Recent changes

Jump to: navigation, search

Track the most recent changes to the wiki on this page.

Recent changes options
Legend:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes
Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Show minor edits | Hide bots | Hide anonymous users | Hide registered users | Hide my edits

Show new changes starting from 19:07, 24 November 2020
   

24 November 2020

     13:29 (Upload log) . . Suleiman (Talk | contribs) uploaded File:DNetoBubbleUpdate-11242020.pdf
     13:29  Bubble Chamber Meeting Tuesday November 24, 2020‎ (diff | hist) . . (+42). . Suleiman (Talk | contribs)
N    11:33  Bubble Chamber Meeting Tuesday December 1, 2020‎ (diff | hist) . . (+305). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday December 1 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number...")
     11:33  Planning Meetings‎ (diff | hist) . . (+61). . Suleiman (Talk | contribs)

23 November 2020

     08:49 (Upload log) . . Chgarcia (Talk | contribs) uploaded File:Operational safety procedure form 108912.pdf
     08:46  CIS Safety‎ (diff | hist) . . (+272). . Chgarcia (Talk | contribs)

22 November 2020

     16:50 (Upload log) . . Poelker (Talk | contribs) uploaded File:HDIce status report 11 21 2020.pdf
     16:50  UITC meeting minutes‎ (diff | hist) . . (+48). . Poelker (Talk | contribs)

20 November 2020

     19:17  CIS Phase 1 work plans‎‎ (8 changes | history) . . (+516). . [Grames‎ (2×); Moser‎ (6×)]
     19:17 (cur | prev) . . (+33). . Moser (Talk | contribs) (Week 10 (Nov 23 - Nov 25 🦃))
     13:42 (cur | prev) . . (+44). . Moser (Talk | contribs) (Week 10 (Nov 23 - Nov 25 🦃))
     13:09 (cur | prev) . . (+27). . Moser (Talk | contribs) (Week 10 (Nov 23 - Nov 25 🦃))
     13:07 (cur | prev) . . (+13). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     09:06 (cur | prev) . . (-25). . Moser (Talk | contribs) (Week 10 (Nov 23 - Nov 25 🦃))
     08:28 (cur | prev) . . (+80). . Moser (Talk | contribs) (Week 10 (Nov 23 - Nov 25 🦃))
     08:28 (cur | prev) . . (+17). . Grames (Talk | contribs) (Week 11 (Nov 30 - Dec 4))
     08:27 (cur | prev) . . (+327). . Grames (Talk | contribs) (Week 11 (Nov 30 - Dec 4))
     13:35  CEBAF Injector Upgrade‎ (diff | hist) . . (+108). . Moser (Talk | contribs) (ATLIS Tasks)
     13:14  PPB - Nov 18, 2020‎‎ (2 changes | history) . . (+66). . [Samih‎ (2×)]
     13:14 (cur | prev) . . (+4). . Samih (Talk | contribs)
     13:13 (cur | prev) . . (+62). . Samih (Talk | contribs)
     13:12 (Upload log). . [Samih‎ (2×)]
     13:12 . . Samih (Talk | contribs) uploaded a new version of File:M2 internship report Sami HABET.pdf
     13:03 . . Samih (Talk | contribs) uploaded File:M2 internship report Sami HABET.pdf
     13:10  PPB - Nov 11, 2020‎ (diff | hist) . . (+67). . Samih (Talk | contribs)
     07:59  November 18, 2020 - Weekly ME meeting‎ (diff | hist) . . (+46). . Grames (Talk | contribs)

