Recent changes

Jump to: navigation, search

Track the most recent changes to the wiki on this page.

Recent changes options
Legend:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide minor edits | Show bots | Hide anonymous users | Hide registered users | Show my edits

Show new changes starting from 01:20, 17 April 2021
   

16 April 2021

     17:54  CIS Phase 1 work plans‎‎ (4 changes | history) . . (+264). . [Moser‎ (4×)]
     17:54 (cur | prev) . . (+44). . Moser (Talk | contribs) (Week 29 (Apr 19 - Apr 23))
     17:53 (cur | prev) . . (+12). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     17:52 (cur | prev) . . (+251). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     08:22 (cur | prev) . . (-43). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     14:13  CIS Student Presentations‎ (diff | hist) . . (-61). . Chgarcia (Talk | contribs)
N    14:08  Theses‎‎ (2 changes | history) . . (+145). . [Chgarcia‎ (2×)]
     14:08 (cur | prev) . . (+21). . Chgarcia (Talk | contribs)
N    14:01 (cur | prev) . . (+124). . Chgarcia (Talk | contribs) (Created page with "* [https://drive.google.com/file/d/1FpWgPuf9JgBxLSfFNQE8-ZHq7Sncs88N/view Gabriel Palacios-Serrano PhD Dissertation defense]")
     13:58  CIS Conference and Workshop Proceedings‎‎ (3 changes | history) . . (+219). . [Chgarcia‎ (3×)]
     13:58 (cur | prev) . . (-2). . Chgarcia (Talk | contribs)
     13:57 (cur | prev) . . (+2). . Chgarcia (Talk | contribs)
     13:55 (cur | prev) . . (+219). . Chgarcia (Talk | contribs)
     13:56 (Upload log) . . Chgarcia (Talk | contribs) uploaded File:Hernandez-Garcia IEEE-abstract JLab approved and conference accepted.docx
     12:16  CIS Library‎ (diff | hist) . . (+12). . Grames (Talk | contribs)
     08:50  To-do list‎‎ (3 changes | history) . . (+227). . [Michaelm‎ (3×)]
     08:50 (cur | prev) . . (+163). . Michaelm (Talk | contribs)
     08:45 (cur | prev) . . (+59). . Michaelm (Talk | contribs)
     08:43 (cur | prev) . . (+5). . Michaelm (Talk | contribs)

15 April 2021

     19:30  CIS Phase 1 work plans‎‎ (10 changes | history) . . (+2,305). . [Moser‎ (10×)]
     19:30 (cur | prev) . . (-101). . Moser (Talk | contribs)
     19:21 (cur | prev) . . (+4). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     18:41 (cur | prev) . . (-24). . Moser (Talk | contribs) (Week 29 (Apr 19 - Apr 23))
     14:25 (cur | prev) . . (+66). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     14:24 (cur | prev) . . (+52). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     14:23 (cur | prev) . . (+687). . Moser (Talk | contribs) (Week 29 (Apr 19 - Apr 23))
     14:20 (cur | prev) . . (+686). . Moser (Talk | contribs)
     14:14 (cur | prev) . . (+455). . Moser (Talk | contribs) (Week 29 (Apr 19 - Apr 23))
     14:08 (cur | prev) . . (+268). . Moser (Talk | contribs) (Week 29 (Apr 19 - Apr 23))
     14:06 (cur | prev) . . (+212). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))

