Recent changes
Track the most recent changes to the wiki on this page.
24 February 2021
18:15 | AIPINJ - Layouts (4 changes | history) . . (+355) . . [Moser; Grames (3×)] | |
18:15 (cur | prev) . . (+139) . . Moser (Talk | contribs) (→Injector quick reference drawing) | ||
13:52 (cur | prev) . . (0) . . Grames (Talk | contribs) | ||
13:51 (cur | prev) . . (-2) . . Grames (Talk | contribs) | ||
13:51 (cur | prev) . . (+218) . . Grames (Talk | contribs) |
18:13 | (Upload log) . . [Moser; Grames (6×)] | |
18:13 . . Moser (Talk | contribs) uploaded File:12GeV injector quick reference rev17 DRAFT-1.pdf | ||
13:52 . . Grames (Talk | contribs) uploaded File:210223 ACC0002845-0001, INJECTOR, REV C.pdf | ||
13:40 . . Grames (Talk | contribs) uploaded File:210224 BW-P3.pdf | ||
09:22 . . Grames (Talk | contribs) uploaded File:PhD Adeyemi.pdf | ||
09:22 . . Grames (Talk | contribs) uploaded File:PhD Dumas.pdf | ||
09:21 . . Grames (Talk | contribs) uploaded File:PhD Golge.pdf | ||
05:26 . . Grames (Talk | contribs) uploaded File:210224 magnetization.pptx |
15:14 | CIS Phase 1 work plans (3 changes | history) . . (+322) . . [Moser (3×)] | |
15:14 (cur | prev) . . (+142) . . Moser (Talk | contribs) (→Week 22 (Mar 1- Mar 5)) | ||
15:11 (cur | prev) . . (-22) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
15:09 (cur | prev) . . (+202) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) |
13:40 | PPB - Feb 24, 2021 (7 changes | history) . . (-155) . . [Grames (7×)] | |
13:40 (cur | prev) . . (+6) . . Grames (Talk | contribs) | ||
09:24 (cur | prev) . . (-12) . . Grames (Talk | contribs) | ||
09:23 (cur | prev) . . (+29) . . Grames (Talk | contribs) | ||
09:13 (cur | prev) . . (+169) . . Grames (Talk | contribs) | ||
09:11 (cur | prev) . . (+1) . . Grames (Talk | contribs) | ||
09:10 (cur | prev) . . (-423) . . Grames (Talk | contribs) | ||
05:26 (cur | prev) . . (+75) . . Grames (Talk | contribs) |
09:22 | PPB References and Links (3 changes | history) . . (+249) . . [Grames (3×)] | |
09:22 (cur | prev) . . (+4) . . Grames (Talk | contribs) | ||
09:21 (cur | prev) . . (+226) . . Grames (Talk | contribs) | ||
09:18 (cur | prev) . . (+19) . . Grames (Talk | contribs) |
08:51 | 2021-02-24 (diff | hist) . . (+7) . . Michaelm (Talk | contribs) (→Meeting Information) |
23 February 2021
20:43 | PPB - Feb 24, 2021 (diff | hist) . . (+813) . . Grames (Talk | contribs) |
18:59 | CIS Phase 1 work plans (27 changes | history) . . (+6,266) . . [Moser (27×)] | |
18:59 (cur | prev) . . (+184) . . Moser (Talk | contribs) (→Week 22 (Mar 1- Mar 5)) | ||
18:43 (cur | prev) . . (+5,524) . . Moser (Talk | contribs) | ||
18:36 (cur | prev) . . (-39) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
12:22 (cur | prev) . . (-26) . . Moser (Talk | contribs) | ||
12:22 (cur | prev) . . (+22) . . Moser (Talk | contribs) | ||
12:21 (cur | prev) . . (+4) . . Moser (Talk | contribs) | ||
12:13 (cur | prev) . . (-36) . . Moser (Talk | contribs) | ||
12:12 (cur | prev) . . (+6) . . Moser (Talk | contribs) | ||
12:11 (cur | prev) . . (0) . . Moser (Talk | contribs) | ||
12:11 (cur | prev) . . (-1) . . Moser (Talk | contribs) | ||
12:11 (cur | prev) . . (+20) . . Moser (Talk | contribs) | ||
12:05 (cur | prev) . . (+1) . . Moser (Talk | contribs) | ||
12:05 (cur | prev) . . (0) . . Moser (Talk | contribs) | ||
12:05 (cur | prev) . . (-3) . . Moser (Talk | contribs) | ||
12:05 (cur | prev) . . (-3) . . Moser (Talk | contribs) | ||
12:04 (cur | prev) . . (-6) . . Moser (Talk | contribs) | ||
12:01 (cur | prev) . . (+3) . . Moser (Talk | contribs) | ||
11:58 (cur | prev) . . (+2) . . Moser (Talk | contribs) | ||
11:58 (cur | prev) . . (0) . . Moser (Talk | contribs) | ||
11:54 (cur | prev) . . (+17) . . Moser (Talk | contribs) | ||
10:30 (cur | prev) . . (+127) . . Moser (Talk | contribs) (→Week 22 (Mar 1- Mar 5)) | ||
10:28 (cur | prev) . . (0) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
10:22 (cur | prev) . . (0) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
10:21 (cur | prev) . . (+42) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
09:33 (cur | prev) . . (+371) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
09:19 (cur | prev) . . (+70) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
08:11 (cur | prev) . . (-13) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) |
18:14 | Phase 1 (diff | hist) . . (+108) . . Moser (Talk | contribs) (→ATLIS Tasks) |
N 12:49 | 2021-02-24 (4 changes | history) . . (+1,750) . . [Michaelm (4×)] | |
12:49 (cur | prev) . . (+257) . . Michaelm (Talk | contribs) (→New items for discussion:) | ||
12:47 (cur | prev) . . (+125) . . Michaelm (Talk | contribs) (→Schedule) | ||
12:45 (cur | prev) . . (+80) . . Michaelm (Talk | contribs) (→New items for discussion:) | ||
N | 09:22 (cur | prev) . . (+1,288) . . Michaelm (Talk | contribs) (Created page with "== Meeting Information == The meeting will be on ==== Connecting ==== To connect to the meeting, please do the following:Wednesday February 10, 2020 at 9:00 AM EST. # To jo...") |
11:48 | (Upload log) . . [Moser; Suleiman] | |
11:48 . . Suleiman (Talk | contribs) uploaded File:DNetoBubbleUpdate-02232021.pdf | ||
10:27 . . Moser (Talk | contribs) uploaded File:InjSB Week21.png |
11:47 | Bubble Chamber Meeting Tuesday February 23, 2021 (diff | hist) . . (+42) . . Suleiman (Talk | contribs) |
N 11:43 | Bubble Chamber Meeting Tuesday March 2, 2021 (diff | hist) . . (+302) . . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday March 2 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number: 1...") |
11:43 | Planning Meetings (diff | hist) . . (+58) . . Suleiman (Talk | contribs) |
09:19 | Meeting minutes (2 changes | history) . . (+28) . . [Michaelm (2×)] | |
09:19 (cur | prev) . . (0) . . Michaelm (Talk | contribs) | ||
09:17 (cur | prev) . . (+28) . . Michaelm (Talk | contribs) (→Meetings in 2021) |
09:09 | UITC meeting minutes (diff | hist) . . (+119) . . Michaelm (Talk | contribs) |
22 February 2021
19:29 | Phase 1 (4 changes | history) . . (+225) . . [Grames; Moser (3×)] | |
19:29 (cur | prev) . . (+133) . . Moser (Talk | contribs) (→ATLIS Tasks) | ||