19 November 2020

N    19:21  November 20, 2020 Meeting Minutes‎ (diff | hist) . . (+274). . Yoskowij (Talk | contribs) (Created page with "==Post-meeting notes== *Josh presented ppt on creating initial distribution using an interpolated QE scan and a calibrated laser profile. Ionization Effects Meetings | Retu...")
N    19:21  Weekly phone call - November 20, 2020‎ (diff | hist) . . (+1,127). . Yoskowij (Talk | contribs) (Created page with "== Meeting Info == We will meet Friday @ 1pm EDT <u>'''via BlueJeans'''</u> Meeting ID: 979356718# Moderator Passcode: 3141 Meeting URL (for video and/or audio call in):...")
     19:16  Ionization Effects Meetings‎ (diff | hist) . . (+94). . Yoskowij (Talk | contribs)
     19:16  November 6, 2020 Meeting Minutes‎ (diff | hist) . . (+100). . Yoskowij (Talk | contribs)
     19:15  Weekly phone call - November 6, 2020‎ (diff | hist) . . (+1). . Yoskowij (Talk | contribs)
     18:32  CIS Phase 1 work plans‎‎ (3 changes | history) . . (+1,515). . [Moser‎ (3×)]
     18:32 (cur | prev) . . (+2). . Moser (Talk | contribs) (Week 10 (Nov 23 - Nov 25 🦃))
     18:31 (cur | prev) . . (+1,540). . Moser (Talk | contribs)
     08:21 (cur | prev) . . (-27). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     17:02  2020 Steel Shield Experiments at GTS‎‎ (30 changes | history) . . (+3,143). . [Yoskowij‎ (30×)]
     17:02 (cur | prev) . . (+175). . Yoskowij (Talk | contribs)
     16:59 (cur | prev) . . (+47). . Yoskowij (Talk | contribs)
     16:56 (cur | prev) . . (+6). . Yoskowij (Talk | contribs)
     16:55 (cur | prev) . . (0). . Yoskowij (Talk | contribs)
     16:55 (cur | prev) . . (+39). . Yoskowij (Talk | contribs)
     16:54 (cur | prev) . . (+20). . Yoskowij (Talk | contribs)
     16:45 (cur | prev) . . (+143). . Yoskowij (Talk | contribs)
     16:44 (cur | prev) . . (+93). . Yoskowij (Talk | contribs)
     16:42 (cur | prev) . . (+129). . Yoskowij (Talk | contribs)
     16:41 (cur | prev) . . (+28). . Yoskowij (Talk | contribs)
     16:37 (cur | prev) . . (+98). . Yoskowij (Talk | contribs)
     16:31 (cur | prev) . . (0). . Yoskowij (Talk | contribs)
     16:30 (cur | prev) . . (+1,431). . Yoskowij (Talk | contribs)
     16:16 (cur | prev) . . (+107). . Yoskowij (Talk | contribs)
     15:41 (cur | prev) . . (+23). . Yoskowij (Talk | contribs)
     12:25 (cur | prev) . . (+3). . Yoskowij (Talk | contribs)
     12:25 (cur | prev) . . (+323). . Yoskowij (Talk | contribs)
     12:19 (cur | prev) . . (+22). . Yoskowij (Talk | contribs)
     12:14 (cur | prev) . . (+271). . Yoskowij (Talk | contribs)
     12:04 (cur | prev) . . (+8). . Yoskowij (Talk | contribs)
     12:03 (cur | prev) . . (+96). . Yoskowij (Talk | contribs)
     12:01 (cur | prev) . . (+4). . Yoskowij (Talk | contribs)
     12:01 (cur | prev) . . (0). . Yoskowij (Talk | contribs)
     12:01 (cur | prev) . . (+19). . Yoskowij (Talk | contribs)
     11:59 (cur | prev) . . (-170). . Yoskowij (Talk | contribs)
     11:59 (cur | prev) . . (+1). . Yoskowij (Talk | contribs)
     11:58 (cur | prev) . . (-1). . Yoskowij (Talk | contribs)
     11:58 (cur | prev) . . (-41). . Yoskowij (Talk | contribs)
     11:53 (cur | prev) . . (+99). . Yoskowij (Talk | contribs)
     11:48 (cur | prev) . . (+170). . Yoskowij (Talk | contribs)
     17:00 (Upload log). . [Grames‎ (2×); Poelker‎ (2×); Samih‎ (2×); Suleiman‎ (5×); Yoskowij‎ (8×)]
     17:00 . . Yoskowij (Talk | contribs) uploaded File:Light through perpendicular window using RR rate calc.pdf
     16:56 . . Yoskowij (Talk | contribs) uploaded File:IMG 7293.JPG
     16:54 . . Yoskowij (Talk | contribs) uploaded File:IMG 7291.JPG
     16:44 . . Yoskowij (Talk | contribs) uploaded File:Spectral Radiance vs Wavelength ROI Zoomed.png
     16:43 . . Yoskowij (Talk | contribs) uploaded File:Spectral Radiance vs Wavelength ROI.png
     16:41 . . Yoskowij (Talk | contribs) uploaded File:Spectral Radiance vs Wavelength GENERAL.png