14 April 2021

     17:33  CIS Phase 1 work plans‎‎ (6 changes | history) . . (+1,294). . [Moser‎ (6×)]
     17:33 (cur | prev) . . (+1). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     10:46 (cur | prev) . . (+510). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     09:38 (cur | prev) . . (+56). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     09:36 (cur | prev) . . (+625). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     08:30 (cur | prev) . . (+26). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     08:14 (cur | prev) . . (+76). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     15:12 (Upload log). . [Voutier‎; Chgarcia‎; Grames‎ (2×); Michaelm‎ (2×); Poelker‎ (6×)]
     15:12 . . Poelker (Talk | contribs) uploaded File:ESource KOM presentation ILC inverted gun.pptx
     15:08 . . Poelker (Talk | contribs) uploaded File:JLab ILC inverted gun status.pptx
     15:05 . . Poelker (Talk | contribs) uploaded a new version of File:ILC 200kV Inverted Gun.pptx
     15:03 . . Poelker (Talk | contribs) uploaded File:R&D status ILC 200 kV inverted gun.pptx
     14:56 . . Chgarcia (Talk | contribs) uploaded File:UITF pucks in HV and prep chambers as of March 31 2021.jpg
     14:55 . . Poelker (Talk | contribs) uploaded File:ILC 200kV Inverted Gun.pptx
     14:51 . . Poelker (Talk | contribs) uploaded File:JLab ILC gun Nomura Research Institute visit.pptx
     10:10 . . Voutier (Talk | contribs) uploaded File:PDVCS-BCA@CLAS12.pptx
     09:21 . . Michaelm (Talk | contribs) uploaded File:Wastewater-Schedule-Strawman-v2.pdf(Schedule strawman v2)
     08:20 . . Michaelm (Talk | contribs) uploaded File:Wastewater-Schedule-Strawman.pdf(Strawman schedule for Wastewater Irradiation Experiment installation)
     06:28 . . Grames (Talk | contribs) uploaded File:210414 HaveWant.pptx
     06:28 . . Grames (Talk | contribs) uploaded File:210414 UITF 15degLine Summary.xlsx
     15:11  CIS Presentations‎‎ (6 changes | history) . . (+585). . [Poelker‎ (6×)]
     15:11 (cur | prev) . . (+145). . Poelker (Talk | contribs) (2007)
     15:07 (cur | prev) . . (+29). . Poelker (Talk | contribs)
     15:02 (cur | prev) . . (-11). . Poelker (Talk | contribs)
     14:59 (cur | prev) . . (+115). . Poelker (Talk | contribs)
     14:55 (cur | prev) . . (+163). . Poelker (Talk | contribs)
     14:49 (cur | prev) . . (+144). . Poelker (Talk | contribs)
     14:56  Spring 2021 - Rebuilding Photogun‎‎ (13 changes | history) . . (+996). . [Chgarcia‎ (6×); Grames‎ (7×)]
     14:56 (cur | prev) . . (+71). . Chgarcia (Talk | contribs)
     14:55 (cur | prev) . . (+4). . Chgarcia (Talk | contribs)
