Recent changes

Jump to: navigation, search

Track the most recent changes to the wiki on this page.

Recent changes options
Legend:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Show minor edits | Hide bots | Show anonymous users | Hide registered users | Hide my edits

Show new changes starting from 15:57, 26 July 2021
   

26 July 2021

N    15:30  HV insulator for 500 kV‎ (diff | hist) . . (+138). . Gabrielp (Talk | contribs) (Created page with "== HV insulator for 500 kV: == ** Exploring the use of the receptacle and the sizes of the SF6 spool Media:HV_insulator-1st_month.pptx")
     15:28  Research and Design‎ (diff | hist) . . (+75). . Gabrielp (Talk | contribs)
     15:24  Electrostatic and beam dynamics simulations‎ (diff | hist) . . (+112). . Gabrielp (Talk | contribs)
     15:22  Gabriel Palacios-Serrano‎‎ (2 changes | history) . . (+252). . [Gabrielp‎ (2×)]
     15:22 (cur | prev) . . (+112). . Gabrielp (Talk | contribs)
     08:36 (cur | prev) . . (+140). . Gabrielp (Talk | contribs)
     15:18 (Upload log). . [Gabrielp‎ (2×); Mstefani‎ (6×)]
     15:18 . . Gabrielp (Talk | contribs) uploaded File:18in gun anode studies.pptx
     14:36 . . Mstefani (Talk | contribs) uploaded a new version of File:ProgRef.pdf
     14:34 . . Mstefani (Talk | contribs) uploaded File:ProgRef.pdf
     14:34 . . Mstefani (Talk | contribs) uploaded File:GPT-Spin.pdf
     14:32 . . Mstefani (Talk | contribs) uploaded File:UserManual.pdf
     14:24 . . Mstefani (Talk | contribs) uploaded File:GPT-S Update.pptx
     14:23 . . Mstefani (Talk | contribs) uploaded File:GPT-S 43021.pptx
     08:36 . . Gabrielp (Talk | contribs) uploaded File:HV insulator-1st month.pptx
N    14:34  PPB GPT -s Development‎‎ (7 changes | history) . . (+399). . [Mstefani‎ (7×)]
     14:34 (cur | prev) . . (+23). . Mstefani (Talk | contribs)
     14:31 (cur | prev) . . (+91). . Mstefani (Talk | contribs)
     14:23 (cur | prev) . . (+59). . Mstefani (Talk | contribs)
     14:13 (cur | prev) . . (+21). . Mstefani (Talk | contribs)
     12:46 (cur | prev) . . (-19). . Mstefani (Talk | contribs)
     12:25 (cur | prev) . . (-2). . Mstefani (Talk | contribs)
N    12:24 (cur | prev) . . (+226). . Mstefani (Talk | contribs) (Created page with "===General Particle Tracer Spin Tracking === Computing home page : https://cc.jlab.org Scientific Computing home page : https://scicomp.jlab.org/scicomp :ifarml01.jlab.org :...")
     12:22  PPB Technical Areas‎‎ (2 changes | history) . . (+28). . [Mstefani‎ (2×)]
     12:22 (cur | prev) . . (0). . Mstefani (Talk | contribs)
     12:22 (cur | prev) . . (+28). . Mstefani (Talk | contribs)
     12:21  Polarized Positron Beams for CEBAF‎‎ (3 changes | history) . . (0). . [Mstefani‎ (3×)]
     12:21 (cur | prev) . . (-28). . Mstefani (Talk | contribs)
     12:21 (cur | prev) . . (+1). . Mstefani (Talk | contribs)
     12:21 (cur | prev) . . (+27). . Mstefani (Talk | contribs)
     09:20  Phase 1 Commissioning Schedule‎ (diff | hist) . . (0). . Bruker (Talk | contribs)

23 July 2021

     18:49  Phase 1 Commissioning Schedule‎ (diff | hist) . . (+55). . Bruker (Talk | contribs)

22 July 2021

     20:11  Phase 1 Commissioning Schedule‎ (diff | hist) . . (+53). . Bruker (Talk | contribs)
     09:48  July 21, 2021 - Group Meeting‎ (diff | hist) . . (+53). . Marcy (Talk | contribs)

