New pages
(newest | oldest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)
- 14:49, 17 May 2022 May 17, 2022 - updates (hist) [1,956 bytes] Chgarcia (Talk | contribs) (Created page with "'''Updates''' # Anode flange designed based on Injector Phase 1 but with two HV ports #* The used zero length reducer 10" to 4-1/2" flanges from the GTS that looks it has a be...")
- 07:51, 17 May 2022 PPB - May 18, 2022 (hist) [1,088 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT (local Virginia time) * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_May...")
- 08:14, 10 May 2022 PPB - May 11, 2022 (hist) [1,123 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT (local Virginia time) * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_May...")
- 08:39, 4 May 2022 May the 4th, 2022 -updates (hist) [2,411 bytes] Chgarcia (Talk | contribs) (Created page with "==Agenda== '''Updates''' # Anode flange designed based on Injector Phase 1 but with two HV ports #* Drawing complete and sent for approval #* One zero length reducer 10" to 4...")
- 07:53, 3 May 2022 PPB - May 04, 2022 (hist) [1,059 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT (local Virginia time) * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_May...")
- 09:04, 26 April 2022 April 26, 2022 - updates (hist) [2,028 bytes] Chgarcia (Talk | contribs) (Created page with "==Agenda== '''Updates''' # Anode flange designed based on Injector Phase 1 but with two HV ports #* Bubba i placing the order for: #*2 one zero length reducer 10" to 4-1/2" f...")
- 07:56, 26 April 2022 PPB - Apr 27, 2022 (hist) [1,443 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT (local Virginia time) * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Apr...")
- 12:52, 25 April 2022 April 26, 2022 - Group meeting (hist) [884 bytes] Suleiman (Talk | contribs) (Created page with "; CEBAF: * SAD Jobs (Mott ladder, restore lasers/systems, bleed through beam studies, heat/activate, ?) * Next run period (on-call, June through March) * Next run period physi...")
- 09:20, 25 April 2022 Chiral Molecules (hist) [72 bytes] Grames (Talk | contribs) (Created page with "* 4/22/22 - Michael Famiano visit to Jlab media220425_JLab_talk.pdf")
- 14:43, 20 April 2022 April 21, 2022 - HV chamber layout for installation in CEBAF (hist) [1,153 bytes] Marcy (Talk | contribs) (Created page with "== Screen Design == Marcy dimension requests screens18gun.pptx")
- 08:19, 19 April 2022 PPB - Apr 20, 2022 (hist) [1,247 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT (local Virginia time) * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Apr...")
- 12:58, 13 April 2022 April 19, 2022 - Group meeting (hist) [389 bytes] Suleiman (Talk | contribs) (Created page with "; CEBAF: * SAD Jobs (Mott ladder, restore lasers/systems, bleed through beam studies, heat/activate, ?) * Next run period (on-call, June through March) * Next run period physi...")
- 13:35, 12 April 2022 PPB - Apr 13, 2022 (hist) [658 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT (local Virginia time) * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Apr...")
- 09:21, 12 April 2022 April 13, 2022 - HV chamber layout for installation in CEBAF (hist) [1,882 bytes] Chgarcia (Talk | contribs) (Created page with "==Agenda== '''Critical path action items''' # Define if anode tube will be permanently at ground, or will be electrically isolated by April 13 # Verify HV chamber dimensions...")
- 13:02, 5 April 2022 PPB - Apr 6, 2022 (hist) [842 bytes] Grames (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT (local Virginia time) * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Mar...")
- 14:00, 4 April 2022 Anode flange prints and pictures (hist) [875 bytes] Chgarcia (Talk | contribs) (Created page with "'''Prints''' *Media:ARC19325.pdf *Media:ACC2003000-0336, LOAD LOCK GUN H.V. CHAMBER U.S. FLANGE, REV-.pdf '''Pictures''' *Media:Anode flange hogged out pic02.jpg...")
- 13:51, 4 April 2022 April 6, 2022 - HV chamber ME jobs (hist) [661 bytes] Chgarcia (Talk | contribs) (Created page with "==Agenda== # Anode assembly prints update from Shaun # Anode flange discussion # HV chamber feet discussion #* CEBAF HV chamber centerline is 13-3/4" above table #* UITF HV c...")
- 12:42, 31 March 2022 Designs (hist) [2,957 bytes] Marcy (Talk | contribs) (Created page with " ==== JLab document control prints ==== == Gun Designs == == Gun Table == Table top: ACC-200-3000-0171 == Y chamber(s) == == Wien filters == == DP cans == Narro...")
- 09:37, 31 March 2022 Presentations (hist) [1,189 bytes] Chgarcia (Talk | contribs) (Created page with "* 03/30/2021 Simulation of the anode tube for 6 and 12-slots Media: R30-3_SLOTS.pptx * 03/02/2021 Simulation of the anode hinge. Shaun's latest model, FINER MESH Media:...")
- 08:33, 31 March 2022 Meeting 3/31/22 - COMTRA (hist) [1,018 bytes] Grames (Talk | contribs) (Created page with "== Agenda == ; Eric's plan at IJCLab for crystals ; DAQ status ; Magnet status ; UITF plan * April - finish design & assembly of Wien and Mott hardware, finish 200 KV HV v...")
- 19:04, 29 March 2022 PPB - Mar 30, 2022 (hist) [736 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT (local Virginia time) * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Mar...")
- 17:22, 28 March 2022 Protocols (hist) [225 bytes] Poelker (Talk | contribs) (Created page with "media:Ashley's etch recipe.pdf media:Big Blue heat protocol from Tom Elliot to 900C.docx media:Big Blue data file for 2 reducers for test apparatus #2 and the flan...")
- 16:54, 28 March 2022 Water outgassing results from 1020 tube (hist) [149 bytes] Poelker (Talk | contribs) (Created page with "Joseph's KL cold cathode pirani gauge pump speed measurements media:spreadsheet with pump down measurements used to estimate gauge pump speed.xls")
- 11:04, 28 March 2022 Mar 29, 2022 - Update Meeting (hist) [589 bytes] Chgarcia (Talk | contribs) (Created page with "==Agenda== 1. Target timeframe to have the gun installed in UITF is early June 2. Update from Shaun on anode assembly prints. 3. Priorities for ME 3.1 NEG screens: what is n...")
- 08:56, 22 March 2022 Mar 22, 2022 - Group meeting (hist) [1,668 bytes] Grames (Talk | contribs) (Created page with "==Agenda== ; Halfway through FY23 .... how do we spend an average 40 hour week... * Joe - 50% MGT, 25% RSR, 25% R&D * Carlos - 50% RSR, 50% R&D * Riad - 50% RSR, 50% R&D * Sh...")
- 08:31, 22 March 2022 Mar 23, 2022 - Update Meeting (hist) [333 bytes] Chgarcia (Talk | contribs) (Created page with "==Agenda== * NEG screens * HV chamber * Layouts for installing HV chamber in UITF and in CEBAF * [https://jlab-org.zoomgov.com/j/1617282949?pwd=ZDBoQXc0UWw3S01WQzZOYXFRb29Bdz0...")
- 09:20, 21 March 2022 PPB - Mar 23, 2022 (hist) [1,831 bytes] Grames (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT (local Virginia time) * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Mar...")
- 10:08, 16 March 2022 Mar 17, 2022 - Update Meeting (hist) [2,576 bytes] Chgarcia (Talk | contribs) (Created page with "==Agenda== * NEG screens - Marcy * Gun table layouts (UITF, CEBAF) - Shaun * Anode tube versions ** Shaun sent Gabriel models for the 12 narrow and for the 6 wide slot tubes *...")