19:17 (cur | prev) . . (+112) . . Moser (Talk | contribs) (→ATLIS Tasks) | ||
19:10 (cur | prev) . . (+84) . . Moser (Talk | contribs) (→ATLIS Tasks) | ||
06:48 (cur | prev) . . (-104) . . Grames (Talk | contribs) |
19:03 | CIS Phase 1 work plans (4 changes | history) . . (+164) . . [Moser (4×)] | |
19:03 (cur | prev) . . (+112) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
16:15 (cur | prev) . . (+69) . . Moser (Talk | contribs) (→Penetration Work) | ||
09:07 (cur | prev) . . (+25) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
08:12 (cur | prev) . . (-42) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) |
N 16:14 | 2/26/21 - Bi-weekly meeting (4 changes | history) . . (+1,128) . . [Grames (4×)] | |
16:14 (cur | prev) . . (+91) . . Grames (Talk | contribs) | ||
16:13 (cur | prev) . . (+12) . . Grames (Talk | contribs) | ||
16:12 (cur | prev) . . (+66) . . Grames (Talk | contribs) | ||
N | 16:11 (cur | prev) . . (+959) . . Grames (Talk | contribs) (Created page with "; To-Do list from 2/12/21 # Joe - distance flange to beam center CEBAF vs UITF # Joe - copper ladder drawings if available, cooling spec, what would have to change to get it...") |
16:14 | (Upload log) . . [Poelker (3×)] | |
16:14 . . Poelker (Talk | contribs) uploaded File:UITF ODH Assessment revision2.pdf | ||
10:19 . . Poelker (Talk | contribs) uploaded File:Max's thoughts on impact of buncher on booster GSet calibration.pdf | ||
10:18 . . Poelker (Talk | contribs) uploaded File:Max's thoughts on booster GSet calibration.pdf |
16:14 | Document-Controlled Procedures and Assessments for UITF (diff | hist) . . (+65) . . Poelker (Talk | contribs) |
16:08 | Diamond Target Meetings (diff | hist) . . (+55) . . Grames (Talk | contribs) |
N 10:18 | Max's thoughts on QCM GSet calibration (diff | hist) . . (+136) . . Poelker (Talk | contribs) (Created page with "media:Max's thoughts on booster GSet calibration.pdf media:Max's thoughts on impact of buncher on booster GSet calibration.pdf") |
10:16 | UITC meeting minutes (2 changes | history) . . (+46) . . [Poelker (2×)] | |
10:16 (cur | prev) . . (-11) . . Poelker (Talk | contribs) | ||
09:37 (cur | prev) . . (+57) . . Poelker (Talk | contribs) |
N 09:38 | Reza's thoughts on bunchlength measurement at UITF (diff | hist) . . (+1,028) . . Poelker (Talk | contribs) (Created page with "Checking the bunch length system with 200keV beam and No choppers Requirements: At minimum we need the following #- Beam through bunch length cavity #- More than 5uA tune bea...") |
08:04 | AIPINJ - Layouts (2 changes | history) . . (+106) . . [Grames; Moser] | |
08:04 (cur | prev) . . (+119) . . Moser (Talk | contribs) (→Injector quick reference drawing) | ||
07:24 (cur | prev) . . (-13) . . Grames (Talk | contribs) |
07:30 | Phase 1 - HCO & Commissioning (3 changes | history) . . (+2,371) . . [Grames (3×)] | |
07:30 (cur | prev) . . (+1) . . Grames (Talk | contribs) | ||
07:29 (cur | prev) . . (0) . . Grames (Talk | contribs) | ||
07:29 (cur | prev) . . (+2,370) . . Grames (Talk | contribs) |
19 February 2021
19:45 | CIS Phase 1 work plans (4 changes | history) . . (+548) . . [Moser (4×)] | |
19:45 (cur | prev) . . (-7) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
19:16 (cur | prev) . . (-2) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
19:15 (cur | prev) . . (+2) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
19:03 (cur | prev) . . (+555) . . Moser (Talk | contribs) |
19:38 | Phase 1 (5 changes | history) . . (+279) . . [Moser (5×)] | |
19:38 (cur | prev) . . (+151) . . Moser (Talk | contribs) (→ATLIS Tasks) | ||
18:45 (cur | prev) . . (+15) . . Moser (Talk | contribs) (→Quick Phase 1 Links) | ||
17:37 (cur | prev) . . (+1) . . Moser (Talk | contribs) (→Quick Phase 1 Links) | ||
17:37 (cur | prev) . . (+58) . . Moser (Talk | contribs) (→Quick Phase 1 Links) | ||
17:35 (cur | prev) . . (+54) . . Moser (Talk | contribs) (→Quick Phase 1 Links) |
17:33 | (Upload log) . . [Moser; Suleiman (4×)] | |
17:33 . . Moser (Talk | contribs) uploaded File:12GeV injector quick reference rev17 DRAFT-2.pdf | ||
14:42 . . Suleiman (Talk | contribs) uploaded a new version of File:SRF Electron Beam BNL.pdf | ||
14:29 . . Suleiman (Talk | contribs) uploaded a new version of File:SRF Electron Beam BNL.pdf | ||
12:54 . . Suleiman (Talk | contribs) uploaded a new version of File:SRF Electron Beam BNL.pdf | ||
10:40 . . Suleiman (Talk | contribs) uploaded a new version of File:SRF Electron Beam BNL.pdf |
N 15:24 | February 22, 2021 - I&C Installation Kickoff (5 changes | history) . . (+516) . . [Grames (5×)] | |
15:24 (cur | prev) . . (+24) . . Grames (Talk | contribs) | ||
15:23 (cur | prev) . . (+5) . . Grames (Talk | contribs) | ||
15:23 (cur | prev) . . (+4) . . Grames (Talk | contribs) | ||
15:22 (cur | prev) . . (+76) . . Grames (Talk | contribs) | ||
N | 15:20 (cur | prev) . . (+407) . . Grames (Talk | contribs) (Created page with "= Meeting Info == We will meet Monday February 22 @ 1:30 pm <u>'''via BlueJeans'''</u> Meeting URL (for video and/or audio call in): https://bluejeans.com/7572697097 Phone...") |
15:17 | AIPINJ - Upgrade Meetings (diff | hist) . . (+50) . . Grames (Talk | contribs) |
14:42 | Transmission Polarimeter Meeting - Feb 19, 2021 (diff | hist) . . (0) . . Suleiman (Talk | contribs) |
14:42 | Compton Transmission Polarimeter (3 changes | history) . . (+52) . . [Suleiman (3×)] | |
14:42 (cur | prev) . . (+5) . . Suleiman (Talk | contribs) | ||
14:39 (cur | prev) . . (+19) . . Suleiman (Talk | contribs) | ||
14:35 (cur | prev) . . (+28) . . Suleiman (Talk | contribs) |
18 February 2021
20:02 | CIS Phase 1 work plans (8 changes | history) . . (+557) . . [Moser (8×)] | |
20:02 (cur | prev) . . (+212) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
19:58 (cur | prev) . . (+1) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
19:57 (cur | prev) . . (+1) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
19:57 (cur | prev) . . (+262) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
19:52 (cur | prev) . . (+42) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) | ||
19:51 (cur | prev) . . (+29) . . Moser (Talk | contribs) (→Week 21 (Feb 22 - Feb 26)) | ||
