Recent changes

Jump to: navigation, search

Track the most recent changes to the wiki on this page.

Recent changes options
Legend:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Show minor edits | Hide bots | Hide anonymous users | Hide registered users | Hide my edits

Show new changes starting from 10:26, 10 April 2021
   

9 April 2021

     14:42  CIS Phase 1 work plans‎‎ (7 changes | history) . . (-4,180). . [Moser‎ (7×)]
     14:42 (cur | prev) . . (+13). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     14:42 (cur | prev) . . (+54). . Moser (Talk | contribs)
     14:38 (cur | prev) . . (+27). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     14:28 (cur | prev) . . (+18). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     14:20 (cur | prev) . . (+47). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     13:47 (cur | prev) . . (-4,630). . Moser (Talk | contribs)
     10:00 (cur | prev) . . (+291). . Moser (Talk | contribs) (Penetration Work)
     14:41 (Upload log) . . Moser (Talk | contribs) uploaded File:InjSB Racks no pene.png
     14:38  Phase 1 - HCO & Commissioning‎‎ (4 changes | history) . . (+161). . [Moser‎ (4×)]
     14:38 (cur | prev) . . (+27). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     14:37 (cur | prev) . . (-17). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     14:36 (cur | prev) . . (+110). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     14:36 (cur | prev) . . (+41). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
N    10:09  Phase2 ME meeting minutes 4 8 2021‎ (diff | hist) . . (+2,127). . Poelker (Talk | contribs) (Created page with "ME Design meeting , phase2, 4/8/2021 Shaun, Matt, Gary and Danny Comments and topics from meeting, some action items: #) Joe, will we be using the “green” solenoids desi...")
     10:08  AIPINJ - Phase 2 Upgrade Meetings‎ (diff | hist) . . (+42). . Poelker (Talk | contribs)

8 April 2021

     17:31  CIS Phase 1 work plans‎‎ (3 changes | history) . . (+61). . [Moser‎ (3×)]
     17:31 (cur | prev) . . (+25). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     17:05 (cur | prev) . . (-8). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     07:49 (cur | prev) . . (+44). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     13:39  UITF Operations‎‎ (21 changes | history) . . (+1,950). . [Michaelm‎ (21×)]
     13:39 (cur | prev) . . (+39). . Michaelm (Talk | contribs)
     13:35 (cur | prev) . . (+48). . Michaelm (Talk | contribs)
     13:34 (cur | prev) . . (0). . Michaelm (Talk | contribs)
     13:33 (cur | prev) . . (+25). . Michaelm (Talk | contribs)
     13:29 (cur | prev) . . (+51). . Michaelm (Talk | contribs)
     13:28 (cur | prev) . . (+9). . Michaelm (Talk | contribs)
     13:19 (cur | prev) . . (+96). . Michaelm (Talk | contribs)
     13:18 (cur | prev) . . (0). . Michaelm (Talk | contribs)
     13:18 (cur | prev) . . (-6). . Michaelm (Talk | contribs)
     13:18 (cur | prev) . . (-2). . Michaelm (Talk | contribs)
     13:17 (cur | prev) . . (+18). . Michaelm (Talk | contribs)
     13:16 (cur | prev) . . (-194). . Michaelm (Talk | contribs)
     12:44 (cur | prev) . . (+8). . Michaelm (Talk | contribs)
     12:44 (cur | prev) . . (-818). . Michaelm (Talk | contribs)
     11:25 (cur | prev) . . (+1,291). . Michaelm (Talk | contribs)
     11:23 (cur | prev) . . (-10). . Michaelm (Talk | contribs)
     11:22 (cur | prev) . . (0). . Michaelm (Talk | contribs)
     11:21 (cur | prev) . . (+894). . Michaelm (Talk | contribs)
     11:07 (cur | prev) . . (+11). . Michaelm (Talk | contribs)
     11:06 (cur | prev) . . (+17). . Michaelm (Talk | contribs)
     11:06 (cur | prev) . . (+473). . Michaelm (Talk | contribs)
     11:02  Spring 2021 - Rebuilding Photogun‎‎ (3 changes | history) . . (+337). . [Grames‎ (3×)]
     11:02 (cur | prev) . . (+83). . Grames (Talk | contribs)
     10:32 (cur | prev) . . (+233). . Grames (Talk | contribs)
     10:26 (cur | prev) . . (+21). . Grames (Talk | contribs)
     10:37 (Upload log) . . Grames (Talk | contribs) uploaded File:310402 RobustMeeting.pptx
     10:37  Robust Meetings‎ (diff | hist) . . (+75). . Grames (Talk | contribs)
     09:37  GTS meeting 3 29 21‎ (diff | hist) . . (+101). . Suleiman (Talk | contribs)
     09:35  GTS meeting 3 19 21‎ (diff | hist) . . (-45). . Suleiman (Talk | contribs)