     15:51 . . Poelker (Talk | contribs) uploaded a new version of File:HDIce run3 control room staffing.jpg
     15:50 . . Poelker (Talk | contribs) uploaded File:HDIce run3 control room staffing.jpg
     11:47 . . Yoskowij (Talk | contribs) uploaded a new version of File:Yoskowitz Oral Qualifier Write-Up.pdf(Reverted to version as of 21:57, 26 February 2019)
     11:46 . . Yoskowij (Talk | contribs) uploaded a new version of File:Yoskowitz Oral Qualifier Write-Up.pdf
     09:02 . . Grames (Talk | contribs) uploaded File:MQW-QA-v1.docx
     08:56 . . Suleiman (Talk | contribs) uploaded File:NewVWienFieldMap.xlsx
     08:56 . . Suleiman (Talk | contribs) uploaded File:VWien FieldMap.pptx
     08:56 . . Suleiman (Talk | contribs) uploaded File:VWien FieldMap.pdf
     08:56 . . Suleiman (Talk | contribs) uploaded File:WienSpinControl.pptx
     08:55 . . Suleiman (Talk | contribs) uploaded File:WienSpinControl.pdf
     07:17 . . Grames (Talk | contribs) uploaded File:MHD Dummy Cube Prototype v4.docx
     04:06 . . Samih (Talk | contribs) uploaded a new version of File:Polarization transfer pair creation.pptx
     04:04 . . Samih (Talk | contribs) uploaded File:Polarization transfer pair creation.pptx
N    15:49  HDIce run3 control room staffing‎ (diff | hist) . . (+63). . Poelker (Talk | contribs) (Created page with "1000px")
     15:48  UITC meeting minutes‎ (diff | hist) . . (+39). . Poelker (Talk | contribs)
     12:37  Robust Meeting - Nov 19, 2020‎‎ (6 changes | history) . . (+1,509). . [Grames‎ (6×)]
     12:37 (cur | prev) . . (+620). . Grames (Talk | contribs)
     12:30 (cur | prev) . . (+99). . Grames (Talk | contribs)
     12:29 (cur | prev) . . (+12). . Grames (Talk | contribs)
     12:29 (cur | prev) . . (+112). . Grames (Talk | contribs)
     12:27 (cur | prev) . . (+66). . Grames (Talk | contribs)
     12:26 (cur | prev) . . (+600). . Grames (Talk | contribs)
     11:58  Ghost Beam Studies‎‎ (4 changes | history) . . (+26). . [Yoskowij‎ (4×)]
     11:58 (cur | prev) . . (-8). . Yoskowij (Talk | contribs)
     11:57 (cur | prev) . . (+1). . Yoskowij (Talk | contribs)
     11:57 (cur | prev) . . (+17). . Yoskowij (Talk | contribs)
     11:56 (cur | prev) . . (+16). . Yoskowij (Talk | contribs)
     10:02  November 18, 2020 - Weekly ME meeting‎‎ (17 changes | history) . . (-11,828). . [Grames‎ (17×)]
     10:02 (cur | prev) . . (+90). . Grames (Talk | contribs)
     09:10 (cur | prev) . . (0). . Grames (Talk | contribs)
     09:10 (cur | prev) . . (+336). . Grames (Talk | contribs)
     09:06 (cur | prev) . . (0). . Grames (Talk | contribs)
     09:06 (cur | prev) . . (+201). . Grames (Talk | contribs)
     09:04 (cur | prev) . . (+1). . Grames (Talk | contribs)
     09:04 (cur | prev) . . (-1). . Grames (Talk | contribs)
     09:03 (cur | prev) . . (-3). . Grames (Talk | contribs)
     09:03 (cur | prev) . . (-2). . Grames (Talk | contribs)
     09:02 (cur | prev) . . (+64). . Grames (Talk | contribs)
     08:52 (cur | prev) . . (-156). . Grames (Talk | contribs)
     07:19 (cur | prev) . . (0). . Grames (Talk | contribs)
     07:19 (cur | prev) . . (-12,954). . Grames (Talk | contribs)
     07:17 (cur | prev) . . (0). . Grames (Talk | contribs)
     07:10 (cur | prev) . . (0). . Grames (Talk | contribs)
     06:56 (cur | prev) . . (+235). . Grames (Talk | contribs)
     06:39 (cur | prev) . . (+361). . Grames (Talk | contribs)
     09:03  200kV Wien filter - FINAL‎‎ (2 changes | history) . . (+290). . [Gcroke‎; Suleiman‎]
     09:03 (cur | prev) . . (+88). . Gcroke (Talk | contribs) (Add link to wien signals file)
     08:55 (cur | prev) . . (+202). . Suleiman (Talk | contribs)
     04:14  PPB - Nov 18, 2020‎‎ (3 changes | history) . . (+109). . [Samih‎ (3×)]
     04:14 (cur | prev) . . (+6). . Samih (Talk | contribs) (Updates)
     04:05 (cur | prev) . . (0). . Samih (Talk | contribs)
     04:04 (cur | prev) . . (+103). . Samih (Talk | contribs)