19:49 (cur | prev) . . (-20) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) | ||
19:05 (cur | prev) . . (+30) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) |
19:40 | AIPINJ - Layouts (2 changes | history) . . (+243) . . [Grames (2×)] | |
19:40 (cur | prev) . . (-495) . . Grames (Talk | contribs) | ||
19:38 (cur | prev) . . (+738) . . Grames (Talk | contribs) |
19:39 | (Upload log) . . [Chgarcia; Grames; Poelker (5×)] | |
19:39 . . Grames (Talk | contribs) uploaded File:210218 ACC0002845-0001, INJECTOR, REV C.pdf | ||
13:44 . . Poelker (Talk | contribs) uploaded File:Max's thoughts on QCM GSet calibration.pdf | ||
13:01 . . Poelker (Talk | contribs) uploaded File:CRM1107014-0002.pdf | ||
12:32 . . Poelker (Talk | contribs) uploaded File:Chopper to booster 18Feb21.pdf | ||
12:25 . . Poelker (Talk | contribs) uploaded File:Chopper to booster layout 18Feb21.pdf | ||
11:58 . . Poelker (Talk | contribs) uploaded File:Fay's astra model of CEBAF injector.pdf | ||
10:28 . . Chgarcia (Talk | contribs) uploaded File:JLab photoguns for Kevin presented at the morning meeting Feb 18 2021.pptx |
14:23 | PPB - Feb 17, 2021 (8 changes | history) . . (+814) . . [Grames (8×)] | |
14:23 (cur | prev) . . (+114) . . Grames (Talk | contribs) | ||
14:21 (cur | prev) . . (+117) . . Grames (Talk | contribs) | ||
14:19 (cur | prev) . . (0) . . Grames (Talk | contribs) | ||
14:11 (cur | prev) . . (+102) . . Grames (Talk | contribs) | ||
14:10 (cur | prev) . . (-69) . . Grames (Talk | contribs) | ||
14:09 (cur | prev) . . (+17) . . Grames (Talk | contribs) | ||
14:07 (cur | prev) . . (+63) . . Grames (Talk | contribs) | ||
14:00 (cur | prev) . . (+470) . . Grames (Talk | contribs) |
13:43 | UITC meeting minutes (diff | hist) . . (+56) . . Poelker (Talk | contribs) |
13:28 | Injector Upgrade Documents and Links (2 changes | history) . . (+43) . . [Grames (2×)] | |
13:28 (cur | prev) . . (+6) . . Grames (Talk | contribs) | ||
13:28 (cur | prev) . . (+37) . . Grames (Talk | contribs) |
N 13:27 | Phase 1 (7 changes | history) . . (+6,486) . . [Grames (7×)] | |
13:27 (cur | prev) . . (-59) . . Grames (Talk | contribs) | ||
13:27 (cur | prev) . . (-109) . . Grames (Talk | contribs) | ||
13:25 (cur | prev) . . (+5) . . Grames (Talk | contribs) | ||
13:25 (cur | prev) . . (-55) . . Grames (Talk | contribs) | ||
11:38 (cur | prev) . . (+433) . . Grames (Talk | contribs) | ||
11:37 (cur | prev) . . (+5,904) . . Grames (Talk | contribs) | ||
N | 11:35 (cur | prev) . . (+367) . . Grames (Talk | contribs) (Created page with "== Recent Updates == * '''Schedule - updated Jan 25, 2021 w/ Preliminary Commissioning Plan to end of SAD July 2, 2021''' media:210125_AIPINJ_Schedule.pdf * '''Feb 1, 202...") |
13:00 | SRF Booster (diff | hist) . . (+91) . . Poelker (Talk | contribs) |
N 12:56 | Phase2 ME meeting minutes 18Feb21 (5 changes | history) . . (+2,376) . . [Poelker (5×)] | |
12:56 (cur | prev) . . (+113) . . Poelker (Talk | contribs) | ||
12:54 (cur | prev) . . (+2,037) . . Poelker (Talk | contribs) | ||
12:33 (cur | prev) . . (-7) . . Poelker (Talk | contribs) | ||
12:30 (cur | prev) . . (+53) . . Poelker (Talk | contribs) | ||
N | 12:29 (cur | prev) . . (+180) . . Poelker (Talk | contribs) (Created page with "Danny, Matt and Joe * Phase1 is wrapping up, baking through end of March * beamline drawing of the region between chopper2 and booster looks good, certainly more than 50% com...") |
N 12:31 | AIPINJ - Phase 2 Layouts (3 changes | history) . . (+105) . . [Poelker (3×)] | |
12:31 (cur | prev) . . (-7) . . Poelker (Talk | contribs) | ||
12:25 (cur | prev) . . (+64) . . Poelker (Talk | contribs) | ||
N | 12:23 (cur | prev) . . (+48) . . Poelker (Talk | contribs) (Created page with " ==Phase 2 - Chopper to Booster region Layouts==") |
N 12:27 | AIPINJ - Phase 2 Upgrade Meetings (diff | hist) . . (+39) . . Poelker (Talk | contribs) (Created page with "* phase2 ME meeting minutes 18Feb21") |
N 12:23 | Phase 2 (7 changes | history) . . (+208) . . [Grames; Poelker (6×)] | |
12:23 (cur | prev) . . (+8) . . Poelker (Talk | contribs) | ||
12:21 (cur | prev) . . (-71) . . Poelker (Talk | contribs) | ||
12:17 (cur | prev) . . (+36) . . Poelker (Talk | contribs) | ||
12:15 (cur | prev) . . (0) . . Poelker (Talk | contribs) | ||
12:14 (cur | prev) . . (+49) . . Poelker (Talk | contribs) | ||
12:13 (cur | prev) . . (+128) . . Poelker (Talk | contribs) | ||
N | 11:34 (cur | prev) . . (+58) . . Grames (Talk | contribs) (Created page with " == Major Phase 2 Beamline Components == :SRF Booster") |
12:03 | UITF plans for coming weeks, months plus booster optics discussion (2 changes | history) . . (+135) . . [Poelker (2×)] | |
12:03 (cur | prev) . . (+84) . . Poelker (Talk | contribs) | ||
11:57 (cur | prev) . . (+51) . . Poelker (Talk | contribs) |
11:41 | CEBAF Injector Upgrade (10 changes | history) . . (-6,572) . . [Grames (10×)] | |
11:41 (cur | prev) . . (+27) . . Grames (Talk | contribs) | ||
11:40 (cur | prev) . . (-8) . . Grames (Talk | contribs) | ||
11:40 (cur | prev) . . (+44) . . Grames (Talk | contribs) | ||
11:38 (cur | prev) . . (-433) . . Grames (Talk | contribs) | ||
11:37 (cur | prev) . . (+71) . . Grames (Talk | contribs) | ||
11:36 (cur | prev) . . (-5,903) . . Grames (Talk | contribs) | ||
11:35 (cur | prev) . . (-346) . . Grames (Talk | contribs) | ||
11:34 (cur | prev) . . (-58) . . Grames (Talk | contribs) | ||
11:33 (cur | prev) . . (+8) . . Grames (Talk | contribs) | ||
11:33 (cur | prev) . . (+26) . . Grames (Talk | contribs) |
10:28 | Historical Timeline (diff | hist) . . (+97) . . Chgarcia (Talk | contribs) |
17 February 2021
16:43 | (Upload log) . . [Poelker (5×)] | |
16:43 . . Poelker (Talk | contribs) uploaded File:UITF stripline BPM study John Musson 2 17 21.pdf | ||
16:32 . . Poelker (Talk | contribs) uploaded File:UITF talking points 2 18 2021.docx | ||
16:18 . . Poelker (Talk | contribs) uploaded File:Photogun and some beamline with dimensions.pdf | ||
12:46 . . Poelker (Talk | contribs) uploaded File:"I don't know the beam size" meeting 2 18 21.docx | ||
10:34 . . Poelker (Talk | contribs) uploaded File:Physics Division review of Andy's request for fourth run, so called run2b.pdf |