     14:54 (cur | prev) . . (-4). . Chgarcia (Talk | contribs)
     14:53 (cur | prev) . . (-4). . Chgarcia (Talk | contribs)
     14:52 (cur | prev) . . (+26). . Chgarcia (Talk | contribs)
     14:51 (cur | prev) . . (+342). . Chgarcia (Talk | contribs)
     13:43 (cur | prev) . . (+262). . Grames (Talk | contribs)
     06:39 (cur | prev) . . (+9). . Grames (Talk | contribs)
     06:39 (cur | prev) . . (+3). . Grames (Talk | contribs)
     06:38 (cur | prev) . . (+88). . Grames (Talk | contribs)
     06:37 (cur | prev) . . (-2). . Grames (Talk | contribs)
     06:36 (cur | prev) . . (+155). . Grames (Talk | contribs)
     06:27 (cur | prev) . . (+46). . Grames (Talk | contribs)
N    11:51  Phase2 ME meeting minutes 4 14 2021‎‎ (7 changes | history) . . (+2,453). . [Poelker‎ (7×)]
     11:51 (cur | prev) . . (+124). . Poelker (Talk | contribs)
     11:50 (cur | prev) . . (+122). . Poelker (Talk | contribs)
     11:49 (cur | prev) . . (+1,049). . Poelker (Talk | contribs)
     11:41 (cur | prev) . . (+3). . Poelker (Talk | contribs)
     11:40 (cur | prev) . . (+3). . Poelker (Talk | contribs)
     11:38 (cur | prev) . . (-3). . Poelker (Talk | contribs)
N    11:38 (cur | prev) . . (+1,155). . Poelker (Talk | contribs) (Created page with "phase2 ME design meeting minutes 4_14_2021 Danny, Shaun, Gary, Grames, Marcy, Poelker, Reza, Alicia Gary presented a "vacuum tight" layout, nice Comments: # wider girder,...")
     11:29  AIPINJ - Phase 2 Upgrade Meetings‎ (diff | hist) . . (+43). . Poelker (Talk | contribs)
     10:10  PPB - Apr 14, 2021‎ (diff | hist) . . (+32). . Voutier (Talk | contribs) (Agenda)
N    09:22  2021-04-14‎‎ (8 changes | history) . . (+1,977). . [Michaelm‎ (8×)]
     09:22 (cur | prev) . . (+1). . Michaelm (Talk | contribs) (Reports on Open Action Items:)
     09:19 (cur | prev) . . (+3). . Michaelm (Talk | contribs) (Reports on Open Action Items:)
     09:17 (cur | prev) . . (-1). . Michaelm (Talk | contribs) (Reports on Open Action Items:)
     08:22 (cur | prev) . . (+1). . Michaelm (Talk | contribs) (Reports on Open Action Items:)
     08:22 (cur | prev) . . (+3). . Michaelm (Talk | contribs) (Reports on Open Action Items:)
     08:12 (cur | prev) . . (-21). . Michaelm (Talk | contribs) (Reports on Open Action Items:)
     08:12 (cur | prev) . . (+32). . Michaelm (Talk | contribs) (Reports on Open Action Items:)
N    08:11 (cur | prev) . . (+1,959). . Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
     08:03  Meeting minutes‎ (diff | hist) . . (+25). . Michaelm (Talk | contribs) (Meeting Agendas and Notes)