- 14:12, 15 March 2022 PPB - Mar 16, 2022 (hist) [1,349 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am DST V.A time * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php?title=PPB_-_Mar_09,_20...")
- 19:34, 14 March 2022 Mar 15, 2022 - Group meeting (hist) [323 bytes] Grames (Talk | contribs) (Created page with "==Agenda== * CEBAF ** Mott ladder ** Prebuncher tests ** April Beam studies SAD restart ** Bleed through (high pass filter, fiber modulator, Mott po...")
- 09:56, 14 March 2022 Materials certification sheets (hist) [200 bytes] Poelker (Talk | contribs) (Created page with "100px")
- 09:36, 14 March 2022 Fred's meeting agendas and summaries (hist) [80 bytes] Poelker (Talk | contribs) (Created page with "CERN mtg minutes 3_2_2022 media: CERN meeting minutes from Fred 3_2_2022.pdf")
- 09:04, 10 March 2022 March 10 2022: Disscussion with SRF production team to install electrode in clnrm (hist) [670 bytes] Chgarcia (Talk | contribs) (Created page with "* We are considering lowering the electrode-insulator assembly into the gun HV chamber as the last step, but in the SRF production clean room, instead of in the tunnel or in t...")
- 08:56, 10 March 2022 Update meetings (hist) [664 bytes] Chgarcia (Talk | contribs) (Created page with "* test")
- 20:07, 8 March 2022 Mar 9, 2022 - Group meeting (hist) [659 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * On-site in TL-1227 * Zoom https://jlab-org.zoomgov.com/j/1619764149?pwd=dWpNeG9mWFdIOGdObXpNRnFvaWVhUT09 ==Announcements== * MEDCON-3 * IPAC * New...")
- 17:46, 8 March 2022 PPB - Mar 09, 2022 (hist) [986 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am UTC−5 V.A time * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Feb_23,_2022...")
- 19:51, 3 March 2022 CIS Career Opportunities (hist) [763 bytes] Grames (Talk | contribs) (Created page with "We presently have two openings * CIS Post-doc [https://careers.peopleclick.com/careerscp/client_jeffersonlab/external/en-us/gateway.do?functionName=viewFromLink&jobPostId=230...")
- 14:51, 2 March 2022 JLab presentations to CERN CE and ET collaboration (hist) [63 bytes] Poelker (Talk | contribs) (Created page with " '''2022''' media:JLab's first water OR measurements.pptx")
- 14:50, 2 March 2022 CERN Cosmic Explorer/Einstein Telescope meeting presentations and meeting minutes (hist) [96 bytes] Poelker (Talk | contribs) (Created page with "Fred's meeting agendas and summaries JLab presentations to CERN CE and ET collaboration")
- 14:46, 2 March 2022 Hydrogen outgassing results from 1020 tube (hist) [209 bytes] Poelker (Talk | contribs) (Created page with "media:Mamun's summary sheet of hydrogen outgassing rate measurements for 1020 steel sample 1.xls")
- 14:44, 2 March 2022 Low carbon steel (hist) [444 bytes] Poelker (Talk | contribs) (Created page with " * <span style="font-size:100%"> '''hydrogen outgassing results from 1020 tube''' </span> * <span style="font-size:100%"> '''water outgassing results from 1020 tube''...")
- 14:42, 2 March 2022 Vacuum (hist) [91 bytes] Poelker (Talk | contribs) (Created page with "== Vacuum Topics == * <span style="font-size:100%"> '''low carbon steel''' </span>")
- 17:14, 1 March 2022 PPB - Mar 02, 2022 (hist) [651 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am UTC−5 V.A time * On-site => we will meet in TL-2221 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Feb_23,_2022...")
- 07:27, 23 February 2022 Feb 23, 2022 - Group meeting (hist) [1,307 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * On-site in TL-1227 * Zoom https://jlab-org.zoomgov.com/j/1619764149?pwd=dWpNeG9mWFdIOGdObXpNRnFvaWVhUT09 ==Announcements== * Group and single photo...")
- 17:21, 22 February 2022 PPB - Feb 23, 2022 (hist) [883 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am UTC−5 V.A time * On-site => we will meet in TL-2221 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Feb_23,_2022...")
- 14:06, 14 February 2022 PPB - Feb 16, 2022 (hist) [722 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am UTC−5 V.A time * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Feb_9,_2022...")
- 09:56, 10 February 2022 Meeting 2/10/22 - COMTRA (hist) [353 bytes] Grames (Talk | contribs) (Created page with "==First installation== * Radiator + ceramic in TL-1137, MIT polarized target + detector removed, survey then to TL https://logbooks.jlab.org/entry/3984465 * ME layout ==DAQ s...")
- 10:44, 8 February 2022 PPB - Feb 9, 2022 (hist) [418 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT * On-site => we will meet in TL-2236 * Meeting wiki => https://wiki.jlab.org/ciswiki/index.php/PPB_-_Feb_2,_2022 * Zoom => h...")
- 21:10, 2 February 2022 February Beam Ops (hist) [4,056 bytes] Moser (Talk | contribs) (Created page with "{| class="wikitable" style="text-align:center; background-color:#CFE0E8;" |- style="font-weight:bold; vertical-align:middle; background-color:#87BDD8;" ! style="background-col...")
- 16:06, 2 February 2022 Meeting 2/3/22 - COMTRA (hist) [446 bytes] Grames (Talk | contribs) (Created page with "==Agenda== ==First installation== ** remove ~4' pipe in straight passthrough ** add reducer + ceramic break + bubble radiator ** add MIT bates magnet + Mott detector on the s...")
- 09:54, 2 February 2022 Feb 2, 2022 - Group meeting (hist) [2,086 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * On-site in TL-1227 * Zoom https://jlab-org.zoomgov.com/j/1619764149?pwd=dWpNeG9mWFdIOGdObXpNRnFvaWVhUT09 ==Agenda== * I'd like to discuss jobs and...")
- 13:11, 1 February 2022 PPB - Feb 2, 2022 (hist) [647 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT * Zoom => https://zoom.us/j/96213295403?pwd=N2F1cVc0cVJmUmpBNmpmcEVEeEJaZz09 ==Agenda Feb 2, 2022== * Round table updates.")
- 14:54, 27 January 2022 Xi's AccApp21 presentation on 1,4dioxane elimination (hist) [274 bytes] Poelker (Talk | contribs) (Created page with "https://jeffersonlab.sharepoint.com/:p:/s/WaterSampleIrradiation/EV1Jnf_BdV1In6jmz6L8AuIBqwCE6PvxvFnKNnts9qDj_w?e=7kEZ8u and for pdf version: media:Xi's NA AccApp21 presen...")
- 06:16, 27 January 2022 Meeting 1/27/22 - COMTRA (hist) [2,503 bytes] Grames (Talk | contribs) (Created page with "==Eric's update cyrstals== - I am in contact with the Alpha-Spectra company which was providing BGO crystals for a local project we had in Orsay. This is a US company which...")
- 23:08, 26 January 2022 200 kV Gun - Jan 26, 2022 (hist) [1,169 bytes] Grames (Talk | contribs) (Created page with "At today's meeting we decided on following ME tasks, # ground screen - open wire mesh w/ frame + connectors to tabs # anode design - flat & tilted grounded tube + slots for...")