7 April 2021

     20:31  Phase 1 - HCO & Commissioning‎‎ (15 changes | history) . . (+1,559). . [Grames‎ (3×); Moser‎ (12×)]
     20:31 (cur | prev) . . (+41). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     20:30 (cur | prev) . . (-207). . Moser (Talk | contribs)
     14:33 (cur | prev) . . (+138). . Grames (Talk | contribs)
     14:32 (cur | prev) . . (+137). . Grames (Talk | contribs)
     14:08 (cur | prev) . . (-1). . Moser (Talk | contribs) (Activities)
     13:54 (cur | prev) . . (+1). . Moser (Talk | contribs) (Activities)
     13:52 (cur | prev) . . (-1). . Moser (Talk | contribs) (Activities)
     13:52 (cur | prev) . . (-67). . Moser (Talk | contribs) (Activities)
     13:50 (cur | prev) . . (+2). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     11:51 (cur | prev) . . (+47). . Moser (Talk | contribs) (ATLis Testplans)
     11:49 (cur | prev) . . (+1,058). . Moser (Talk | contribs) (ATLis Testplans)
     10:12 (cur | prev) . . (-2). . Grames (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     09:34 (cur | prev) . . (+435). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     09:25 (cur | prev) . . (-13). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     09:25 (cur | prev) . . (-9). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     20:30 (Upload log). . [Chgarcia‎; Grames‎; Moser‎ (5×)]
     20:30 . . Moser (Talk | contribs) uploaded File:210407 Phase1 Commissioning.docx
     15:24 . . Chgarcia (Talk | contribs) uploaded File:Vertical Wien GPT sims with spline electrodes Surveyed.pptx
     14:14 . . Grames (Talk | contribs) uploaded File:210407 DiamondLadder.pptx
     13:51 . . Moser (Talk | contribs) uploaded File:Beam commissioning by type.png
     09:34 . . Moser (Talk | contribs) uploaded File:3.31.21 BeamCommissioningPlanLayout AIPINJ-1 firstpass.ods
     09:30 . . Moser (Talk | contribs) uploaded File:BeamINJphase1v5.pptx
     09:27 . . Moser (Talk | contribs) uploaded File:210401 Phase1 Commissioning.docx
     18:06  Phase 1‎ (diff | hist) . . (+101). . Moser (Talk | contribs) (ATLIS Tasks)
     17:05  CIS Phase 1 work plans‎‎ (5 changes | history) . . (+107). . [Moser‎ (5×)]
     17:05 (cur | prev) . . (-34). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     09:21 (cur | prev) . . (+204). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     09:19 (cur | prev) . . (+18). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     09:17 (cur | prev) . . (-62). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     09:15 (cur | prev) . . (-19). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     15:30  WF Wien Filters (200 kV upgrade)‎‎ (2 changes | history) . . (+181). . [Chgarcia‎ (2×)]
     15:30 (cur | prev) . . (+53). . Chgarcia (Talk | contribs)
     15:29 (cur | prev) . . (+128). . Chgarcia (Talk | contribs)
     15:23  Gabriel Palacios-Serrano‎‎ (2 changes | history) . . (+594). . [Chgarcia‎ (2×)]
     15:23 (cur | prev) . . (+481). . Chgarcia (Talk | contribs)
     08:03 (cur | prev) . . (+113). . Chgarcia (Talk | contribs)
     14:14  Diamond Target Meetings‎‎ (2 changes | history) . . (+111). . [Grames‎ (2×)]
     14:14 (cur | prev) . . (-1). . Grames (Talk | contribs)
     14:14 (cur | prev) . . (+112). . Grames (Talk | contribs)
N    08:25  2021-04-07‎‎ (5 changes | history) . . (+1,810). . [Michaelm‎ (5×)]
     08:25 (cur | prev) . . (+15). . Michaelm (Talk | contribs) (Reports on Open Action Items:)
     07:55 (cur | prev) . . (+65). . Michaelm (Talk | contribs) (New items for discussion:)
     07:55 (cur | prev) . . (+120). . Michaelm (Talk | contribs) (New items for discussion:)
     07:51 (cur | prev) . . (+233). . Michaelm (Talk | contribs) (New items for discussion:)
N    07:48 (cur | prev) . . (+1,377). . Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
     07:58  CIS Student Presentations‎ (diff | hist) . . (+136). . Chgarcia (Talk | contribs)
     07:45  Meeting minutes‎ (diff | hist) . . (+24). . Michaelm (Talk | contribs) (Experimental Meetings)