13 April 2021

N    13:53  PPB - Apr 14, 2021‎‎ (3 changes | history) . . (+1,007). . [Grames‎ (3×)]
     13:53 (cur | prev) . . (+5). . Grames (Talk | contribs)
     13:52 (cur | prev) . . (0). . Grames (Talk | contribs)
N    08:29 (cur | prev) . . (+1,002). . Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed ('''UAS 9am''', JLab 11am, IJCLab 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda == * Intro...")
N    11:41  Bubble Chamber Meeting Tuesday April 20, 2021‎ (diff | hist) . . (+310). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday April 20 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number:...")
     11:41  Planning Meetings‎ (diff | hist) . . (+59). . Suleiman (Talk | contribs)
     10:48  CIS Phase 1 work plans‎‎ (4 changes | history) . . (+348). . [Moser‎ (4×)]
     10:48 (cur | prev) . . (+18). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     10:47 (cur | prev) . . (+148). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     10:45 (cur | prev) . . (+152). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     08:20 (cur | prev) . . (+30). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     08:21  PPB Meetings‎ (diff | hist) . . (+109). . Grames (Talk | contribs)

12 April 2021

     20:37  CIS Phase 1 work plans‎‎ (18 changes | history) . . (+1,041). . [Moser‎ (18×)]
     20:37 (cur | prev) . . (+14). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     20:35 (cur | prev) . . (+10). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     20:33 (cur | prev) . . (+174). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     20:19 (cur | prev) . . (+37). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     19:46 (cur | prev) . . (+20). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     17:17 (cur | prev) . . (-7). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     17:16 (cur | prev) . . (-25). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     17:08 (cur | prev) . . (+1). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     17:08 (cur | prev) . . (-5). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     17:06 (cur | prev) . . (+268). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     09:39 (cur | prev) . . (0). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     09:21 (cur | prev) . . (+2). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     09:19 (cur | prev) . . (+85). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     09:16 (cur | prev) . . (+57). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     09:05 (cur | prev) . . (+253). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     08:28 (cur | prev) . . (+9). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     08:27 (cur | prev) . . (+41). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     08:19 (cur | prev) . . (+107). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     14:52  SRF Booster‎‎ (8 changes | history) . . (+719). . [Poelker‎ (8×)]
     14:52 (cur | prev) . . (-1). . Poelker (Talk | contribs)
     14:51 (cur | prev) . . (0). . Poelker (Talk | contribs)
     14:50 (cur | prev) . . (+193). . Poelker (Talk | contribs)
     14:46 (cur | prev) . . (+160). . Poelker (Talk | contribs)
     14:43 (cur | prev) . . (+95). . Poelker (Talk | contribs)
     14:43 (cur | prev) . . (+44). . Poelker (Talk | contribs)
     14:38 (cur | prev) . . (+25). . Poelker (Talk | contribs)
     14:29 (cur | prev) . . (+203). . Poelker (Talk | contribs)
     14:47 (Upload log). . [Chgarcia‎ (2×); Poelker‎ (6×)]
     14:47 . . Poelker (Talk | contribs) uploaded File:Haipeng booster IPAC2015.pdf
     14:47 . . Poelker (Talk | contribs) uploaded File:Haipeng booster IPAC2013.pdf
     14:44 . . Poelker (Talk | contribs) uploaded File:Yan's summary of booster studies to date.pptx
     14:41 . . Poelker (Talk | contribs) uploaded File:Reza's booster requirements.docx
     14:30 . . Poelker (Talk | contribs) uploaded File:Haipeng's ppt slides with booster design features.docx
     14:26 . . Poelker (Talk | contribs) uploaded File:Max's RF power measurements related to nonlinear behavior of 2-cell GSet.pdf
     08:57 . . Chgarcia (Talk | contribs) uploaded File:Horizontal Wien Integrals (19.9A Hyst) with SCE410 CORRECT Ni plates.xlsx
     08:56 . . Chgarcia (Talk | contribs) uploaded File:Vertical Wien Integrals (19.9A Hyst) with SCE410.xlsx
N    14:34  GTS meeting 4 12 21‎‎ (8 changes | history) . . (+1,002). . [Suleiman‎ (8×)]
     14:34 (cur | prev) . . (+116). . Suleiman (Talk | contribs)
     10:48 (cur | prev) . . (-6). . Suleiman (Talk | contribs)
     09:33 (cur | prev) . . (+6). . Suleiman (Talk | contribs)
     09:21 (cur | prev) . . (+45). . Suleiman (Talk | contribs)
     09:12 (cur | prev) . . (-8). . Suleiman (Talk | contribs)
     09:10 (cur | prev) . . (-312). . Suleiman (Talk | contribs)
     09:10 (cur | prev) . . (+102). . Suleiman (Talk | contribs)
N    09:08 (cur | prev) . . (+1,059). . Suleiman (Talk | contribs) (Created page with "* Upgrade Glassman Gun PSS interlock chassis (Scott) * Add vacuum interlock to HV supply (Scott) Plan B: Install Spellman 225 kV power supply. Did not work because we could n...")
     14:32  GTS meeting 3 29 21‎‎ (2 changes | history) . . (-34). . [Suleiman‎ (2×)]
     14:32 (cur | prev) . . (-28). . Suleiman (Talk | contribs)
     10:46 (cur | prev) . . (-6). . Suleiman (Talk | contribs)
     14:32  GTS meeting 3 19 21‎‎ (2 changes | history) . . (-34). . [Suleiman‎ (2×)]
     14:32 (cur | prev) . . (-28). . Suleiman (Talk | contribs)
     10:47 (cur | prev) . . (-6). . Suleiman (Talk | contribs)
     14:26  Max's thoughts on QCM GSet calibration‎ (diff | hist) . . (+88). . Poelker (Talk | contribs)
     10:47  GTS meeting 2 02 21‎ (diff | hist) . . (-6). . Suleiman (Talk | contribs)
     09:08  Gun Test Stand Meeting Minutes and To-Do Lists‎ (diff | hist) . . (+63). . Suleiman (Talk | contribs)
     08:56  WF Wien Filters (200 kV upgrade)‎ (diff | hist) . . (+170). . Chgarcia (Talk | contribs)