- 23:03, 26 January 2022 200 kV Polarized Gun (hist) [279 bytes] Grames (Talk | contribs) (Created page with "==Meetings== 200 kV Gun - Jan 26, 2022 == Links == * [https://wiki.jlab.org/ciswiki/index.php/18%22_Photogun_ala_GTS Carlos 18" Gun Page]")
- 10:03, 25 January 2022 PPB - Jan 26, 2022 (hist) [334 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT * Zoom => https://zoom.us/j/96213295403?pwd=N2F1cVc0cVJmUmpBNmpmcEVEeEJaZz09 ==Agenda Jan 26, 2022== * 2022 Positron worki...")
- 13:38, 18 January 2022 Jan 19, 2022 - Group meeting (hist) [569 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * On-site in TL-1227 * Zoom https://jlab-org.zoomgov.com/j/1619764149?pwd=dWpNeG9mWFdIOGdObXpNRnFvaWVhUT09 ==Agenda== * I'd like to discuss jobs and...")
- 13:19, 17 January 2022 UITF Mott Apparatus (hist) [79 bytes] Suleiman (Talk | contribs) (Created page with " =='''Vacuum Chamber'''== =='''Collimators'''== =='''Target Ladder'''==")
- 12:34, 17 January 2022 UITF Mott Detectors (hist) [2,541 bytes] Suleiman (Talk | contribs) (Created page with " =='''ORTEC Electronics Modules'''== * (1) ORTEC 710 Quad High Voltage Bias Supply (1 - 1000 V) * (2) ORTEC 142A Preamplifier for detector input capacitance 0 to 100 pF (con...")
- 09:08, 17 January 2022 PPB - Jan 19, 2022 (hist) [212 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Wednesday @ 11am EDT * On-site => we will meet in TL-2236 * Zoom => https://zoom.us/j/96213295403?pwd=N2F1cVc0cVJmUmpBNmpmcEVEeEJaZz09")
- 10:01, 15 January 2022 UITF Mott Online Monitoring (hist) [1,490 bytes] Suleiman (Talk | contribs) (Created page with "== Scalers: '''xscaler''' == "xscaler" is a graphical display of the scalers from the Mott DAQ. Login to opsmdaq0 as the "idaq" user (ssh idaq@opsmdaq0). To run xscaler yo...")
- 10:00, 15 January 2022 UITF Mott Analysis (hist) [8,384 bytes] Suleiman (Talk | contribs) (Created page with "=='''Data Files'''== CODA writes the data to this disk: /data/mott =='''Decode a Run'''== You must log on to the idaq account of the opsmdaq0 machine, a la: <span sty...")
- 09:58, 15 January 2022 UITF Mott CODA Scripts (hist) [681 bytes] Suleiman (Talk | contribs) (Created page with "{| class="wikitable" |- | '''Component''' | '''Transition''' | '''Script''' | '''Purpose''' | '''EPICS List''' |- | ER1 | go | /opt/idaq/scripts/refreshrun | Update MottRunNum...")
- 10:49, 12 January 2022 Jan 12, 2022 - Group meeting (hist) [591 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * On-site in TL-1227 * Zoom https://jlab-org.zoomgov.com/j/1619764149?pwd=dWpNeG9mWFdIOGdObXpNRnFvaWVhUT09 ==Agenda== * Announcements * CEBAF * Gun...")
- 10:20, 12 January 2022 Winter SAD 2022 (hist) [2,379 bytes] Grames (Talk | contribs) (Created page with "==FY22 SAD ATLIS Tasks== ===Schedule=== * CEBAF SAD runs from Feb 8 - Jun 8 (about 4 months) media:210112_SAD_timeline.pdf * Jason Willoughby is installing bright white...")
- 17:44, 11 January 2022 Modeling Photocathodes (hist) [1,097 bytes] Grames (Talk | contribs) (Created page with " ==References== * (2021) "Monte Carlo Modeling of Spin-polarized Photoemission from p-doped GaAs Activated to Negative Electron Affinity" https://arxiv.org/abs/2106.13356 * (...")
- 11:47, 11 January 2022 Dec 12, 2022 - Group meeting (hist) [494 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * On-site We'll meet in TL-1227. * Zoom https://jlab-org.zoomgov.com/j/1619764149?pwd=dWpNeG9mWFdIOGdObXpNRnFvaWVhUT09 Meeting ID: 161 976 4149 P...")
- 14:35, 10 January 2022 UITF Mott CODA Summary (hist) [10,909 bytes] Suleiman (Talk | contribs) (Created page with "=='''OPS Network'''== Mott DAQ Host: name => opsmdaq0 ip => 129.57.236.240 Mott DAQ SBC: name => sbcmdaq0 ip...")
- 14:21, 10 January 2022 How to run UITF Mott CODA (hist) [4,610 bytes] Suleiman (Talk | contribs) (Created page with "=='''CODA Startup'''== go to injector -> spin -> mott measurement control and open scripts there see "startcoda help" for diretions on using CODA Obsolete way: From an...")
- 11:22, 20 December 2021 CIS-ASY-R30-3 (hist) [857 bytes] Chgarcia (Talk | contribs) (Created page with "* 18" HV chamber NEG coated and originally built with WP NEG modules and wire mesh screen * 10" CF flange vacuum fired * R30 pure alumina insulator * Spherical electrode * Pie...")
- 15:01, 16 December 2021 PPB - Dec 17, 2021 (hist) [215 bytes] Samih (Talk | contribs) (Created page with "===Meeting Coordinates=== * Fridays @ 10am EDT * On-site => we will meet in TL-2236 * Bluejeans => https://bluejeans.com/703234224/2959 * Meeting wiki => https://wiki.jlab.o...")
- 12:32, 16 December 2021 Zoom Link (hist) [78 bytes] Marcy (Talk | contribs) (Created page with "https://jlab-org.zoomgov.com/j/1601304841?pwd=Z1RIOVVUdkdXL2R2LzREZUNOUlh1dz09")
- 16:21, 10 December 2021 CIS-ASY-R30-2 (hist) [562 bytes] Chgarcia (Talk | contribs) (Created page with " 18" HV chamber with NEG strips 10" CF flange vacuum fired with holes for S&A tooling R30 pure alumina insulator Spherical electrode FLAT geometry electrode front end 6" anode...")
- 15:19, 10 December 2021 CIS-ASY-R30-1 (hist) [1,078 bytes] Chgarcia (Talk | contribs) (Created page with " *18" HV chamber with WP NEG modules and perforated shield screen *10" CF flange vacuum fired and engraved with CIS-ASY-R30-1 reference *R30 doped alumina insulator *Spherical...")
- 21:46, 9 December 2021 PPB - Dec 10, 2021 (hist) [442 bytes] Grames (Talk | contribs) (Created page with "===Meeting Coordinates=== * Fridays @ 10am EDT * On-site => we will meet in TL-2236 * Bluejeans => https://bluejeans.com/405130883/4307 * Meeting wiki => https://wiki.jlab.o...")
- 12:59, 7 December 2021 Dec 9, 2021 - Group meeting (hist) [1,080 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * We will on THURSDAY DEC 9 @ 11am in TL-1227 * Bluejeans available if we need it: https://bluejeans.com/7572697097 The ME group will join us for thi...")
- 12:46, 7 December 2021 Dec 8, 2021 - Group meeting (hist) [893 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * We will on Wednesday at 10am @ TL-1227 * Bluejeans available if we need it: https://bluejeans.com/7572697097 The ME group will join us for this Wed...")
- 18:42, 2 December 2021 PPB - Dec 2, 2021 (hist) [1,548 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * Fridays @ 10am EDT * On-site => we will meet in TL-2236 * Bluejeans => https://bluejeans.com/405130883/4307 ==Agenda== ===General Topics=== * Mov...")
