Recent changes

Jump to: navigation, search

Track the most recent changes to the wiki on this page.

Recent changes options
Legend:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide minor edits | Hide bots | Hide anonymous users | Hide registered users | Show my edits

Show new changes starting from 15:23, 6 February 2023
   

6 February 2023

     14:56  CIS-ASY-R28-1‎ (diff | hist) . . (+95). . Chgarcia (Talk | contribs) (T-shape, large grain Nb electrode mounted on white R28 insulator and vacuum fired flange. Operational in UITF, routinely delivering beam at 180 kV)
N    14:48  Feb 7, 2023 - CIS Group meeting‎‎ (8 changes | history) . . (+1,947). . [Grames‎ (8×)]
     14:48 (cur | prev) . . (+28). . Grames (Talk | contribs)
     14:46 (cur | prev) . . (+104). . Grames (Talk | contribs)
     14:32 (cur | prev) . . (-8). . Grames (Talk | contribs)
     14:32 (cur | prev) . . (-12). . Grames (Talk | contribs)
     14:29 (cur | prev) . . (+61). . Grames (Talk | contribs)
     14:24 (cur | prev) . . (+137). . Grames (Talk | contribs)
     14:22 (cur | prev) . . (+1). . Grames (Talk | contribs)
N    14:22 (cur | prev) . . (+1,636). . Grames (Talk | contribs) (Created page with "== Agenda == === Upcoming CEBAF/UITF jobs === * Status of UITF (booster, status of gun testing) * CEBAF "200 kV" jobs (vacuum/table "hooksup" of 200 kV gun, Phil's harp plan)...")
     14:30 (Upload log). . [Grames‎ (3×)]
     14:30 . . Grames (Talk | contribs) uploaded File:SAD discussion 300123.pdf
     14:25 . . Grames (Talk | contribs) uploaded File:JLab AAC Agenda Mar 2023 v3.docx
     14:25 . . Grames (Talk | contribs) uploaded File:JLAAC Charge Mar 2023.docx
     14:11  CIS Group Meetings‎ (diff | hist) . . (+37). . Grames (Talk | contribs)
     13:12  Gun assemblies, electrostatic models and field maps‎ (diff | hist) . . (0). . Chgarcia (Talk | contribs) (T-shape Electrode Assemblies on R28 insulators in 15" diameter vacuum chamber)

2 February 2023

     06:25 (Upload log) . . Samih (Talk | contribs) uploaded File:Positron production optimization.pdf

1 February 2023

     11:58  Document-Controlled Procedures and Assessments for UITF‎ (diff | hist) . . (+14). . Poelker (Talk | contribs)
     09:52  PPB - February 1, 2022‎ (diff | hist) . . (+45). . Ushakov (Talk | contribs)
     09:50 (Upload log) . . Ushakov (Talk | contribs) uploaded File:230201-Target-Geant4-Ushakov.pptx

31 January 2023

N    18:59  PPB - February 1, 2022‎‎ (7 changes | history) . . (+2,566). . [Grames‎ (7×)]
     18:59 (cur | prev) . . (+7). . Grames (Talk | contribs)
     18:59 (cur | prev) . . (+5). . Grames (Talk | contribs)
     18:58 (cur | prev) . . (+427). . Grames (Talk | contribs)
     18:55 (cur | prev) . . (+35). . Grames (Talk | contribs)
     18:54 (cur | prev) . . (+202). . Grames (Talk | contribs)
     18:45 (cur | prev) . . (+268). . Grames (Talk | contribs)
N    18:33 (cur | prev) . . (+1,622). . Grames (Talk | contribs) (Created page with "== Meeting Coordinates == * On-site => Wednesdays @ 11am EDT in TL-2236 * Zoom => https://jlab-org.zoomgov.com/j/1616149761?pwd=SDJKY3NhWEtBOUR5MVR5RlY1R1pHdz09&from=addon ==...")
     18:30  PPB Meetings‎ (diff | hist) . . (+67). . Grames (Talk | contribs)

30 January 2023

     08:19  Main Page‎ (diff | hist) . . (+129). . Grames (Talk | contribs)