9 April 2021

     14:42  CIS Phase 1 work plans‎‎ (7 changes | history) . . (-4,180). . [Moser‎ (7×)]
     14:42 (cur | prev) . . (+13). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     14:42 (cur | prev) . . (+54). . Moser (Talk | contribs)
     14:38 (cur | prev) . . (+27). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     14:28 (cur | prev) . . (+18). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     14:20 (cur | prev) . . (+47). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     13:47 (cur | prev) . . (-4,630). . Moser (Talk | contribs)
     10:00 (cur | prev) . . (+291). . Moser (Talk | contribs) (Penetration Work)
     14:41 (Upload log) . . Moser (Talk | contribs) uploaded File:InjSB Racks no pene.png
     14:38  Phase 1 - HCO & Commissioning‎‎ (4 changes | history) . . (+161). . [Moser‎ (4×)]
     14:38 (cur | prev) . . (+27). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     14:37 (cur | prev) . . (-17). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     14:36 (cur | prev) . . (+110). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     14:36 (cur | prev) . . (+41). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
N    10:09  Phase2 ME meeting minutes 4 8 2021‎ (diff | hist) . . (+2,127). . Poelker (Talk | contribs) (Created page with "ME Design meeting , phase2, 4/8/2021 Shaun, Matt, Gary and Danny Comments and topics from meeting, some action items: #) Joe, will we be using the “green” solenoids desi...")
     10:08  AIPINJ - Phase 2 Upgrade Meetings‎ (diff | hist) . . (+42). . Poelker (Talk | contribs)

8 April 2021

     17:31  CIS Phase 1 work plans‎‎ (3 changes | history) . . (+61). . [Moser‎ (3×)]
     17:31 (cur | prev) . . (+25). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     17:05 (cur | prev) . . (-8). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     07:49 (cur | prev) . . (+44). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     13:39  UITF Operations‎‎ (21 changes | history) . . (+1,950). . [Michaelm‎ (21×)]
     13:39 (cur | prev) . . (+39). . Michaelm (Talk | contribs)
     13:35 (cur | prev) . . (+48). . Michaelm (Talk | contribs)
     13:34 (cur | prev) . . (0). . Michaelm (Talk | contribs)
     13:33 (cur | prev) . . (+25). . Michaelm (Talk | contribs)
     13:29 (cur | prev) . . (+51). . Michaelm (Talk | contribs)
     13:28 (cur | prev) . . (+9). . Michaelm (Talk | contribs)
     13:19 (cur | prev) . . (+96). . Michaelm (Talk | contribs)
     13:18 (cur | prev) . . (0). . Michaelm (Talk | contribs)
     13:18 (cur | prev) . . (-6). . Michaelm (Talk | contribs)
     13:18 (cur | prev) . . (-2). . Michaelm (Talk | contribs)
     13:17 (cur | prev) . . (+18). . Michaelm (Talk | contribs)
     13:16 (cur | prev) . . (-194). . Michaelm (Talk | contribs)
     12:44 (cur | prev) . . (+8). . Michaelm (Talk | contribs)
     12:44 (cur | prev) . . (-818). . Michaelm (Talk | contribs)
     11:25 (cur | prev) . . (+1,291). . Michaelm (Talk | contribs)
     11:23 (cur | prev) . . (-10). . Michaelm (Talk | contribs)
     11:22 (cur | prev) . . (0). . Michaelm (Talk | contribs)
     11:21 (cur | prev) . . (+894). . Michaelm (Talk | contribs)
     11:07 (cur | prev) . . (+11). . Michaelm (Talk | contribs)
     11:06 (cur | prev) . . (+17). . Michaelm (Talk | contribs)
     11:06 (cur | prev) . . (+473). . Michaelm (Talk | contribs)
     11:02  Spring 2021 - Rebuilding Photogun‎‎ (3 changes | history) . . (+337). . [Grames‎ (3×)]
     11:02 (cur | prev) . . (+83). . Grames (Talk | contribs)
     10:32 (cur | prev) . . (+233). . Grames (Talk | contribs)
     10:26 (cur | prev) . . (+21). . Grames (Talk | contribs)
     10:37 (Upload log) . . Grames (Talk | contribs) uploaded File:310402 RobustMeeting.pptx
     10:37  Robust Meetings‎ (diff | hist) . . (+75). . Grames (Talk | contribs)
     09:37  GTS meeting 3 29 21‎ (diff | hist) . . (+101). . Suleiman (Talk | contribs)
     09:35  GTS meeting 3 19 21‎ (diff | hist) . . (-45). . Suleiman (Talk | contribs)