16:43 | UITC meeting minutes (5 changes | history) . . (+225) . . [Poelker (5×)] | |
16:43 (cur | prev) . . (+7) . . Poelker (Talk | contribs) | ||
16:42 (cur | prev) . . (0) . . Poelker (Talk | contribs) | ||
16:42 (cur | prev) . . (+55) . . Poelker (Talk | contribs) | ||
12:35 (cur | prev) . . (+73) . . Poelker (Talk | contribs) | ||
10:33 (cur | prev) . . (+90) . . Poelker (Talk | contribs) |
N 16:31 | UITF plans for coming weeks, months plus booster optics discussion (3 changes | history) . . (+1,126) . . [Poelker (3×)] | |
16:31 (cur | prev) . . (+33) . . Poelker (Talk | contribs) | ||
16:30 (cur | prev) . . (-49) . . Poelker (Talk | contribs) | ||
N | 12:42 (cur | prev) . . (+1,142) . . Poelker (Talk | contribs) (Created page with "UITF going forward, here's how I prioritize things. We might have till the end of March, when LHe gets diverted to CMTF so now juggling the three priorities: HDIce run4, boo...") |
16:18 | Songsheets (diff | hist) . . (+107) . . Poelker (Talk | contribs) |
10:51 | PPB - Feb 17, 2021 (3 changes | history) . . (+128) . . [Samih (3×)] | |
10:51 (cur | prev) . . (-10) . . Samih (Talk | contribs) (→Agenda) | ||
10:50 (cur | prev) . . (-1) . . Samih (Talk | contribs) (→Agenda) | ||
10:50 (cur | prev) . . (+139) . . Samih (Talk | contribs) (→Agenda) |
08:17 | CIS Phase 1 work plans (diff | hist) . . (+207) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) |
16 February 2021
17:47 | CEBAF Injector Upgrade (diff | hist) . . (+155) . . Moser (Talk | contribs) |
13:46 | PPB - Feb 17, 2021 (2 changes | history) . . (+404) . . [Grames (2×)] | |
13:46 (cur | prev) . . (+24) . . Grames (Talk | contribs) | ||
13:45 (cur | prev) . . (+380) . . Grames (Talk | contribs) |
N 11:26 | Bubble Chamber Meeting Tuesday February 23, 2021 (diff | hist) . . (+306) . . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday February 23 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone numbe...") |
11:25 | Planning Meetings (diff | hist) . . (+62) . . Suleiman (Talk | contribs) |
15 February 2021
15:25 | (Upload log) . . [Chgarcia; Moser; Poelker (3×)] | |
15:25 . . Poelker (Talk | contribs) uploaded File:Basic gain switching setup.pdf | ||
13:59 . . Moser (Talk | contribs) uploaded File:Commissioning Activities Rev1.png | ||
10:17 . . Poelker (Talk | contribs) uploaded File:Water irradiation ME drawings Shaun.pptx | ||
10:15 . . Poelker (Talk | contribs) uploaded File:Water irradiation commissioning plans poelker talk.pptx | ||
08:20 . . Chgarcia (Talk | contribs) uploaded File:Gun2 Tee electrode 200kV HV codnitoning plan 2021 draft01.pptx |
15:25 | Lasers Area (diff | hist) . . (+42) . . Poelker (Talk | contribs) |
14:00 | Phase 1 - HCO & Commissioning (4 changes | history) . . (+129) . . [Chgarcia; Moser (3×)] | |
14:00 (cur | prev) . . (+2) . . Moser (Talk | contribs) (→Beam Commissioning (May 1 - Jul 2)) | ||
13:58 (cur | prev) . . (-719) . . Moser (Talk | contribs) (→Beam Commissioning (May 1 - Jul 2)) | ||
13:57 (cur | prev) . . (+771) . . Moser (Talk | contribs) (→Beam Commissioning (May 1 - Jul 2)) | ||
08:20 (cur | prev) . . (+75) . . Chgarcia (Talk | contribs) (→Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30)) |
11:03 | GTS meeting 2 02 21 (5 changes | history) . . (+167) . . [Suleiman (5×)] | |
11:03 (cur | prev) . . (+1) . . Suleiman (Talk | contribs) | ||
11:03 (cur | prev) . . (+3) . . Suleiman (Talk | contribs) | ||
11:02 (cur | prev) . . (+1) . . Suleiman (Talk | contribs) | ||
11:02 (cur | prev) . . (+3) . . Suleiman (Talk | contribs) | ||
11:01 (cur | prev) . . (+159) . . Suleiman (Talk | contribs) |
N 10:17 | February 15, 2021 Experimental Readiness Review (2 changes | history) . . (+153) . . [Poelker (2×)] | |
10:17 (cur | prev) . . (+52) . . Poelker (Talk | contribs) | ||
N | 10:15 (cur | prev) . . (+101) . . Poelker (Talk | contribs) (Created page with "https://indico.jlab.org/event/431/ media:water irradiation commissioning plans_poelker talk.pptx") |
N 10:15 | Reviews (3 changes | history) . . (+52) . . [Poelker (3×)] | |
10:15 (cur | prev) . . (-35) . . Poelker (Talk | contribs) | ||
10:14 (cur | prev) . . (+5) . . Poelker (Talk | contribs) | ||
N | 10:13 (cur | prev) . . (+82) . . Poelker (Talk | contribs) (Created page with "February 15, 2021 Experimental Readiness Review https://indico.jlab.org/event/431/") |
08:07 | Compton Transmission Polarimeter (2 changes | history) . . (+307) . . [Suleiman (2×)] | |
08:07 (cur | prev) . . (0) . . Suleiman (Talk | contribs) | ||
08:05 (cur | prev) . . (+307) . . Suleiman (Talk | contribs) |
13 February 2021
15:39 | (Upload log) . . [Grames (4×); Suleiman (4×)] | |
15:39 . . Grames (Talk | contribs) uploaded File:BW-P3.pptx | ||
15:26 . . Grames (Talk | contribs) uploaded File:210209 ion pump names.xlsx | ||
14:41 . . Grames (Talk | contribs) uploaded File:210212 cebaf drive laser table corner .pdf | ||
11:13 . . Grames (Talk | contribs) uploaded File:210212 Polarimetry Notes & Log.pdf | ||
10:35 . . Suleiman (Talk | contribs) uploaded a new version of File:CompTransPolarimeter.pdf | ||
10:34 . . Suleiman (Talk | contribs) uploaded a new version of File:CompTransPolarimeter.pdf | ||
10:33 . . Suleiman (Talk | contribs) uploaded a new version of File:CompTransPolarimeter.pdf | ||
10:31 . . Suleiman (Talk | contribs) uploaded File:SRF Electron Beam BNL.pdf |
N 15:39 | PPB - Feb 24, 2021 (2 changes | history) . . (+377) . . [Grames (2×)] | |
15:39 (cur | prev) . . (+21) . . Grames (Talk | contribs) | ||
N | 15:33 (cur | prev) . . (+356) . . Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed (Mexico 9am, US 11am, France 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda Feb 24, 2021==...") |
15:32 | PPB Meetings (diff | hist) . . (+24) . . Grames (Talk | contribs) |
15:25 | Phase 1 - HCO & Commissioning (6 changes | history) . . (+331) . . [Grames (6×)] | |
15:25 (cur | prev) . . (+37) . . Grames (Talk | contribs) | ||
14:13 (cur | prev) . . (+25) . . Grames (Talk | contribs) | ||
14:12 (cur | prev) . . (+97) . . Grames (Talk | contribs) | ||
14:12 (cur | prev) . . (+49) . . Grames (Talk | contribs) | ||