- 15:02, 2 December 2021 HarmonicKicker-2021-12-02 (hist) [765 bytes] Bruker (Talk | contribs) (Created page with "== Beam line components == * Vacuum ** ~ 8 meters of beam line, mostly drift, 602 valve should be enough ** Are extra valves around the HK needed? ** Ion pump + viewer assemb...")
- 13:20, 30 November 2021 Dec 1, 2021 - Group meeting (hist) [719 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * We will on Wednesday at 10 am in TL-1227 @ the special time. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ==Agenda== * Car...")
- 19:24, 22 November 2021 UITF Tasks Requiring Attention (hist) [9,904 bytes] Michaelm (Talk | contribs) (Created page with "'''To-do list (Things that are broken at UITF, or could be improved upon...)''' Updated 11/21 General: #Add sufficient concrete shielding to raise deliverable current; valida...")
- 09:07, 17 November 2021 PPB - Nov 19, 2021 (hist) [1,199 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * Fridays @ 10am EDT * On-site => we will meet in TL-2236 * Bluejeans => https://bluejeans.com/405130883/4307 ==Round-Table Agenda== ===(15 min) Jo...")
- 14:34, 16 November 2021 Nov 16, 2021 - Group meeting (hist) [824 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * We will meet in person on Wednesday at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ==Agenda== * Gabriel...")
- 16:30, 11 November 2021 PPB - Nov 12, 2021 (hist) [851 bytes] Grames (Talk | contribs) (Created page with "===Meeting Coordinates=== * Fridays @ 10am EDT * On-site => we will meet in TL-2236 * Bluejeans => https://bluejeans.com/405130883/4307 ===Round-Table Agenda=== * (30 min)...")
- 20:58, 4 November 2021 PPB - Nov 5, 2021 (hist) [579 bytes] Grames (Talk | contribs) (Created page with "===Meeting Coordinates=== * Fridays @ 10am EDT * On-site => we will meet in TL-2236 * Bluejeans => https://bluejeans.com/405130883/4307 ===Round-Table Agenda=== * Mark - 1...")
- 16:32, 2 November 2021 Nov 3, 2021 - Group meeting (hist) [1,303 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * We will meet in person on Wednesday at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ==Agenda== ===Gener...")
- 17:41, 28 October 2021 Yan's previous booster assessments for reference (hist) [143 bytes] Poelker (Talk | contribs) (Created page with "media:Yan booster tests March 2021.pptx media:Yan booster tests ver1 April 2021.pptx media:Yan booster tests ver2 April 2021.pptx")
- 09:19, 28 October 2021 PPB - Oct 29, 2021 (hist) [1,275 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * We will meet in person on Wednesday at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ==Agenda== ===Gener...")
- 14:57, 27 October 2021 JLab-keV-Mott (hist) [733 bytes] Grames (Talk | contribs) (Created page with " === Detectors === * 50 deg - Ortec BU-012-050-100 (s/n 38-130Z15, 38-130Z16); bias = 50 V; Noise 4.6 keV fwhm; Alpha resolution 12 keV fwhm * 120 deg -")
- 21:37, 26 October 2021 Oct 27, 2021 - Group Meeting (hist) [930 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * We will meet in person on Wednesday at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ==Agenda== ===Round...")
- 21:11, 19 October 2021 Oct 20, 2021 - Group Meeting (hist) [662 bytes] Grames (Talk | contribs) (Created page with "==Meeting Coordinates== * We will meet in person on Wednesday at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ==Agenda== * final?...")
- 09:43, 14 October 2021 PPB - Oct 15, 2021 (hist) [418 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Fri ('''UAS 8am''', JLab 10am, IJCLab 4pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Oct 15 Agend...")
- 19:00, 12 October 2021 Oct 13, 2021 - Group Meeting (hist) [1,739 bytes] Grames (Talk | contribs) (Created page with "; Meeting Coordinates * Weekly group meetings Wednesdays at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ; Agenda * Lab's vaccinat...")
- 08:08, 5 October 2021 PPB - Oct 8, 2021 (hist) [962 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 8am''', JLab 10am, IJCLab 4pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Oct 8 Agenda...")
- 08:34, 4 October 2021 Oct 4, 2021 - Tune Mode Generator (hist) [1,766 bytes] Grames (Talk | contribs) (Created page with "Let's meet on Monday 10/4 @ 9am. We'll be in TL-2236 and/or join by bluejeans: https://bluejeans.com/7572697097 * Scott's summary media:211004 - Quick TMG History.docx")
- 16:09, 28 September 2021 PPB - Sep 28, 2021 (hist) [1,204 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Sep 22 Agend...")
- 08:26, 27 September 2021 Sep 29, 2021 - Group Meeting (hist) [700 bytes] Grames (Talk | contribs) (Created page with "; Meeting Coordinates * Weekly group meetings Wednesdays at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ; Standing Links * Carlos...")
- 19:50, 22 September 2021 Robust Meeting - Sep 23, 2021 (hist) [375 bytes] Grames (Talk | contribs) (Created page with "Bluejeans: https://bluejeans.com/7572697097 ;Topics # Sb activation and lifetime tests # U-Wien filter media:210923_UWien.xlsx # Mott polarimeter # Mott DAQ media:2109...")
- 19:49, 21 September 2021 Sep 22, 2021 - Group Meeting (hist) [496 bytes] Grames (Talk | contribs) (Created page with "; Meeting Coordinates * Weekly group meetings Wednesdays at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ;Today's Topics * Gabriel...")
- 06:43, 21 September 2021 PPB - Sep 22, 2021 (hist) [1,074 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Sep 22 Agend...")
- 10:37, 17 September 2021 HarmonicKicker-2021-09-17 (hist) [223 bytes] Michaelm (Talk | contribs) (Created page with "'''Agenda:''' *Discussion on the HAWG and the interface with JLAB control system *CW operation and possible pulsed operation: Tomasz and Brock *BPM capability to measure two b...")
- 18:23, 16 September 2021 Facility Overview (hist) [1,963 bytes] Michaelm (Talk | contribs) (Created page with "'''Summary''' ''Radiological Data'' [https://logbooks.jlab.org/entry/3906224| Commissioning Survey to Wastewater Target]")
- 14:18, 14 September 2021 Sep 15, 2021 - Group Meeting (hist) [685 bytes] Grames (Talk | contribs) (Created page with "; Meeting Info * Weekly group meetings Wednesdays at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ;Topics * TA's (14 working days...")
- 08:42, 14 September 2021 PPB - Sep 15, 2021 (hist) [764 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Sep 15 Agend...")
- 18:44, 9 September 2021 HarmonicKicker-2021-08-27 (hist) [168 bytes] Michaelm (Talk | contribs) (Created page with "Agenda: # Revisit the project background and test plan for Shukui/John/Tomasz. # Discussion on the LLRF concept, especially the HAWG/LLRF interface # Discussion on BPMs")
- 18:37, 9 September 2021 Harmonic Kicker Test (hist) [1,196 bytes] Michaelm (Talk | contribs) (Created page with "'''Proposal (Overleaf)''' [https://www.overleaf.com/8411236577ttnxhtghrgpg Kicker Test]")
- 12:57, 8 September 2021 9/8/21 (hist) [665 bytes] Yoskowij (Talk | contribs) (Created page with "'''Completed''' *Ionization custom element complete and benchmarked (as of Feb 2021) *Rough draft of biased anode paper, GPT and biased anode thesis chapters *Presented custo...")
- 08:45, 7 September 2021 Sep 08, 2021 - Group Meeting (hist) [1,123 bytes] Grames (Talk | contribs) (Created page with "; Next SAD & Building 200 kV Gun for CEBAF ===List of SAD Jobs=== ===CEBAF 200 kV Gun Jobs=== Carlos - Status of small gun HV limits, CEBAF and UITF Carlos - GTS gun HV desig...")