7 April 2021

     20:31  Phase 1 - HCO & Commissioning‎‎ (15 changes | history) . . (+1,559). . [Grames‎ (3×); Moser‎ (12×)]
     20:31 (cur | prev) . . (+41). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     20:30 (cur | prev) . . (-207). . Moser (Talk | contribs)
     14:33 (cur | prev) . . (+138). . Grames (Talk | contribs)
     14:32 (cur | prev) . . (+137). . Grames (Talk | contribs)
     14:08 (cur | prev) . . (-1). . Moser (Talk | contribs) (Activities)
     13:54 (cur | prev) . . (+1). . Moser (Talk | contribs) (Activities)
     13:52 (cur | prev) . . (-1). . Moser (Talk | contribs) (Activities)
     13:52 (cur | prev) . . (-67). . Moser (Talk | contribs) (Activities)
     13:50 (cur | prev) . . (+2). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     11:51 (cur | prev) . . (+47). . Moser (Talk | contribs) (ATLis Testplans)
     11:49 (cur | prev) . . (+1,058). . Moser (Talk | contribs) (ATLis Testplans)
     10:12 (cur | prev) . . (-2). . Grames (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     09:34 (cur | prev) . . (+435). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     09:25 (cur | prev) . . (-13). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     09:25 (cur | prev) . . (-9). . Moser (Talk | contribs) (Beam Commissioning (May 3 - Jul 2))
     20:30 (Upload log). . [Chgarcia‎; Grames‎; Moser‎ (5×)]
     20:30 . . Moser (Talk | contribs) uploaded File:210407 Phase1 Commissioning.docx
     15:24 . . Chgarcia (Talk | contribs) uploaded File:Vertical Wien GPT sims with spline electrodes Surveyed.pptx
     14:14 . . Grames (Talk | contribs) uploaded File:210407 DiamondLadder.pptx
     13:51 . . Moser (Talk | contribs) uploaded File:Beam commissioning by type.png
     09:34 . . Moser (Talk | contribs) uploaded File:3.31.21 BeamCommissioningPlanLayout AIPINJ-1 firstpass.ods
     09:30 . . Moser (Talk | contribs) uploaded File:BeamINJphase1v5.pptx
     09:27 . . Moser (Talk | contribs) uploaded File:210401 Phase1 Commissioning.docx
     18:06  Phase 1‎ (diff | hist) . . (+101). . Moser (Talk | contribs) (ATLIS Tasks)
     17:05  CIS Phase 1 work plans‎‎ (5 changes | history) . . (+107). . [Moser‎ (5×)]
     17:05 (cur | prev) . . (-34). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     09:21 (cur | prev) . . (+204). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     09:19 (cur | prev) . . (+18). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     09:17 (cur | prev) . . (-62). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     09:15 (cur | prev) . . (-19). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     15:30  WF Wien Filters (200 kV upgrade)‎‎ (2 changes | history) . . (+181). . [Chgarcia‎ (2×)]
     15:30 (cur | prev) . . (+53). . Chgarcia (Talk | contribs)
     15:29 (cur | prev) . . (+128). . Chgarcia (Talk | contribs)
     15:23  Gabriel Palacios-Serrano‎‎ (2 changes | history) . . (+594). . [Chgarcia‎ (2×)]
     15:23 (cur | prev) . . (+481). . Chgarcia (Talk | contribs)
     08:03 (cur | prev) . . (+113). . Chgarcia (Talk | contribs)
     14:14  Diamond Target Meetings‎‎ (2 changes | history) . . (+111). . [Grames‎ (2×)]
     14:14 (cur | prev) . . (-1). . Grames (Talk | contribs)
     14:14 (cur | prev) . . (+112). . Grames (Talk | contribs)
N    08:25  2021-04-07‎‎ (5 changes | history) . . (+1,810). . [Michaelm‎ (5×)]
     08:25 (cur | prev) . . (+15). . Michaelm (Talk | contribs) (Reports on Open Action Items:)
     07:55 (cur | prev) . . (+65). . Michaelm (Talk | contribs) (New items for discussion:)
     07:55 (cur | prev) . . (+120). . Michaelm (Talk | contribs) (New items for discussion:)
     07:51 (cur | prev) . . (+233). . Michaelm (Talk | contribs) (New items for discussion:)
N    07:48 (cur | prev) . . (+1,377). . Michaelm (Talk | contribs) (Created page with "== Meeting Information == ==== Connecting ==== To connect to the meeting, please do the following: Time: Wednesday at 9:00 AM EST. # To join via a Web Browser, go to the pag...")
     07:58  CIS Student Presentations‎ (diff | hist) . . (+136). . Chgarcia (Talk | contribs)
     07:45  Meeting minutes‎ (diff | hist) . . (+24). . Michaelm (Talk | contribs) (Experimental Meetings)