6 April 2021

     18:02  CIS Phase 1 work plans‎‎ (8 changes | history) . . (-1,573). . [Moser‎ (8×)]
     18:02 (cur | prev) . . (+4). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     17:46 (cur | prev) . . (-1,921). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     16:35 (cur | prev) . . (-63). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     16:22 (cur | prev) . . (+96). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     16:19 (cur | prev) . . (+122). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     15:48 (cur | prev) . . (-37). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     08:50 (cur | prev) . . (+213). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     08:11 (cur | prev) . . (+13). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     17:46  Phase 1 - HCO & Commissioning‎‎ (8 changes | history) . . (+62). . [Grames‎; Moser‎ (7×)]
     17:46 (cur | prev) . . (-10). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:58 (cur | prev) . . (+26). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:53 (cur | prev) . . (-14). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:52 (cur | prev) . . (+20). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:46 (cur | prev) . . (+18). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:44 (cur | prev) . . (0). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:44 (cur | prev) . . (-37). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     11:18 (cur | prev) . . (+59). . Grames (Talk | contribs)
     16:06  Spring 2021 - Rebuilding Photogun‎‎ (19 changes | history) . . (+1,216). . [Grames‎ (19×)]
     16:06 (cur | prev) . . (-71). . Grames (Talk | contribs)
     16:06 (cur | prev) . . (+88). . Grames (Talk | contribs)
     10:42 (cur | prev) . . (-11). . Grames (Talk | contribs)
     10:41 (cur | prev) . . (-1). . Grames (Talk | contribs)
     10:41 (cur | prev) . . (-2). . Grames (Talk | contribs)
     10:40 (cur | prev) . . (+2). . Grames (Talk | contribs)
     10:40 (cur | prev) . . (+89). . Grames (Talk | contribs)
     10:38 (cur | prev) . . (+36). . Grames (Talk | contribs)
     10:37 (cur | prev) . . (+72). . Grames (Talk | contribs)
     10:35 (cur | prev) . . (+56). . Grames (Talk | contribs)
     10:32 (cur | prev) . . (+4). . Grames (Talk | contribs)
     10:32 (cur | prev) . . (0). . Grames (Talk | contribs)
     10:31 (cur | prev) . . (+619). . Grames (Talk | contribs)
     09:41 (cur | prev) . . (+3). . Grames (Talk | contribs)
     09:40 (cur | prev) . . (+37). . Grames (Talk | contribs)
     09:40 (cur | prev) . . (+175). . Grames (Talk | contribs)
     08:52 (cur | prev) . . (0). . Grames (Talk | contribs)
     08:50 (cur | prev) . . (+67). . Grames (Talk | contribs)
     08:48 (cur | prev) . . (+53). . Grames (Talk | contribs)
     15:26 (Upload log). . [Chgarcia‎ (3×); Grames‎ (3×)]
     15:26 . . Chgarcia (Talk | contribs) uploaded File:Vertical & Horizontal Wien assembly procedure Rev01 April 6 2021.docx
     15:02 . . Chgarcia (Talk | contribs) uploaded File:H-Wien S&A 020921.xlsx
     15:02 . . Chgarcia (Talk | contribs) uploaded File:H-Wien S&A 02-12-2021.xlsx
     11:18 . . Grames (Talk | contribs) uploaded File:210406 CIS HCO.docx
     08:52 . . Grames (Talk | contribs) uploaded File:MoPuckMount.docx
     08:51 . . Grames (Talk | contribs) uploaded File:JL0047248 PUCK BODY REV A.pdf
     15:26  WF Wien Filters (200 kV upgrade)‎ (diff | hist) . . (+26). . Chgarcia (Talk | contribs) (200 keV Wien Assembly)
     15:01  AIPINJ - S&A Transmittals‎ (diff | hist) . . (+209). . Chgarcia (Talk | contribs)
     14:33  CIS Refereed Publications‎‎ (2 changes | history) . . (+178). . [Poelker‎ (2×)]
     14:33 (cur | prev) . . (+15). . Poelker (Talk | contribs)
     11:00 (cur | prev) . . (+163). . Poelker (Talk | contribs)
     11:25  UITC Operations‎ (diff | hist) . . (+22). . Grames (Talk | contribs)
     11:24  UITC technical areas‎ (diff | hist) . . (-16). . Grames (Talk | contribs)
N    10:36  Bubble Chamber Meeting Tuesday April 13, 2021‎ (diff | hist) . . (+310). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday April 13 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
     10:36  Planning Meetings‎ (diff | hist) . . (+59). . Suleiman (Talk | contribs)