- 06:20, 7 September 2021 PPB - Sep 8, 2021 (hist) [476 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Sep 8 Agenda...")
- 06:39, 1 September 2021 Sep 01, 2021 - Group Meeting (hist) [2,606 bytes] Grames (Talk | contribs) (Created page with "; Meeting Info * Weekly group meetings Wednesdays at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ;General Info * SPIN 2021 abstra...")
- 22:49, 31 August 2021 UITF Notes (hist) [12 bytes] Bruker (Talk | contribs) (Created page with "== Opportunistic tests and long-term ideas off the top of my head == * Make sure we know which peak is which in the harp scans (make beam spot asymmetric and compare with vie...")
- 07:38, 31 August 2021 PPB - Sep 1, 2021 (hist) [669 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Aug 25 Agend...")
- 07:34, 31 August 2021 PPB - Sept 1, 2021 (hist) [435 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Aug 25 Agend...")
- 08:20, 27 August 2021 8/27/21 - JLab-Euclid meeting (hist) [420 bytes] Grames (Talk | contribs) (Created page with "Today's bluejeans link: https://bluejeans.com/7572697097 This summer we installed the Mott diamond target at CEBAF, had beam test opportunities. At today's meeting Marcy su...")
- 07:25, 25 August 2021 PPB - Aug 25, 2021 (hist) [471 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Aug 25 Agend...")
- 06:27, 25 August 2021 Aug 25,, 2021 - Group Meeting (hist) [1,550 bytes] Grames (Talk | contribs) (Created page with "; Meeting Info * Weekly group meetings Wednesdays at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ;General Info * SPIN 2021 abstra...")
- 22:49, 24 August 2021 2021-08-25 (hist) [3,750 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 06:42, 18 August 2021 Aug 18, 2021 - Group Meeting (hist) [2,035 bytes] Grames (Talk | contribs) (Created page with "; Meeting Info * Weekly group meetings Wednesdays at 10 am in TL-1227. * Bluejeans available if we need it: https://bluejeans.com/7572697097 ;General Info * JSA Initiatives...")
- 22:19, 17 August 2021 2021-08-18 (hist) [4,441 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 17:36, 17 August 2021 PPB - Aug 19, 2021 (hist) [855 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Aug 19 Agend...")
- 12:27, 11 August 2021 PPB Geant4 wrappers (hist) [209 bytes] Mstefani (Talk | contribs) (Created page with "===Geant4 Software Wrapper Programs === Target Geometries: *pyg4ometry **http://www.pp.rhul.ac.uk/bdsim/pyg4ometry/ Beam Delivery Simulation (BDSIM): *Geant4 toolkit **http...")
- 08:23, 11 August 2021 2021-08-11 (hist) [7,211 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 11:26, 10 August 2021 Bubble Chamber Meeting Tuesday August 17, 2021 (hist) [311 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday August 17 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
- 14:35, 9 August 2021 PPB - Aug 11, 2021 (hist) [967 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Aug 11 Agend...")
- 07:46, 5 August 2021 Magnet (hist) [1,115 bytes] Chgarcia (Talk | contribs) (Created page with "* The steel magnet yoke and its coil are stored in the Wien cabinet in the test lab. Both coil and and steel yoke are copies of the CEBAF upgrade Wiens, to operate at 15 A for...")
- 07:37, 5 August 2021 Electrode plates (hist) [482 bytes] Chgarcia (Talk | contribs) (Created page with "* One pair of electrodes made from a single piece of SS in a CNC machine (by Xometry, not very good quality, next time use the JLab machine shop) are being polished by Bubba...")
- 07:34, 5 August 2021 Tasks U-Wien (hist) [476 bytes] Chgarcia (Talk | contribs) (Created page with "* <span style="font-size:100%"> '''Magnet''' </span> * <span style="font-size:100%"> '''Electrode plates''' </span> * <span style="font-size:100%"> '''Assembly''...")
- 16:18, 4 August 2021 Background (hist) [2,454 bytes] Chgarcia (Talk | contribs) (Created page with "The Wien filter (AKA U-WIen) is based on the CEBAF Wien design. It was first built using brazed electrodes, spare from CEBAF V-Wien, and 20 kV SHV-style feedthroughs. New magn...")
- 15:57, 4 August 2021 UITF Wien (hist) [293 bytes] Chgarcia (Talk | contribs) (Created page with "* <span style="font-size:100%"> '''Tasks''' </span> * <span style="font-size:100%"> '''Drawings''' </span> * <span style="font-size:100%"> '''Electrostatic and be...")
- 11:17, 4 August 2021 PPB - Aug 4, 2021 (hist) [1,284 bytes] Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Aug 4 Agenda...")
- 08:16, 4 August 2021 Aug 4, 2021 - Group Meeting (hist) [2,449 bytes] Grames (Talk | contribs) (Created page with ";Group business * JSA Initiatives program deadline Aug 27 http://www.jsallc.org/CP22.html ;CEBAF * Still tartgeting Aug 23 * On-call, Shukui laser training? * Gun lifetime l...")
- 18:10, 3 August 2021 2021-08-04 (hist) [7,363 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 11:37, 3 August 2021 Bubble Chamber Meeting Tuesday August 10, 2021 (hist) [311 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday August 10 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
- 15:21, 28 July 2021 Wastewater Experiment Commissioning Plan (hist) [11,909 bytes] Michaelm (Talk | contribs) (Created page with "Lorem Ipsum")
- 14:39, 28 July 2021 Proposed Experiments (hist) [156 bytes] Michaelm (Talk | contribs) (Created page with "Lorem Ipsum")
- 14:20, 28 July 2021 PPB - Jul 28, 2021 (hist) [609 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Agenda == *...")
- 09:01, 28 July 2021 2021-07-28 (hist) [3,650 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 17:14, 27 July 2021 Bubble Chamber Meeting Tuesday August 3, 2021 (hist) [310 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday August 3 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
- 17:14, 27 July 2021 Bubble Chamber Meeting Tuesday July 27, 2021 (hist) [309 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday July 27 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...")
- 15:47, 27 July 2021 UE-21-001 Experimental Binder Documents (hist) [277 bytes] Michaelm (Talk | contribs) (Created page with " Conduct of Operations")
- 15:21, 27 July 2021 E-beam Irradiation Experiment (hist) [769 bytes] Michaelm (Talk | contribs) (Created page with "Lorem Ipsum")
- 13:10, 27 July 2021 Past Experiments (hist) [0 bytes] Michaelm (Talk | contribs) (Created page with "Lorem Ipsum")
- 15:30, 26 July 2021 HV insulator for 500 kV (hist) [989 bytes] Gabrielp (Talk | contribs) (Created page with "== HV insulator for 500 kV: == ** Exploring the use of the receptacle and the sizes of the SF6 spool Media:HV_insulator-1st_month.pptx")
- 12:24, 26 July 2021 PPB GPT -s Development (hist) [568 bytes] Mstefani (Talk | contribs) (Created page with "===General Particle Tracer Spin Tracking === Computing home page : https://cc.jlab.org Scientific Computing home page : https://scicomp.jlab.org/scicomp :ifarml01.jlab.org :...")
- 08:18, 21 July 2021 July 21, 2021 - Group Meeting (hist) [1,607 bytes] Grames (Talk | contribs) (Created page with ";Group business * Promised a couple months ago to sit with each of you, talk about status and next year...so, finally, I will start this... ;Around the table status updates *...")