6 April 2021

     18:02  CIS Phase 1 work plans‎‎ (6 changes | history) . . (-1,799). . [Moser‎ (6×)]
     18:02 (cur | prev) . . (+4). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     17:46 (cur | prev) . . (-1,921). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     16:35 (cur | prev) . . (-63). . Moser (Talk | contribs) (Week 28 (Apr 12 - Apr 16))
     16:22 (cur | prev) . . (+96). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     16:19 (cur | prev) . . (+122). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     15:48 (cur | prev) . . (-37). . Moser (Talk | contribs) (Week 27 (Apr 5 - Apr 9))
     17:46  Phase 1 - HCO & Commissioning‎‎ (7 changes | history) . . (+3). . [Moser‎ (7×)]
     17:46 (cur | prev) . . (-10). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:58 (cur | prev) . . (+26). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:53 (cur | prev) . . (-14). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:52 (cur | prev) . . (+20). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:46 (cur | prev) . . (+18). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:44 (cur | prev) . . (0). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:44 (cur | prev) . . (-37). . Moser (Talk | contribs) (System Readiness / HCO Schedule (April '21))
     16:06  Spring 2021 - Rebuilding Photogun‎‎ (2 changes | history) . . (+17). . [Grames‎ (2×)]
     16:06 (cur | prev) . . (-71). . Grames (Talk | contribs)
     16:06 (cur | prev) . . (+88). . Grames (Talk | contribs)
     15:26 (Upload log). . [Chgarcia‎ (3×)]
     15:26 . . Chgarcia (Talk | contribs) uploaded File:Vertical & Horizontal Wien assembly procedure Rev01 April 6 2021.docx
     15:02 . . Chgarcia (Talk | contribs) uploaded File:H-Wien S&A 020921.xlsx
     15:02 . . Chgarcia (Talk | contribs) uploaded File:H-Wien S&A 02-12-2021.xlsx
     15:26  WF Wien Filters (200 kV upgrade)‎ (diff | hist) . . (+26). . Chgarcia (Talk | contribs) (200 keV Wien Assembly)
     15:01  AIPINJ - S&A Transmittals‎ (diff | hist) . . (+209). . Chgarcia (Talk | contribs)
     14:33  CIS Refereed Publications‎ (diff | hist) . . (+15). . Poelker (Talk | contribs)
     11:25  UITC Operations‎ (diff | hist) . . (+22). . Grames (Talk | contribs)
     11:24  UITC technical areas‎ (diff | hist) . . (-16). . Grames (Talk | contribs)