5 April 2021

     20:12  CIS Phase 1 work plans‎‎ (11 changes | history) . . (+775). . [Moser‎ (11×)]
     20:12 (cur | prev) . . (+8). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     15:37 (cur | prev) . . (+25). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     10:13 (cur | prev) . . (-27). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     10:12 (cur | prev) . . (+26). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     10:10 (cur | prev) . . (+65). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     10:08 (cur | prev) . . (+339). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     09:54 (cur | prev) . . (-1). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     09:52 (cur | prev) . . (+174). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     08:24 (cur | prev) . . (+64). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     08:13 (cur | prev) . . (+1). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     08:12 (cur | prev) . . (+101). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
N    15:59  Spring 2021 - Rebuilding Photogun‎‎ (3 changes | history) . . (+898). . [Grames‎ (3×)]
     15:59 (cur | prev) . . (+273). . Grames (Talk | contribs)
     15:55 (cur | prev) . . (+20). . Grames (Talk | contribs)
N    15:53 (cur | prev) . . (+605). . Grames (Talk | contribs) (Created page with "===Re-align gun before venting=== :: Sent request to Gould ===HV work (venting)=== * Fiducialize Nb cathode * align cathode (to anode) * align LM to cathode * fiducialize HV...")
N    15:48  CIS @ UITF‎‎ (4 changes | history) . . (+37). . [Grames‎ (4×)]
     15:48 (cur | prev) . . (-552). . Grames (Talk | contribs) (Replaced content with "Spring 2021 - Rebuilding Photogun")
     13:06 (cur | prev) . . (+40). . Grames (Talk | contribs)
     12:36 (cur | prev) . . (+43). . Grames (Talk | contribs)
N    12:35 (cur | prev) . . (+506). . Grames (Talk | contribs) (Created page with "Spring 2021 - Rebuilding Photogun 1. Re-align gun before venting? 2. Vent gun, fiducialize anode 3. Fiducialize Nb cathode, align cathode (to anode), LM to cathode, fiducia...")
     12:36 (Upload log). . [Grames‎; Chgarcia‎ (2×)]
     12:36 . . Grames (Talk | contribs) uploaded File:ACC2003000-0219 schneedle.pdf
     11:42 . . Chgarcia (Talk | contribs) uploaded File:Gabriel Palacios Wien filter Abstract IPAC21 FINAL.docx
     11:39 . . Chgarcia (Talk | contribs) uploaded File:Hernandez-Garcia JLab LCWS 500 kV insulators.pptx
     12:25  UITC technical areas‎ (diff | hist) . . (+16). . Grames (Talk | contribs)
     11:41  CIS Conference and Workshop Proceedings‎‎ (7 changes | history) . . (+457). . [Chgarcia‎ (2×); Grames‎ (5×)]
     11:41 (cur | prev) . . (+112). . Chgarcia (Talk | contribs)
     11:39 (cur | prev) . . (+18). . Chgarcia (Talk | contribs) (2021)
     11:37 (cur | prev) . . (+185). . Grames (Talk | contribs)
     10:28 (cur | prev) . . (+2). . Grames (Talk | contribs)
     10:28 (cur | prev) . . (+47). . Grames (Talk | contribs)
     10:27 (cur | prev) . . (-36). . Grames (Talk | contribs)
     10:26 (cur | prev) . . (+129). . Grames (Talk | contribs)