- 11:44, 19 July 2021 2021-07-21 (hist) [5,630 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 11:43, 19 July 2021 2021-07-14 (hist) [564 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 11:21, 19 July 2021 2021-07-07 (hist) [2,904 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 09:34, 19 July 2021 Bubble Chamber Meeting Tuesday July 20, 2021 (hist) [309 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday July 20 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...")
- 13:39, 16 July 2021 HarmonicKicker-2021-07-16 (hist) [643 bytes] Bruker (Talk | contribs) (Created page with "== Proposal writing == * Joe says we should write a short internal document outlining what we would like to do. * Purpose (in the context of EIC, perhaps) * Possible prec...")
- 10:54, 14 July 2021 PPB - Jul 14, 2021 (hist) [710 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Agenda == *...")
- 09:48, 14 July 2021 July 14, 2021 - Group Meeting (hist) [1,339 bytes] Grames (Talk | contribs) (Created page with ";Group business * Thanks for taking all the new training....is it long?!? * Vacations - please let me know ;Around the table status updates * CEBAF ** Injector Restoration g...")
- 15:12, 13 July 2021 Gas and Ion Beam Effects in Linacs (hist) [1,192 bytes] Grames (Talk | contribs) (Created page with "==ATLIS Beam Tasks== * [https://opsweb.acc.jlab.org/CSUEApps/atlis/task/19804 Ion Clearing Beam Gap Test]")
- 10:09, 8 July 2021 Drawings (hist) [1,191 bytes] Chgarcia (Talk | contribs) (Created page with "* Media:Vacuum Chamber Dimensions.pdf [https://wiki.jlab.org/ciswiki/index.php/18%22_Photogun_ala_GTS Back to 18" Photogun page]")
- 10:02, 8 July 2021 Electrode (hist) [1,224 bytes] Chgarcia (Talk | contribs) (Created page with "* All of the electrode components are on hand and stored in the cabinet outside TL1337 clean room * Ball electrode shell, shed, from Pierce end, and back end (original, no hol...")
- 08:28, 8 July 2021 Anode (hist) [590 bytes] Chgarcia (Talk | contribs) (Created page with "* Ask Joe is the anode tube needs to be biased, or if it can be at ground potential * Discuss with Marcy and ME new anode tube design with significantly more open area for imp...")
- 14:44, 7 July 2021 PPB - Jul 7, 2021 (hist) [907 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Agenda == *...")
- 10:53, 7 July 2021 To do list in preparation for water irradiation and final booster characterizations studies (hist) [3,063 bytes] Poelker (Talk | contribs) (Created page with "media:to do list at UITF for water irradiation studies 7_7_21.docx Engineering support jobs keV region: *[DC] Reconnect two steering magnet sets and solenoid on the NEG...")
- 07:46, 7 July 2021 July 7, 2021 - Group Meeting (hist) [1,243 bytes] Suleiman (Talk | contribs) (Created page with ";Group business * Starting on Friday, virtual foreign conferences w/ fees requires DOE approval, takes 18 days, go through usual TA process * I submitted my request to hire an...")
- 11:48, 6 July 2021 Bubble Chamber Meeting Tuesday July 13, 2021 (hist) [309 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday July 13 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...")
- 11:48, 6 July 2021 Bubble Chamber Meeting Tuesday July 6, 2021 (hist) [308 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday July 6 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1-...")
- 15:43, 1 July 2021 Vacuum chamber (hist) [2,151 bytes] Chgarcia (Talk | contribs) (Created page with "* Remove WP-1250 NEG cartridges * Remove posts for woven metal screen and replace with something suitable for high vacuum * Add (tack weld?) fixtures to the vacuum chamber fo...")
- 15:33, 1 July 2021 Tasks (hist) [234 bytes] Chgarcia (Talk | contribs) (Created page with "* <span style="font-size:100%"> '''Vacuum chamber''' </span> * <span style="font-size:100%"> '''Anode''' </span> * <span style="font-size:100%"> '''Electrode'''...")
- 15:30, 1 July 2021 Electrostatic and beam dynamics simulations (hist) [795 bytes] Chgarcia (Talk | contribs) (Created page with "*Media:All of our photoguns 200 kV comparison CST and GPT.pptx")
- 15:24, 1 July 2021 Must, Should and Likes (hist) [647 bytes] Chgarcia (Talk | contribs) (Created page with "===Must=== * Achieve and sustain ~1E-12 Torr vacuum conditions *Operate reliably at 200 kV without field emission *Be tested with 200 keV beam in UITF ===Should=== *Compensat...")
- 14:57, 1 July 2021 Background and status as of July 1 2021 (hist) [2,948 bytes] Chgarcia (Talk | contribs) (Created page with "This photo-gun was intended for the UITF to operate at 200 kV. It is based on the GTS 18" diameter vacuum chamber, doped R30 insulator and spherical electrode. The vacuum cham...")
- 14:55, 1 July 2021 18" Photogun ala GTS (hist) [1,045 bytes] Chgarcia (Talk | contribs) (Created page with "This photo-gun was intended for the UITF to operate at 200 kV. It is based on the GTS 18" diameter vacuum chamber, doped R30 insulator and spherical electrode. The vacuum cham...")
- 20:42, 29 June 2021 June 29, 2021 - Group Meeting (hist) [1,943 bytes] Grames (Talk | contribs) (Created page with ";Group business * Starting on Friday, virtual foreign conferences w/ fees requires DOE approval, takes 18 days * I submitted a request for a SE1/2, now begins the long process...")
- 18:05, 29 June 2021 PPB - Jun 30, 2021 (hist) [303 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Agenda == *...")
- 09:55, 23 June 2021 PPB - Jun 23, 2021 (hist) [478 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/405130883/4307 Code to start the meeting 4307 ==Agenda == *...")
- 20:35, 22 June 2021 2021-06-23 (hist) [3,246 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 16:23, 22 June 2021 June 22, 2021 - Group Meeting (hist) [1,548 bytes] Grames (Talk | contribs) (Created page with "; Group business ;Go around the room for status updates ;Status updates by area... * CEBAF * UITF * GTS ;Paper writing updates... * Joe - Biased anode study * Riad - GTS ma...")
- 11:37, 22 June 2021 Bubble Chamber Meeting Tuesday June 29, 2021 (hist) [309 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday June 29 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...")
- 22:32, 21 June 2021 Tunnel Photos of Phase I Upgrade (hist) [360 bytes] Moser (Talk | contribs) (Created page with "Photographs taken 6/21/21. [File:6.21.21 Gun.jpg | 1000px]")
- 14:14, 21 June 2021 Poelker mccaughan UITF plans for rest of 2021 (hist) [2,656 bytes] Poelker (Talk | contribs) (Created page with "Mike McC. and I have been operating under the assumption that UITF is supposed to provide beam for the water irradiation experiment this calendar year and in parallel, we cont...")
- 12:43, 21 June 2021 Fall Schedule Discussion (hist) [820 bytes] Michaelm (Talk | contribs) (Created page with "We need this information to present to Andrei as our plan for the remainder of FY21 and ask for his guidance going forward. <u>FY21 Schedule Discussion:</u> <ul> <li>Wastewat...")
- 13:22, 18 June 2021 HarmonicKicker-2021-06-18 (hist) [4,961 bytes] Bruker (Talk | contribs) (initial)
- 14:57, 17 June 2021 Posters & Proceedings (hist) [1,015 bytes] Michaelm (Talk | contribs) (Created page with "<ol> <li> X. Li,F. Hannon, H. Baumgart,G. Ciovati,S. Wang; Design of a 10 MeV beamline at the Upgraded Injector Test Facility for e-beam irradiation, JLAB-ACC-21-3373, DOE/OR/...")