21 July 2021

     16:05  Phase 1 Commissioning Schedule‎ (diff | hist) . . (+3,786). . Bruker (Talk | contribs)
     10:22  2021-07-21‎‎ (11 changes | history) . . (+2,804). . [Michaelm‎ (11×)]
     10:22 (cur | prev) . . (+43). . Michaelm (Talk | contribs) (New items for discussion:)
     10:15 (cur | prev) . . (+146). . Michaelm (Talk | contribs) (New items for discussion:)
     08:57 (cur | prev) . . (+94). . Michaelm (Talk | contribs) (New items for discussion:)
     08:56 (cur | prev) . . (-30). . Michaelm (Talk | contribs) (New items for discussion:)
     08:55 (cur | prev) . . (+276). . Michaelm (Talk | contribs) (New items for discussion:)
     08:51 (cur | prev) . . (+520). . Michaelm (Talk | contribs) (New items for discussion:)
     08:41 (cur | prev) . . (+210). . Michaelm (Talk | contribs) (New items for discussion:)
     08:37 (cur | prev) . . (+137). . Michaelm (Talk | contribs) (New items for discussion:)
     08:32 (cur | prev) . . (+282). . Michaelm (Talk | contribs) (New items for discussion:)
     08:20 (cur | prev) . . (+1,126). . Michaelm (Talk | contribs)
     08:04 (cur | prev) . . (0). . Michaelm (Talk | contribs)
N    08:44  July 21, 2021 - Group Meeting‎‎ (9 changes | history) . . (+1,554). . [Grames‎ (9×)]
     08:44 (cur | prev) . . (+15). . Grames (Talk | contribs)
     08:43 (cur | prev) . . (+97). . Grames (Talk | contribs)
     08:41 (cur | prev) . . (+1). . Grames (Talk | contribs)
     08:41 (cur | prev) . . (+158). . Grames (Talk | contribs)
     08:21 (cur | prev) . . (+1). . Grames (Talk | contribs)
     08:21 (cur | prev) . . (-4). . Grames (Talk | contribs)
     08:20 (cur | prev) . . (+16). . Grames (Talk | contribs)
     08:19 (cur | prev) . . (+15). . Grames (Talk | contribs)
N    08:18 (cur | prev) . . (+1,255). . Grames (Talk | contribs) (Created page with ";Group business * Promised a couple months ago to sit with each of you, talk about status and next year...so, finally, I will start this... ;Around the table status updates *...")
     08:41 (Upload log). . [Michaelm‎ (5×)]
     08:41 . . Michaelm (Talk | contribs) uploaded File:ESAD UITF-irradiation beamline 071421.docx(ESAD)
     08:41 . . Michaelm (Talk | contribs) uploaded File:COO-UITF-irradiation-exp 070921.docx(COO)
     08:37 . . Michaelm (Talk | contribs) uploaded File:JL0029599-2000UITF MeV BEAMLINE07-JUN-21.pdf(MeV song sheet)
     08:33 . . Michaelm (Talk | contribs) uploaded File:FC4-SHIELDING 20JUL21v1.pdf(FC4 shielding design)
     08:33 . . Michaelm (Talk | contribs) uploaded File:FC3-SHIELDING 20JUL21v1.pdf(FC3 shielding design)
     08:11  CIS Group Meetings‎ (diff | hist) . . (+35). . Grames (Talk | contribs)

20 July 2021

     17:42  Phase 1 Commissioning Schedule‎ (diff | hist) . . (+96). . Bruker (Talk | contribs)
     14:55 (Upload log). . [Poelker‎ (3×)]
     14:55 . . Poelker (Talk | contribs) uploaded File:FCup4 shielding.pdf
     14:54 . . Poelker (Talk | contribs) uploaded File:FCup3 shielding.pdf
     10:11 . . Poelker (Talk | contribs) uploaded File:Xi's list of elements through the water irradiation beamline.xls
     14:54  CAD layouts of the beamline‎ (diff | hist) . . (+62). . Poelker (Talk | contribs)
     14:42  Gas and Ion Beam Effects in Linacs‎ (diff | hist) . . (+152). . Grames (Talk | contribs)
     10:11  UITF Element Database‎ (diff | hist) . . (+90). . Poelker (Talk | contribs)