14:11 (cur | prev) . . (+35) . . Grames (Talk | contribs) | ||
13:56 (cur | prev) . . (+88) . . Grames (Talk | contribs) |
14:50 | February 12, 2021 - PQB/RTP meeting with UVa (6 changes | history) . . (+2,910) . . [Grames (6×)] | |
14:50 (cur | prev) . . (+8) . . Grames (Talk | contribs) | ||
14:49 (cur | prev) . . (+606) . . Grames (Talk | contribs) | ||
14:41 (cur | prev) . . (+60) . . Grames (Talk | contribs) | ||
14:39 (cur | prev) . . (+1,198) . . Grames (Talk | contribs) | ||
14:36 (cur | prev) . . (+678) . . Grames (Talk | contribs) | ||
14:34 (cur | prev) . . (+360) . . Grames (Talk | contribs) |
13:59 | AIPINJ - Phase 1 and 2 Schedule (2 changes | history) . . (+104) . . [Grames (2×)] | |
13:59 (cur | prev) . . (0) . . Grames (Talk | contribs) | ||
13:58 (cur | prev) . . (+104) . . Grames (Talk | contribs) |
N 11:13 | Diamond Target Meetings (diff | hist) . . (+88) . . Grames (Talk | contribs) (Created page with " * 2/12/21 - Diamond Target Kickoff Meeting [[media:210212_Polarimetry Notes & Log.pdf]]") |
N 11:11 | Diamond Target Experiment (diff | hist) . . (+27) . . Grames (Talk | contribs) (Created page with "Diamond Target Meetings") |
N 10:56 | Transmission Polarimeter Meeting - Feb 19, 2021 (6 changes | history) . . (+270) . . [Suleiman (6×)] | |
10:56 (cur | prev) . . (+1) . . Suleiman (Talk | contribs) | ||
10:56 (cur | prev) . . (+3) . . Suleiman (Talk | contribs) | ||
10:51 (cur | prev) . . (+1) . . Suleiman (Talk | contribs) | ||
10:51 (cur | prev) . . (+1) . . Suleiman (Talk | contribs) | ||
10:51 (cur | prev) . . (+186) . . Suleiman (Talk | contribs) | ||
N | 10:30 (cur | prev) . . (+78) . . Suleiman (Talk | contribs) (Created page with "* Electron Beam Properties of BNL SRF Gun: media:SRF_Electron_Beam_BNL.pdf") |
N 10:55 | Transmission Polarimeter Meeting - Oct 30, 2020 (2 changes | history) . . (+349) . . [Suleiman (2×)] | |
10:55 (cur | prev) . . (+263) . . Suleiman (Talk | contribs) | ||
N | 10:54 (cur | prev) . . (+86) . . Suleiman (Talk | contribs) (Created page with "* Compton Transmission Polarimeter for BNL SRF Gun: media:CompTransPolarimeter.pdf") |
N 10:54 | Compton Transmission Polarimeter Meetings (5 changes | history) . . (+186) . . [Suleiman (5×)] | |
10:54 (cur | prev) . . (-90) . . Suleiman (Talk | contribs) | ||
10:53 (cur | prev) . . (+90) . . Suleiman (Talk | contribs) | ||
10:29 (cur | prev) . . (0) . . Suleiman (Talk | contribs) | ||
10:24 (cur | prev) . . (+72) . . Suleiman (Talk | contribs) | ||
N | 10:22 (cur | prev) . . (+114) . . Suleiman (Talk | contribs) (Created page with "* Transmission Polarimeter Meeting - Feb 19, 2021 - * Transmission Polarimeter Meeting - Dec 16, 2020 -") |
N 10:53 | Transmission Polarimeter Meeting - Oct 27, 2020 (2 changes | history) . . (0) . . [Suleiman (2×)] | |
10:53 (cur | prev) . . (-86) . . Suleiman (Talk | contribs) (Blanked the page) | ||
N | 10:32 (cur | prev) . . (+86) . . Suleiman (Talk | contribs) (Created page with "* Compton Transmission Polarimeter for BNL SRF Gun: media:CompTransPolarimeter.pdf") |
10:52 | CEBAF MeV Mott Polarimeter (diff | hist) . . (+76) . . Grames (Talk | contribs) |
10:44 | Compton Transmission Polarimeter (4 changes | history) . . (+242) . . [Suleiman (4×)] | |
10:44 (cur | prev) . . (+3) . . Suleiman (Talk | contribs) | ||
10:41 (cur | prev) . . (+10) . . Suleiman (Talk | contribs) | ||
10:19 (cur | prev) . . (-1) . . Suleiman (Talk | contribs) | ||
10:19 (cur | prev) . . (+230) . . Suleiman (Talk | contribs) |
12 February 2021
16:43 | CIS Phase 1 work plans (7 changes | history) . . (+961) . . [Moser (7×)] | |
16:43 (cur | prev) . . (-1) . . Moser (Talk | contribs) | ||
16:42 (cur | prev) . . (0) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) | ||
16:40 (cur | prev) . . (+150) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) | ||
16:25 (cur | prev) . . (+26) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) | ||
16:23 (cur | prev) . . (-1) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) | ||
16:23 (cur | prev) . . (+1) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) | ||
16:23 (cur | prev) . . (+786) . . Moser (Talk | contribs) |
16:42 | (Upload log) . . [Moser; Sajini] | |
16:42 . . Moser (Talk | contribs) uploaded File:InjSB Week20.png | ||
13:05 . . Sajini (Talk | contribs) uploaded File:Making holes in the electrode back end.pptx |
13:04 | Publications and Research Presentations (diff | hist) . . (+98) . . Sajini (Talk | contribs) |
11 February 2021
16:23 | (Upload log) . . [Grames (2×)] | |
16:23 . . Grames (Talk | contribs) uploaded File:Joe's slides describing UITF 210211 160317 UITF OpsReview Grames Redux.pptx | ||
08:28 . . Grames (Talk | contribs) uploaded File:210210 HallD CollaborationMeeting.pptx |
16:23 | UITC meeting minutes (diff | hist) . . (+88) . . Grames (Talk | contribs) |
09:02 | CIS Phase 1 work plans (4 changes | history) . . (-117) . . [Moser (4×)] | |
09:02 (cur | prev) . . (+3) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
08:59 (cur | prev) . . (-33) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
08:28 (cur | prev) . . (-65) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
08:28 (cur | prev) . . (-22) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) |
08:49 | Phase 1 - HCO & Commissioning (diff | hist) . . (+32) . . Grames (Talk | contribs) |
N 08:33 | February 12, 2021 - PQB/RTP meeting with UVa (3 changes | history) . . (+623) . . [Grames (3×)] | |
08:33 (cur | prev) . . (+48) . . Grames (Talk | contribs) | ||
08:30 (cur | prev) . . (+24) . . Grames (Talk | contribs) | ||
N | 08:27 (cur | prev) . . (+551) . . Grames (Talk | contribs) (Created page with "= Meeting Info == We will meet Friday Feb 12 @ 2pm <u>'''via BlueJeans'''</u> Meeting URL (for video and/or audio call in): https://bluejeans.com/7572697097 Phone number (f...") |
08:22 | AIPINJ - Upgrade Meetings (diff | hist) . . (+50) . . Grames (Talk | contribs) |
10 February 2021
16:54 | CIS Phase 1 work plans (11 changes | history) . . (+438) . . [Moser (11×)] | |
16:54 (cur | prev) . . (+6) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