- 22:52, 15 June 2021 2021-06-16 (hist) [2,789 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 11:53, 15 June 2021 Bubble Chamber Meeting Tuesday June 22, 2021 (hist) [309 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday June 22 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...")
- 11:29, 15 June 2021 June 15, 2021 - Group Meeting (hist) [649 bytes] Grames (Talk | contribs) (Created page with "; Group business ;By area * CEBAF * UITF * GTS ;Paper writing status * Joe - Biased anode study * Riad - GTS magnetized beam paper due * Shukui - Green fiber laser ;Upcomin...")
- 11:00, 11 June 2021 Viewers (hist) [803 bytes] Marcy (Talk | contribs) (Created page with "Dimensions: Media:Viewer-dimensions.docx")
- 10:58, 11 June 2021 Mechanical Area (hist) [11 bytes] Marcy (Talk | contribs) (Created page with "Viewers")
- 08:00, 9 June 2021 June 9, 2021 - Group Meeting (hist) [1,865 bytes] Grames (Talk | contribs) (Created page with " ; Group business * new hires * MEDCON4 * re-"grouping" ; CEBAF * Restoration begins July 16 (~5 weeks) * Commissioning - I don't see how it all fits, restoring CEBAF for the...")
- 11:43, 8 June 2021 Bubble Chamber Meeting Tuesday June 15, 2021 (hist) [309 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday June 15 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...")
- 17:38, 6 June 2021 6/4/21 - Planning meeting (hist) [692 bytes] Grames (Talk | contribs) (Created page with "Summary of conference call... #Eric will work with Dave to seek a JLab solution for fabricating the 125um thin graphite "wedges" #Marcy will work with Danny to select and fin...")
- 14:34, 4 June 2021 Phase2 ME meeting minutes 6 3 2021 (hist) [2,309 bytes] Poelker (Talk | contribs) (Created page with "let's replace WP1250s inside the rectangular dif pump can with UHV1400 ZAO modules. Gary will model the dif pump can with these modules. Maybe we can use the existing vacuum...")
- 07:50, 2 June 2021 PPB - Jun 02, 2021 (hist) [314 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda == * Round...")
- 13:31, 1 June 2021 2021-06-09 (hist) [3,403 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 12:43, 1 June 2021 Bubble Chamber Meeting Tuesday June 8, 2021 (hist) [308 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday June 8 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1-...")
- 15:09, 26 May 2021 Phase 1 Commissioning ATLIS tasks (hist) [4,258 bytes] Grames (Talk | contribs) (Created page with "*ATLis Testplans (click Expand button =>) <div class="mw-collapsible mw-collapsed"> ;General / Catch-All Test Plans * [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22...")
- 15:08, 26 May 2021 Phase 1 Commissioning Schedule (hist) [56,865 bytes] Grames (Talk | contribs) (Created page with "*Beam Commissioning Schedule (click Expand button =>) <div class="mw-collapsible mw-collapsed"> ==== Week 0, May 17th-23rd ==== <div class="mw-collapsible mw-collapsed"> {|...")
- 09:07, 26 May 2021 PPB - May 26, 2021 (hist) [493 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda == * Round...")
- 11:29, 25 May 2021 Bubble Chamber Meeting Tuesday June 1, 2021 (hist) [308 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday June 1 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1-...")
- 01:31, 21 May 2021 Electrostatic design and beam dynamics simulations (hist) [109 bytes] Sajini (Talk | contribs) (Created page with " *Re-design of the GTS gun back electrode with holes : media:Making holes in the electrode back end.pptx")
- 09:44, 20 May 2021 2021-05-26 (hist) [4,515 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 15:14, 18 May 2021 Bubble Chamber Meeting Tuesday May 25, 2021 (hist) [308 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday May 25 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1-...")
- 10:45, 18 May 2021 2021-05-19 (hist) [3,406 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 08:27, 18 May 2021 CIS Self Education (hist) [254 bytes] Grames (Talk | contribs) (Created page with " == Resources == * Previous CERN Accelerator Schools https://cas.web.cern.ch/previous-schools == Vacuum == * M. Seidl, Accelerator Vacuum, Proceedings of the CERN-Accelerat...")
- 12:45, 17 May 2021 PPB - May 19, 2021 (hist) [781 bytes] Mstefani (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda == * Round...")
- 15:24, 14 May 2021 Shift Taker Information (hist) [2,647 bytes] Michaelm (Talk | contribs) (Created page with "<!-- Table #3 --> Lorem ipsum <center> <br> <table cellpadding="3"><tr> <!-- Column headings --> <td width=160 bgcolor="#e0e0f0"><center>'''Shift Prep'''</center></td> <td wid...")
- 09:39, 14 May 2021 Robust Meeting - May 14, 2021 (hist) [338 bytes] Suleiman (Talk | contribs) (Created page with " * Mott DAQ: media:IMG_7441.JPEG")
- 07:59, 13 May 2021 Silicone dielectric compound (hist) [628 bytes] Chgarcia (Talk | contribs) (Created page with "*Media:Silicone dielectric compound.jpg *Media:MSDS_G661_SiliconeGrease-2016.pdf")
- 12:50, 11 May 2021 2021-05-12 (hist) [2,991 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 11:46, 11 May 2021 Bubble Chamber Meeting Tuesday May 18, 2021 (hist) [308 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday May 18 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1-...")
- 20:45, 6 May 2021 Phase 1 Commissioning, ALL Weeks (hist) [26,013 bytes] Moser (Talk | contribs) (Created page with "== AIPINJ Phase I Beam Commissioning Schedule == Last updated 5/6. === Week 1, May 10th-16th === {| class="wikitable" style="text-align:center; vertical-align:middle; back...")
- 20:59, 4 May 2021 Phase 1 System Readiness (hist) [7,429 bytes] Moser (Talk | contribs) (Created page with "==CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30) == * 4/19/21 - Updated punchlist media:210419_CIS_HCO.docx * 4/06/21 - Updated punchlist media:210406_CIS_HC...")
- 20:26, 4 May 2021 Phase 1 & SAD ATLIS Tasks (hist) [8,152 bytes] Grames (Talk | contribs) (Created page with "'''Open, complete, re-scheduled statuses updated 3/15/21''' ;AIPINJ * '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22270 5D cold cathode gauge repositioning] *...")
- 20:24, 4 May 2021 Phase 1 Beamline Components (hist) [2,046 bytes] Grames (Talk | contribs) (Created page with ": '''Gun & Vacuum''' ::200 kV gun - Cathode, anode and high voltage system ::Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter an...")
- 16:25, 4 May 2021 2021-05-04 (hist) [3,612 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 13:55, 4 May 2021 Airline Valve Changeout (hist) [264 bytes] Moser (Talk | contribs) (Created page with "Brass valve shown, yellow tape to highlight, is leaking. This is near Chopper 1. 500px Zoomed out to show region where valve is. File:Airline2.jpg...")
- 11:39, 4 May 2021 Bubble Chamber Meeting Tuesday May 11, 2021 (hist) [308 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday May 11 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1-...")
- 11:39, 4 May 2021 Bubble Chamber Meeting Tuesday May 4, 2021 (hist) [307 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday May 4 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1-8...")
- 19:12, 3 May 2021 Robust Meeting - April 2, 2021 (hist) [57 bytes] Grames (Talk | contribs) (Created page with " * Jlab update slides media:310402_RobustMeeting.pptx")
- 12:54, 29 April 2021 Phase2 ME meeting minutes 4 29 2021 (hist) [868 bytes] Poelker (Talk | contribs) (Created page with "Present" Alicia, Reza and Yan, Marcy and Joe, Gary, Shaun and Danny, and Lakshmi Here are the interesting things discussed today: #) Joe will see how the MFA and MFX magnets...")