19 July 2021

     16:16  Phase 1 Commissioning Schedule‎ (diff | hist) . . (+73). . Bruker (Talk | contribs)
     14:50  CIS OnCall and Troubleshooting‎‎ (3 changes | history) . . (+581). . [Chgarcia‎ (3×)]
     14:50 (cur | prev) . . (+234). . Chgarcia (Talk | contribs) (Bypassing the gun 15 deg dipole magnet)
     14:49 (cur | prev) . . (+301). . Chgarcia (Talk | contribs) (Bypassing the gun 15 deg dipole magnet)
     14:46 (cur | prev) . . (+46). . Chgarcia (Talk | contribs)
N    11:51  2021-07-21‎‎ (2 changes | history) . . (+2,826). . [Michaelm‎ (2×)]
     11:51 (cur | prev) . . (-78). . Michaelm (Talk | contribs)
N    11:44 (cur | prev) . . (+2,904). . Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
     11:43  Meeting minutes‎‎ (7 changes | history) . . (+75). . [Michaelm‎ (7×)]
     11:43 (cur | prev) . . (0). . Michaelm (Talk | contribs)
     11:42 (cur | prev) . . (0). . Michaelm (Talk | contribs)
     11:41 (cur | prev) . . (+15). . Michaelm (Talk | contribs)
     11:21 (cur | prev) . . (0). . Michaelm (Talk | contribs)
     11:20 (cur | prev) . . (+8). . Michaelm (Talk | contribs)
     11:19 (cur | prev) . . (-11). . Michaelm (Talk | contribs)
     11:17 (cur | prev) . . (+63). . Michaelm (Talk | contribs) (Experimental Meetings)
N    11:43  2021-07-14‎ (diff | hist) . . (+564). . Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
N    11:40  2021-07-07‎‎ (4 changes | history) . . (+2,904). . [Michaelm‎ (4×)]
     11:40 (cur | prev) . . (+335). . Michaelm (Talk | contribs) (New items for discussion:)
     11:36 (cur | prev) . . (+276). . Michaelm (Talk | contribs) (New items for discussion:)
     11:26 (cur | prev) . . (-953). . Michaelm (Talk | contribs) (New items for discussion:)
N    11:21 (cur | prev) . . (+3,246). . Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
     11:29 (Upload log) . . Michaelm (Talk | contribs) uploaded File:Engineering-support-jobs.docx
N    09:34  Bubble Chamber Meeting Tuesday July 20, 2021‎ (diff | hist) . . (+309). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday July 20 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...")
     09:33  Planning Meetings‎ (diff | hist) . . (+58). . Suleiman (Talk | contribs)

16 July 2021

     16:07  Phase 1 Commissioning Schedule‎‎ (2 changes | history) . . (+3,862). . [Bruker‎ (2×)]
     16:07 (cur | prev) . . (-7). . Bruker (Talk | contribs)
     16:05 (cur | prev) . . (+3,869). . Bruker (Talk | contribs)
N    13:39  HarmonicKicker-2021-07-16‎‎ (2 changes | history) . . (+643). . [Bruker‎ (2×)]
     13:39 (cur | prev) . . (-10). . Bruker (Talk | contribs)
N    13:39 (cur | prev) . . (+653). . Bruker (Talk | contribs) (Created page with "== Proposal writing == * Joe says we should write a short internal document outlining what we would like to do. * Purpose (in the context of EIC, perhaps) * Possible prec...")
     13:28  Meeting minutes‎ (diff | hist) . . (+21). . Bruker (Talk | contribs)
     09:09 (Upload log) . . Voutier (Talk | contribs) uploaded File:Benjamin-71621.pdf
     09:08  Compton Transmission Polarimeter‎‎ (3 changes | history) . . (+40). . [Voutier‎ (3×)]
     09:08 (cur | prev) . . (+7). . Voutier (Talk | contribs) (Compton Transmission Polarimeter Meetings)
     09:06 (cur | prev) . . (-1). . Voutier (Talk | contribs) (Compton Transmission Polarimeter Meetings)
     09:05 (cur | prev) . . (+34). . Voutier (Talk | contribs)

15 July 2021

     16:36  Phase 1 Commissioning Schedule‎ (diff | hist) . . (-71). . Bruker (Talk | contribs)

14 July 2021

     15:54  Phase 1 Commissioning Schedule‎ (diff | hist) . . (+47). . Bruker (Talk | contribs)
     12:38  PPB - Jul 14, 2021‎‎ (3 changes | history) . . (+424). . [Mstefani‎ (3×)]
     12:38 (cur | prev) . . (+17). . Mstefani (Talk | contribs)
     12:36 (cur | prev) . . (+24). . Mstefani (Talk | contribs)
     12:13 (cur | prev) . . (+383). . Mstefani (Talk | contribs)
     12:37 (Upload log). . [Mstefani‎ (2×)]
     12:37 . . Mstefani (Talk | contribs) uploaded File:HarmonicAccCavity.pdf
     12:35 . . Mstefani (Talk | contribs) uploaded File:Optimizationslide7142021.pptx