16:52 (cur | prev) . . (+35) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
10:11 (cur | prev) . . (+38) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
10:10 (cur | prev) . . (+56) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
10:08 (cur | prev) . . (-14) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
10:07 (cur | prev) . . (+4) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
10:07 (cur | prev) . . (+36) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
10:06 (cur | prev) . . (-5) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) | ||
10:05 (cur | prev) . . (+231) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
08:04 (cur | prev) . . (+34) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
08:03 (cur | prev) . . (+17) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) |
11:00 | (Upload log) . . Grames (Talk | contribs) uploaded File:Bunchlengt10-02-21.pptx |
11:00 | PPB - Feb 10, 2021 (2 changes | history) . . (+126) . . [Grames; Samih] | |
11:00 (cur | prev) . . (+34) . . Grames (Talk | contribs) | ||
10:55 (cur | prev) . . (+92) . . Samih (Talk | contribs) (→Agenda Feb 10, 2021) |
N 09:21 | Phase 1 - HCO & Commissioning (11 changes | history) . . (+3,850) . . [Grames (11×)] | |
09:21 (cur | prev) . . (+128) . . Grames (Talk | contribs) | ||
09:19 (cur | prev) . . (+6) . . Grames (Talk | contribs) | ||
09:18 (cur | prev) . . (+7) . . Grames (Talk | contribs) | ||
09:18 (cur | prev) . . (+259) . . Grames (Talk | contribs) | ||
08:58 (cur | prev) . . (+226) . . Grames (Talk | contribs) | ||
08:52 (cur | prev) . . (+168) . . Grames (Talk | contribs) | ||
08:49 (cur | prev) . . (+46) . . Grames (Talk | contribs) | ||
08:44 (cur | prev) . . (+309) . . Grames (Talk | contribs) | ||
05:53 (cur | prev) . . (+950) . . Grames (Talk | contribs) (→Jobs Leading to HCO & Commissioning) | ||
05:38 (cur | prev) . . (+543) . . Grames (Talk | contribs) | ||
N | 05:30 (cur | prev) . . (+1,208) . . Grames (Talk | contribs) (Created page with "==Jobs Leading to HCO & Commissioning == ; 15 deg dipole (MDR) * Install on beam line after bake out, then align, do we use shims? * Current sensor for HV interlock installe...") |
N 08:56 | 2021-02-10 (3 changes | history) . . (+1,533) . . [Michaelm (3×)] | |
08:56 (cur | prev) . . (+34) . . Michaelm (Talk | contribs) (→New items for discussion:) | ||
00:15 (cur | prev) . . (+638) . . Michaelm (Talk | contribs) (→Agenda) | ||
N | 00:03 (cur | prev) . . (+861) . . Michaelm (Talk | contribs) (Created page with "== Meeting Information == The meeting will be on ==== Connecting ==== To connect to the meeting, please do the following:Wednesday February 10, 2020 at 9:00 AM EST. # To jo...") |
05:10 | CEBAF Injector Upgrade (diff | hist) . . (+36) . . Grames (Talk | contribs) (→Planning, planning, planning...) |
N 00:08 | 2021-01-27 (diff | hist) . . (+1,464) . . Michaelm (Talk | contribs) (Created page with "== Meeting Information ==The meeting will be on Thursday January 27, 2020 at 9:00 AM EST. ==== Connecting ==== To connect to the meeting, please do the following: # To join...") |
00:07 | Meeting minutes (2 changes | history) . . (+28) . . [Michaelm (2×)] | |
00:07 (cur | prev) . . (0) . . Michaelm (Talk | contribs) (→Meeting Agendas and Notes) | ||
00:01 (cur | prev) . . (+28) . . Michaelm (Talk | contribs) (→Meeting Agendas and Notes) |
00:06 | 2021-01-26 (diff | hist) . . (-1) . . Michaelm (Talk | contribs) (→Meeting Information) |
00:04 | 2021-02-03 (diff | hist) . . (+1) . . Michaelm (Talk | contribs) (→Meeting Information) |
9 February 2021
20:54 | CIS Phase 1 work plans (3 changes | history) . . (+36) . . [Moser (3×)] | |
20:54 (cur | prev) . . (+16) . . Moser (Talk | contribs) (→Week 20 (Feb 15 - Feb 19)) | ||
19:06 (cur | prev) . . (+33) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
19:04 (cur | prev) . . (-13) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) |
15:48 | PPB - Feb 10, 2021 (5 changes | history) . . (+191) . . [Grames (5×)] | |
15:48 (cur | prev) . . (+1) . . Grames (Talk | contribs) | ||
15:47 (cur | prev) . . (-9) . . Grames (Talk | contribs) | ||
15:47 (cur | prev) . . (+31) . . Grames (Talk | contribs) | ||
15:46 (cur | prev) . . (+47) . . Grames (Talk | contribs) | ||
15:45 (cur | prev) . . (+121) . . Grames (Talk | contribs) |
14:11 | CIS Refereed Publications (diff | hist) . . (+233) . . Poelker (Talk | contribs) |
N 11:29 | Bubble Chamber Meeting Tuesday February 16, 2021 (diff | hist) . . (+306) . . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday February 16 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone numbe...") |
11:28 | Planning Meetings (diff | hist) . . (+62) . . Suleiman (Talk | contribs) |
8 February 2021
21:16 | (Upload log) . . Sajini (Talk | contribs) uploaded File:Photocathode position.pdf |
21:16 | Publications and Research Presentations (diff | hist) . . (+115) . . Sajini (Talk | contribs) |
18:28 | CIS Phase 1 work plans (9 changes | history) . . (+862) . . [Moser (9×)] | |
18:28 (cur | prev) . . (+74) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
18:26 (cur | prev) . . (+1) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
18:26 (cur | prev) . . (+55) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
12:13 (cur | prev) . . (+112) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
12:09 (cur | prev) . . (+83) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
12:05 (cur | prev) . . (+465) . . Moser (Talk | contribs) | ||
11:49 (cur | prev) . . (+13) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
08:29 (cur | prev) . . (+46) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
08:29 (cur | prev) . . (+13) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) |
5 February 2021
09:38 | CIS Phase 1 work plans (diff | hist) . . (-40) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) |
4 February 2021
13:02 | (Upload log) . . [Poelker; Chgarcia (3×)] | |
13:02 . . Poelker (Talk | contribs) uploaded File:Andy's request for run2b.pdf | ||
07:51 . . Chgarcia (Talk | contribs) uploaded File:Wien maps.png | ||
07:51 . . Chgarcia (Talk | contribs) uploaded File:MWF1I06.txt | ||
07:50 . . Chgarcia (Talk | contribs) uploaded File:MWF1I04.txt |