2 April 2021

     18:15  CIS Phase 1 work plans‎‎ (9 changes | history) . . (+447). . [Moser‎ (9×)]
     18:15 (cur | prev) . . (+6). . Moser (Talk | contribs) (Penetration Work)
     18:15 (cur | prev) . . (0). . Moser (Talk | contribs) (Penetration Work)
     18:14 (cur | prev) . . (+216). . Moser (Talk | contribs) (Penetration Work)
     18:12 (cur | prev) . . (+2). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     18:11 (cur | prev) . . (+84). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     18:11 (cur | prev) . . (-2). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     18:10 (cur | prev) . . (-2). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     17:56 (cur | prev) . . (+93). . Moser (Talk | contribs)
     08:20 (cur | prev) . . (+50). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     12:33  Phase 1 - HCO & Commissioning‎‎ (2 changes | history) . . (+41). . [Moser‎ (2×)]
     12:33 (cur | prev) . . (+1). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     12:32 (cur | prev) . . (+40). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     12:32 (Upload log) . . Moser (Talk | contribs) uploaded File:BeamDrivers Pt2 3.16.21.pdf

1 April 2021

     09:01  CIS Phase 1 work plans‎‎ (3 changes | history) . . (+108). . [Moser‎ (3×)]
     09:01 (cur | prev) . . (+78). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     08:57 (cur | prev) . . (+85). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     08:27 (cur | prev) . . (-55). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))

