pdf Grames
14:07, 21 July 2022
; 392 KB
- JL0029599-1000, UITF KeV BEAMLINE SONG SHEET, REV B VER03 22.07.07.pdf Grames
15:52, 8 July 2022
; 2.08 MB
- JL0029599-1000, UITF KeV BEAMLINE SONG SHEET, REV B VER02 22.06.08.pdf Grames
14:42, 8 June 2022
; 2.09 MB
- Gabriel's thesis Electrostatic Design and Characterization of a 200 keV Photogun.pdf Chgarcia
07:45, 5 May 2022
; 4.86 MB
- CEBAF Wien filters HV system operational guidelines updated April 11 2022.pdf Chgarcia
15:48, 11 April 2022
; 1,004 KB
- NP Qtrly Report - Superconducting RF Electron Gun - Q2 2022.docx Suleiman
12:38, 11 April 2022
; 587 KB
- Injector Phase 1 HV chamber-prep chamber top view.jpg Chgarcia
12:14, 11 April 2022
481 × 640; 81 KB
- CEBAF Injector Phase 1 - 14" gun left side view.jpg Chgarcia
12:13, 11 April 2022
2,048 × 1,536; 404 KB
- High current polarized gun for positrons - slides for April 6 2022 meeting.pptx Chgarcia
14:49, 5 April 2022
; 16.08 MB
- DecaRad locations Nb T shape electrode on white R28 right view.png Chgarcia
14:51, 4 April 2022
1,335 × 999; 1.76 MB
- ACC2003000-0336, LOAD LOCK GUN H.V. CHAMBER U.S. FLANGE, REV-.pdf Chgarcia
14:02, 4 April 2022
; 545 KB
- Compton East Carolina Metal treatment metallurgy 3 24 2022.pdf Grames
08:53, 31 March 2022
; 4.94 MB
- UPDATE 1 -COMPTON POLARIZED TARGET MAXWELL Field analysis 032522.pptx Grames
08:52, 31 March 2022
; 5.33 MB
- Spreadsheet with pump down measurements used to estimate gauge pump speed.xls Poelker
16:55, 28 March 2022
; 15.35 MB
- DRAFT 2 Slides for Joe on the high current polarized HV gun plans.pptx Grames
09:32, 21 March 2022
; 20.62 MB
- Electrode ball after 950 C for 6 hours vacuum degassing.jpg Chgarcia
08:52, 17 March 2022
481 × 640; 73 KB
- Electrodes in containers after 950 C vacuum degassing.jpg Chgarcia
08:51, 17 March 2022
640 × 481; 84 KB
- Certification sheets of all low carbon steel procured up to March 14 2022.pdf Poelker
10:46, 14 March 2022
; 1.9 MB
- High current polarized gun schedule + labor estimates Rev01.xlsx Chgarcia
14:04, 10 March 2022
; 15 KB
- Current gun aassembly and proposed final step in SRF clnrm.pptx Chgarcia
09:04, 10 March 2022
; 1.99 MB
- 2022 03 08 Beam kick study with GTS modified gun presented at B-Team meeting Mamun.pdf Mamun
12:02, 9 March 2022
; 2.59 MB