13:01 | UITC meeting minutes (diff | hist) . . (+41) . . Poelker (Talk | contribs) |
09:42 | February 3, 2021 - Weekly ME meeting (2 changes | history) . . (+310) . . [Grames (2×)] | |
09:42 (cur | prev) . . (+21) . . Grames (Talk | contribs) | ||
09:42 (cur | prev) . . (+289) . . Grames (Talk | contribs) |
09:34 | CIS Phase 1 work plans (3 changes | history) . . (-154) . . [Moser (3×)] | |
09:34 (cur | prev) . . (-209) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
09:33 (cur | prev) . . (0) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
09:33 (cur | prev) . . (+55) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) |
07:50 | WF Wien Filters (200 kV upgrade) (diff | hist) . . (+74) . . Chgarcia (Talk | contribs) |
3 February 2021
18:55 | CIS Phase 1 work plans (12 changes | history) . . (+666) . . [Moser (12×)] | |
18:55 (cur | prev) . . (+61) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
16:14 (cur | prev) . . (+78) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
16:13 (cur | prev) . . (0) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
16:10 (cur | prev) . . (+166) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
09:59 (cur | prev) . . (+74) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
09:57 (cur | prev) . . (-137) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
09:54 (cur | prev) . . (-1) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
09:50 (cur | prev) . . (+20) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
09:49 (cur | prev) . . (-28) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
09:29 (cur | prev) . . (+67) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
09:05 (cur | prev) . . (+277) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
08:28 (cur | prev) . . (+89) . . Moser (Talk | contribs) (→Fire System Work) |
N 17:36 | February 3, 2021 - Weekly ME meeting (3 changes | history) . . (+3,205) . . [Grames (3×)] | |
17:36 (cur | prev) . . (+16) . . Grames (Talk | contribs) | ||
17:33 (cur | prev) . . (0) . . Grames (Talk | contribs) | ||
N | 17:33 (cur | prev) . . (+3,189) . . Grames (Talk | contribs) (Created page with "= Meeting Info == == Meeting Feb 3, 2021 == * Air cylinder / viewer parts status * PSS kicker status * QW status == Meeting January 28, 2021 == Here's my Phase 1 punch list...") |
17:32 | AIPINJ - Upgrade Meetings (diff | hist) . . (+42) . . Grames (Talk | contribs) |
17:30 | (Upload log) . . [Grames; Samih; Moser (2×); Suleiman (3×)] | |
17:30 . . Grames (Talk | contribs) uploaded File:210126 QW workplan.docx | ||
16:13 . . Moser (Talk | contribs) uploaded File:InjSB Week19.png | ||
10:32 . . Samih (Talk | contribs) uploaded File:Thikness optimization.pptx | ||
09:53 . . Moser (Talk | contribs) uploaded File:InjSB Week18.png | ||
08:12 . . Suleiman (Talk | contribs) uploaded File:Magbeam Gaussian xy C.txt | ||
08:12 . . Suleiman (Talk | contribs) uploaded a new version of File:Magbeam Gaussian corel.gif | ||
08:11 . . Suleiman (Talk | contribs) uploaded File:Magbeam Gaussian corel.gif |
N 14:08 | PPB - Feb 10, 2021 (diff | hist) . . (+333) . . Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed (Mexico 9am, US 11am, France 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda== ;Action items...") |
14:01 | PPB Meetings (diff | hist) . . (+24) . . Grames (Talk | contribs) |
10:35 | PPB - Feb 3, 2021 (11 changes | history) . . (+722) . . [Samih (4×); Suleiman (7×)] | |
10:35 (cur | prev) . . (-1) . . Samih (Talk | contribs) (→Agenda) | ||
10:34 (cur | prev) . . (0) . . Samih (Talk | contribs) (→Agenda) | ||
10:34 (cur | prev) . . (+2) . . Samih (Talk | contribs) (→Agenda) | ||
10:33 (cur | prev) . . (+150) . . Samih (Talk | contribs) (→Agenda) | ||
08:16 (cur | prev) . . (+11) . . Suleiman (Talk | contribs) | ||
08:05 (cur | prev) . . (+26) . . Suleiman (Talk | contribs) | ||
08:04 (cur | prev) . . (+298) . . Suleiman (Talk | contribs) | ||
07:56 (cur | prev) . . (+1) . . Suleiman (Talk | contribs) | ||
07:56 (cur | prev) . . (+138) . . Suleiman (Talk | contribs) | ||
07:54 (cur | prev) . . (+4) . . Suleiman (Talk | contribs) | ||
07:54 (cur | prev) . . (+93) . . Suleiman (Talk | contribs) |
2 February 2021
N 19:20 | PPB - Feb 3, 2021 (3 changes | history) . . (+489) . . [Grames (3×)] | |
19:20 (cur | prev) . . (+24) . . Grames (Talk | contribs) | ||
19:15 (cur | prev) . . (-11) . . Grames (Talk | contribs) | ||
N | 19:14 (cur | prev) . . (+476) . . Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed (Mexico 9am, US 11am, France 5pm) Bluejeans: https://bluejeans.com/164307983 Code to start the meeting 2864 ==Agenda== ;Joe - update...") |
19:07 | PPB Meetings (diff | hist) . . (+23) . . Grames (Talk | contribs) |
18:49 | CIS Phase 1 work plans (5 changes | history) . . (+824) . . [Moser (5×)] | |
18:49 (cur | prev) . . (+273) . . Moser (Talk | contribs) | ||
18:47 (cur | prev) . . (+98) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
18:29 (cur | prev) . . (+72) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
09:09 (cur | prev) . . (+35) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
09:03 (cur | prev) . . (+346) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) |
15:14 | (Upload log) . . [Poelker; Chgarcia (4×)] | |
15:14 . . Chgarcia (Talk | contribs) uploaded File:H-Wien FieldMap data.xlsx | ||
15:14 . . Chgarcia (Talk | contribs) uploaded File:H-Wien FieldMap Analysis.pptx | ||
15:13 . . Chgarcia (Talk | contribs) uploaded File:V-Wien FieldMap data.xlsx | ||
15:12 . . Chgarcia (Talk | contribs) uploaded File:V-Wien FieldMap Analysis.pptx | ||
13:02 . . Poelker (Talk | contribs) uploaded File:Marcy's molflo simulations imagining a beamline accident at HDIce.pptx |
15:14 | WF Wien Filters (200 kV upgrade) (4 changes | history) . . (+194) . . [Chgarcia (4×)] | |
15:14 (cur | prev) . . (+38) . . Chgarcia (Talk | contribs) | ||
15:13 (cur | prev) . . (+42) . . Chgarcia (Talk | contribs) | ||
15:12 (cur | prev) . . (+38) . . Chgarcia (Talk | contribs) | ||
15:11 (cur | prev) . . (+76) . . Chgarcia (Talk | contribs) |
13:02 | UITC meeting minutes (3 changes | history) . . (+198) . . [Poelker (3×)] | |