- 08:12, 28 April 2021 2021-04-28 (hist) [3,613 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 11:48, 27 April 2021 Bubble Chamber Meeting Tuesday May 5, 2021 (hist) [307 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday May 5 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1-8...")
- 12:13, 22 April 2021 Phase2 ME meeting minutes 4 22 2021 (hist) [2,273 bytes] Poelker (Talk | contribs) (Created page with "phase2 ME design meeting minutes 4_22_2021 SHaun, Gary, Matt and Danny Gary made great progress on the phase2 layout, addressing most of the issues discussed last meeting. S...")
- 16:13, 20 April 2021 PPB - Apr 21, 2021 (hist) [533 bytes] Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda == * C. Mu...")
- 12:09, 20 April 2021 Bubble Chamber Meeting Tuesday April 27, 2021 (hist) [310 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday April 27 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
- 14:23, 19 April 2021 2021-04-21 (hist) [2,169 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 14:01, 16 April 2021 Theses (hist) [1,645 bytes] Chgarcia (Talk | contribs) (Created page with "* [https://drive.google.com/file/d/1FpWgPuf9JgBxLSfFNQE8-ZHq7Sncs88N/view Gabriel Palacios-Serrano PhD Dissertation defense]")
- 11:38, 14 April 2021 Phase2 ME meeting minutes 4 14 2021 (hist) [2,453 bytes] Poelker (Talk | contribs) (Created page with "phase2 ME design meeting minutes 4_14_2021 Danny, Shaun, Gary, Grames, Marcy, Poelker, Reza, Alicia Gary presented a "vacuum tight" layout, nice Comments: # wider girder,...")
- 08:11, 14 April 2021 2021-04-14 (hist) [1,977 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 11:41, 13 April 2021 Bubble Chamber Meeting Tuesday April 20, 2021 (hist) [310 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday April 20 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
- 08:29, 13 April 2021 PPB - Apr 14, 2021 (hist) [1,039 bytes] Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda == * Intro...")
- 09:08, 12 April 2021 GTS meeting 4 12 21 (hist) [1,041 bytes] Suleiman (Talk | contribs) (Created page with "* Upgrade Glassman Gun PSS interlock chassis (Scott) * Add vacuum interlock to HV supply (Scott) Plan B: Install Spellman 225 kV power supply. Did not work because we could n...")
- 10:09, 9 April 2021 Phase2 ME meeting minutes 4 8 2021 (hist) [2,127 bytes] Poelker (Talk | contribs) (Created page with "ME Design meeting , phase2, 4/8/2021 Shaun, Matt, Gary and Danny Comments and topics from meeting, some action items: #) Joe, will we be using the “green” solenoids desi...")
- 07:48, 7 April 2021 2021-04-07 (hist) [1,810 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 10:36, 6 April 2021 Bubble Chamber Meeting Tuesday April 13, 2021 (hist) [310 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday April 13 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
- 15:53, 5 April 2021 Spring 2021 - Rebuilding Photogun (hist) [4,279 bytes] Grames (Talk | contribs) (Created page with "===Re-align gun before venting=== :: Sent request to Gould ===HV work (venting)=== * Fiducialize Nb cathode * align cathode (to anode) * align LM to cathode * fiducialize HV...")
- 12:35, 5 April 2021 CIS @ UITF (hist) [140 bytes] Grames (Talk | contribs) (Created page with "Spring 2021 - Rebuilding Photogun 1. Re-align gun before venting? 2. Vent gun, fiducialize anode 3. Fiducialize Nb cathode, align cathode (to anode), LM to cathode, fiducia...")
- 11:05, 31 March 2021 Glassman High Voltage Power Supplies (hist) [2,060 bytes] Chgarcia (Talk | contribs) (Created page with "==CEBAF 450 kV 3.0 mA== File:CEBAF HVPS is 450 kV and 3 mA.png ==UITF 350 kV 3.5 mA== File:UITF HVPS is 350 kV and 3p5 mA.png ==LERF 600 kV 10 mA== ==GTS 600 kV 5 mA==")
- 22:18, 30 March 2021 2021-03-31 (hist) [1,651 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 10:53, 30 March 2021 Bubble Chamber Meeting Tuesday April 6, 2021 (hist) [309 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday April 6 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...")
- 09:44, 29 March 2021 FG spin solenoids (hist) [256 bytes] Grames (Talk | contribs) (Created page with "Any updates for FG spin solenoids...")
- 09:33, 29 March 2021 GTS meeting 3 29 21 (hist) [1,025 bytes] Suleiman (Talk | contribs) (Created page with "* Upgrade Glassman Gun PSS interlock chassis (Scott) * Add vacuum interlock to HV supply (Scott) Plan B: Install Spellman 225 kV power supply * Beamline - no bake of beamli...")
- 03:23, 25 March 2021 PPB - Mar 31, 2021 (hist) [833 bytes] Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''Mexico 8am''', JLab 11am, France 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda Mar 31,...")
- 11:50, 23 March 2021 Bubble Chamber Meeting Tuesday March 30, 2021 (hist) [398 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday March 30 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
- 10:50, 23 March 2021 Bubble Chamber Meeting Tuesday March 23, 2021 (hist) [310 bytes] Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday March 23 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
- 21:02, 22 March 2021 PPB - Mar 24, 2021 (hist) [796 bytes] Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed (Mexico 9am, '''US Noon''', France 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda Mar 24, 2...")
- 10:43, 22 March 2021 2021-03-24 (hist) [1,828 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 15:03, 19 March 2021 3/19/21 - Bi-weekly meeting (hist) [1,446 bytes] Grames (Talk | contribs) (Created page with "; To-Do list from 2/12/21 * Joe - distance flange to beam center CEBAF vs UITF ** Done * Joe - copper ladder drawings if available, cooling spec, what would have to change t...")
- 10:27, 18 March 2021 GTS meeting 3 19 21 (hist) [877 bytes] Suleiman (Talk | contribs) (Created page with "* Upgrade Glassman Gun PSS interlock chassis (Carlos) * Add vacuum interlock to HV supply (Scott) * Beamline - no bake of beamline: (Mamun and Bubba) ** Replace YAG screens...")
- 13:23, 17 March 2021 Phase 2 discussion with all vested parties starting the conversation 3 17 21 (hist) [3,699 bytes] Poelker (Talk | contribs) (Created page with "3 month SAD January 2022_proposed timeframe for this work *Mech Design: layout, parts fab *Survey and Alignment: another girder, plus all the stuff we remove has to go back i...")
- 18:50, 16 March 2021 PPB - Mar 17, 2021 (hist) [1,036 bytes] Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed (Mexico 9am, '''US Noon''', France 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda Mar 17, 2...")
- 14:22, 16 March 2021 2021-03-17 (hist) [2,456 bytes] Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
- 13:55, 12 March 2021 Getter Pump Information (hist) [403 bytes] Marcy (Talk | contribs) (Created page with "'''Getter Pump Manuals and Activation Protocols''' WP950 Modules ST 707 Capacitorr Z3500Media:Capacitorr Pump Z 3500 Capacitorr HV200 CapaciTorr CF35 CapaciTorr GP500...")
- 16:46, 11 March 2021 To do list for booster characterization and preparing for water irradiation experiment (hist) [2,151 bytes] Poelker (Talk | contribs) (Created page with "Update on HDIce plans, run4: *beam through Saturday March 13, *Monday March 15 rooftiles off *Tuesday March 16, rooftiles back ON, credited controls recertified, permission...")