31 March 2021

     22:14  CIS Phase 1 work plans‎‎ (3 changes | history) . . (+157). . [Moser‎ (3×)]
     22:14 (cur | prev) . . (+96). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     08:12 (cur | prev) . . (+6). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     08:11 (cur | prev) . . (+55). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
N    11:16  Glassman High Voltage Power Supplies‎‎ (6 changes | history) . . (+319). . [Chgarcia‎ (6×)]
     11:16 (cur | prev) . . (+132). . Chgarcia (Talk | contribs)
     11:11 (cur | prev) . . (0). . Chgarcia (Talk | contribs)
     11:10 (cur | prev) . . (+9). . Chgarcia (Talk | contribs)
     11:08 (cur | prev) . . (-2). . Chgarcia (Talk | contribs)
     11:06 (cur | prev) . . (+2). . Chgarcia (Talk | contribs)
N    11:05 (cur | prev) . . (+178). . Chgarcia (Talk | contribs) (Created page with "==CEBAF 450 kV 3.0 mA== File:CEBAF HVPS is 450 kV and 3 mA.png ==UITF 350 kV 3.5 mA== File:UITF HVPS is 350 kV and 3p5 mA.png ==LERF 600 kV 10 mA== ==GTS 600 kV 5 mA==")
     11:10 (Upload log). . [Grames‎; Chgarcia‎ (3×)]
     11:10 . . Chgarcia (Talk | contribs) uploaded File:For wiki UITF HVPS is 350 kV and 3p5 mA.png
     11:07 . . Chgarcia (Talk | contribs) uploaded File:UITF HVPS is 350 kV and 3p5 mA.png
     11:05 . . Chgarcia (Talk | contribs) uploaded File:CEBAF HVPS is 450 kV and 3 mA.png
     10:56 . . Grames (Talk | contribs) uploaded File:2103331.pptx
     11:02  High Voltage‎‎ (2 changes | history) . . (+42). . [Chgarcia‎ (2×)]
     11:02 (cur | prev) . . (-1). . Chgarcia (Talk | contribs)
     11:02 (cur | prev) . . (+43). . Chgarcia (Talk | contribs)
     10:55  PPB - Mar 31, 2021‎ (diff | hist) . . (+96). . Grames (Talk | contribs)

30 March 2021

N    22:18  2021-03-31‎ (diff | hist) . . (+1,651). . Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
     21:47  Meeting minutes‎ (diff | hist) . . (+25). . Michaelm (Talk | contribs) (Experimental Meetings)
     20:50 (Upload log). . [Chgarcia‎; Grames‎]
     20:50 . . Grames (Talk | contribs) uploaded File:Talk c3q March2021.pdf
     08:10 . . Chgarcia (Talk | contribs) uploaded File:WienSpinControlbyRiad.pptx
     20:50  PPB - Mar 31, 2021‎ (diff | hist) . . (+33). . Grames (Talk | contribs)
     20:01  CIS Phase 1 work plans‎‎ (10 changes | history) . . (+12,259). . [Moser‎ (10×)]
     20:01 (cur | prev) . . (+30). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     18:17 (cur | prev) . . (+2,507). . Moser (Talk | contribs) (Week 30 (Apr 26 - Apr 30))
     18:16 (cur | prev) . . (+2,508). . Moser (Talk | contribs) (Week 29 (Apr 19 - Apr 23))
     18:16 (cur | prev) . . (+2,510). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     18:15 (cur | prev) . . (+152). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     17:59 (cur | prev) . . (+110). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     10:12 (cur | prev) . . (+944). . Moser (Talk | contribs)
     09:58 (cur | prev) . . (+3,345). . Moser (Talk | contribs)
     09:52 (cur | prev) . . (+185). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     08:14 (cur | prev) . . (-32). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     18:04  Phase 1 - HCO & Commissioning‎‎ (3 changes | history) . . (+223). . [Moser‎ (3×)]
     18:04 (cur | prev) . . (+1). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     18:04 (cur | prev) . . (-84). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     18:03 (cur | prev) . . (+306). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     10:59  Bubble Chamber Meeting Tuesday March 30, 2021‎‎ (2 changes | history) . . (+88). . [Suleiman‎ (2×)]
     10:59 (cur | prev) . . (-1). . Suleiman (Talk | contribs)
     10:59 (cur | prev) . . (+89). . Suleiman (Talk | contribs)
N    10:53  Bubble Chamber Meeting Tuesday April 6, 2021‎ (diff | hist) . . (+309). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday April 6 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...")
     10:52  Planning Meetings‎ (diff | hist) . . (+58). . Suleiman (Talk | contribs)
     08:09  WF Wien Filters (200 kV upgrade)‎ (diff | hist) . . (+73). . Chgarcia (Talk | contribs)