13:02 (cur | prev) . . (+84) . . Poelker (Talk | contribs) | ||
12:23 (cur | prev) . . (+30) . . Poelker (Talk | contribs) | ||
12:22 (cur | prev) . . (+84) . . Poelker (Talk | contribs) |
N 11:38 | Bubble Chamber Meeting Tuesday February 9, 2021 (diff | hist) . . (+305) . . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday February 9 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number...") |
N 11:38 | Bubble Chamber Meeting Tuesday February 2, 2021 (diff | hist) . . (+305) . . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday February 2 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number...") |
11:37 | Planning Meetings (diff | hist) . . (+121) . . Suleiman (Talk | contribs) |
08:16 | GTS meeting 2 02 21 (diff | hist) . . (-4) . . Suleiman (Talk | contribs) |
1 February 2021
13:01 | CIS Phase 1 work plans (4 changes | history) . . (+795) . . [Moser (4×)] | |
13:01 (cur | prev) . . (+144) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
13:00 (cur | prev) . . (+152) . . Moser (Talk | contribs) (→Week 19 (Feb 8 - Feb 12)) | ||
12:53 (cur | prev) . . (+343) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
09:45 (cur | prev) . . (+156) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) |
10:38 | GTS meeting 2 02 21 (6 changes | history) . . (+237) . . [Suleiman (6×)] | |
10:38 (cur | prev) . . (+143) . . Suleiman (Talk | contribs) | ||
09:59 (cur | prev) . . (+21) . . Suleiman (Talk | contribs) | ||
09:38 (cur | prev) . . (0) . . Suleiman (Talk | contribs) | ||
09:25 (cur | prev) . . (+38) . . Suleiman (Talk | contribs) | ||
09:04 (cur | prev) . . (+31) . . Suleiman (Talk | contribs) | ||
09:02 (cur | prev) . . (+4) . . Suleiman (Talk | contribs) |
09:58 | CEBAF Injector Upgrade (3 changes | history) . . (+43) . . [Grames (3×)] | |
09:58 (cur | prev) . . (+6) . . Grames (Talk | contribs) | ||
09:58 (cur | prev) . . (+119) . . Grames (Talk | contribs) | ||
09:55 (cur | prev) . . (-82) . . Grames (Talk | contribs) |
09:57 | (Upload log) . . Grames (Talk | contribs) uploaded File:210201 PRELIMINARY ACC0002845-0001, INJECTOR, REV C .pdf |
09:57 | AIPINJ - Layouts (diff | hist) . . (+139) . . Grames (Talk | contribs) |
29 January 2021
18:28 | CIS Phase 1 work plans (6 changes | history) . . (+300) . . [Moser (6×)] | |
18:28 (cur | prev) . . (+183) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
18:17 (cur | prev) . . (+13) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
09:20 (cur | prev) . . (+80) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
08:23 (cur | prev) . . (+1) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
08:18 (cur | prev) . . (+24) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
08:17 (cur | prev) . . (-1) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) |
15:06 | January 25, 2021 - Weekly Commissioning Meetings (2 changes | history) . . (+71) . . [Grames (2×)] | |
15:06 (cur | prev) . . (+1) . . Grames (Talk | contribs) | ||
15:05 (cur | prev) . . (+70) . . Grames (Talk | contribs) |
15:05 | (Upload log) . . Grames (Talk | contribs) uploaded File:210129 JoesComments Followup.docx |
11:28 | GTS meeting 2 02 21 (diff | hist) . . (+7) . . Suleiman (Talk | contribs) |
11:20 | Gun Test Stand Meeting Minutes and To-Do Lists (diff | hist) . . (+11) . . Suleiman (Talk | contribs) |
28 January 2021
20:04 | CIS Phase 1 work plans (8 changes | history) . . (+531) . . [Moser (8×)] | |
20:04 (cur | prev) . . (+184) . . Moser (Talk | contribs) | ||
20:00 (cur | prev) . . (-39) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
10:48 (cur | prev) . . (+38) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
10:48 (cur | prev) . . (+71) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
10:45 (cur | prev) . . (+182) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
09:31 (cur | prev) . . (+58) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
08:28 (cur | prev) . . (-27) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
08:24 (cur | prev) . . (+64) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) |
N 10:03 | January 28, 2021 - Weekly ME meeting (6 changes | history) . . (+10,577) . . [Grames (6×)] | |
10:03 (cur | prev) . . (-62) . . Grames (Talk | contribs) | ||
10:02 (cur | prev) . . (+10) . . Grames (Talk | contribs) | ||
09:58 (cur | prev) . . (+10) . . Grames (Talk | contribs) | ||
09:58 (cur | prev) . . (+816) . . Grames (Talk | contribs) | ||
09:51 (cur | prev) . . (-16) . . Grames (Talk | contribs) | ||
N | 09:49 (cur | prev) . . (+9,819) . . Grames (Talk | contribs) (Created page with "= Meeting Info == We will meet Thursday @ 10am EDT <u>'''via BlueJeans'''</u> Meeting URL (for video and/or audio call in): https://bluejeans.com/909497334 Phone number (fo...") |
09:48 | AIPINJ - Upgrade Meetings (diff | hist) . . (+42) . . Grames (Talk | contribs) |
27 January 2021
19:14 | CIS Phase 1 work plans (4 changes | history) . . (+957) . . [Moser (4×)] | |
19:14 (cur | prev) . . (+787) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
19:09 (cur | prev) . . (+163) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) | ||
19:04 (cur | prev) . . (+31) . . Moser (Talk | contribs) (→Week 18 (Feb 1 - Feb 5)) | ||
18:48 (cur | prev) . . (-24) . . Moser (Talk | contribs) (→Week 17 (Jan 25 - Jan 29)) |
N 17:49 | GTS meeting 2 02 21 (6 changes | history) . . (+349) . . [Suleiman (6×)] | |
17:49 (cur | prev) . . (+16) . . Suleiman (Talk | contribs) | ||
17:48 (cur | prev) . . (-88) . . Suleiman (Talk | contribs) | ||
17:46 (cur | prev) . . (+167) . . Suleiman (Talk | contribs) | ||
17:43 (cur | prev) . . (+44) . . Suleiman (Talk | contribs) | ||
17:42 (cur | prev) . . (+122) . . Suleiman (Talk | contribs) | ||
N | 17:39 (cur | prev) . . (+88) . . Suleiman (Talk | contribs) (Created page with "* Glassman Gun PSS interlock chassis * Beamline: 3 YAG screens - no bake of beamline *") |
17:40 | Gun Test Stand Meeting Minutes and To-Do Lists (3 changes | history) . . (+70) . . [Suleiman (3×)] | |
17:40 (cur | prev) . . (+10) . . Suleiman (Talk | contribs) | ||
17:40 (cur | prev) . . (+1) . . Suleiman (Talk | contribs) | ||
17:38 (cur | prev) . . (+59) . . Suleiman (Talk | contribs) |