29 March 2021

     21:33  CIS Phase 1 work plans‎‎ (4 changes | history) . . (+25). . [Moser‎ (4×)]
     21:33 (cur | prev) . . (-15). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     20:46 (cur | prev) . . (-3). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     20:44 (cur | prev) . . (-1). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     20:44 (cur | prev) . . (+44). . Moser (Talk | contribs) (Week 26 (Mar 29 - Apr 2))
     19:31  Phase 1‎‎ (3 changes | history) . . (+261). . [Grames‎; Moser‎ (2×)]
     19:31 (cur | prev) . . (+119). . Moser (Talk | contribs) (ATLIS Tasks)
     09:57 (cur | prev) . . (+119). . Moser (Talk | contribs) (ATLIS Tasks)
     09:43 (cur | prev) . . (+23). . Grames (Talk | contribs)
     18:46  Phase 1 - HCO & Commissioning‎‎ (4 changes | history) . . (+125). . [Moser‎ (4×)]
     18:46 (cur | prev) . . (0). . Moser (Talk | contribs) (Activities)
     18:46 (cur | prev) . . (+130). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     18:44 (cur | prev) . . (0). . Moser (Talk | contribs) (Activities)
     18:36 (cur | prev) . . (-5). . Moser (Talk | contribs) (System Readiness / HCO Schedule (Apr 5 - Apr 30))
     18:44 (Upload log). . [Chgarcia‎; Moser‎ (3×); Suleiman‎ (7×)]
     18:44 . . Moser (Talk | contribs) uploaded File:Beam commissioning full details rev8.png
     18:44 . . Moser (Talk | contribs) uploaded File:Commissioning testplans Rev8.png
     17:38 . . Moser (Talk | contribs) uploaded File:12GeV injector quick reference rev17 DRAFT-4.pdf
     09:55 . . Suleiman (Talk | contribs) uploaded File:NewFieldMap CW MFX4.txt
     09:55 . . Suleiman (Talk | contribs) uploaded File:NewFieldMap SW MFX4.txt
     09:55 . . Suleiman (Talk | contribs) uploaded File:NewFieldMap CW MFX2.txt
     09:54 . . Suleiman (Talk | contribs) uploaded File:NewFieldMap SW MFX2.txt
     09:54 . . Suleiman (Talk | contribs) uploaded File:NewFieldMap CW MFX1.txt
     09:54 . . Suleiman (Talk | contribs) uploaded File:NewFieldMap SW MFX1.txt
     09:54 . . Suleiman (Talk | contribs) uploaded File:MFX Solenoids FieldMap.pptx
     09:46 . . Chgarcia (Talk | contribs) uploaded File:Wien HV rack ISB March 2021.jpg
     17:38  AIPINJ - Layouts‎‎ (3 changes | history) . . (+121). . [Moser‎ (3×)]
     17:38 (cur | prev) . . (+1). . Moser (Talk | contribs) (Injector Quick Reference)
     17:38 (cur | prev) . . (-1). . Moser (Talk | contribs) (Injector Quick Reference)
     17:37 (cur | prev) . . (+121). . Moser (Talk | contribs) (Injector Quick Reference)
N    10:28  GTS meeting 3 29 21‎‎ (2 changes | history) . . (+958). . [Suleiman‎ (2×)]
     10:28 (cur | prev) . . (+2). . Suleiman (Talk | contribs)
N    09:33 (cur | prev) . . (+956). . Suleiman (Talk | contribs) (Created page with "* Upgrade Glassman Gun PSS interlock chassis (Scott) * Add vacuum interlock to HV supply (Scott) Plan B: Install Spellman 225 kV power supply * Beamline - no bake of beamli...")
     09:58  FX beamline and FY chopper solenoids‎‎ (2 changes | history) . . (+313). . [Suleiman‎ (2×)]
     09:58 (cur | prev) . . (-1). . Suleiman (Talk | contribs)
     09:54 (cur | prev) . . (+314). . Suleiman (Talk | contribs)
     09:45  200kV High Voltage Power Supply & Controls‎ (diff | hist) . . (+41). . Chgarcia (Talk | contribs)
N    09:44  FG spin solenoids‎ (diff | hist) . . (+36). . Grames (Talk | contribs) (Created page with "Any updates for FG spin solenoids...")