18 November 2020

     20:52 (Upload log). . [Gcroke‎; Yoskowij‎; Poelker‎; Sajini‎; Grames‎ (3×)]
     20:52 . . Grames (Talk | contribs) uploaded File:MHD Dummy Cube Prototype v3.docx
     18:08 . . Grames (Talk | contribs) uploaded File:201118 espt.pptx
     17:41 . . Sajini (Talk | contribs) uploaded File:Emittance vs focusing sol.pdf
     16:52 . . Yoskowij (Talk | contribs) uploaded File:Phd072718s.gif
     12:57 . . Gcroke (Talk | contribs) uploaded File:Wien signals.xlsx(PV listing and descriptions for new Wien controls)
     09:50 . . Poelker (Talk | contribs) uploaded File:HDIce summary of run2.pdf
     07:30 . . Grames (Talk | contribs) uploaded File:201118 MDRshim.pdf
N    20:52  November 18, 2020 - Weekly ME meeting‎‎ (9 changes | history) . . (+16,913). . [Grames‎ (9×)]
     20:52 (cur | prev) . . (+54). . Grames (Talk | contribs)
     20:50 (cur | prev) . . (0). . Grames (Talk | contribs)
     20:48 (cur | prev) . . (-102). . Grames (Talk | contribs)
     20:06 (cur | prev) . . (+5). . Grames (Talk | contribs)
     20:06 (cur | prev) . . (+18). . Grames (Talk | contribs)
     20:05 (cur | prev) . . (-124). . Grames (Talk | contribs)
     20:03 (cur | prev) . . (+126). . Grames (Talk | contribs)
     09:44 (cur | prev) . . (-1,568). . Grames (Talk | contribs)
N    07:30 (cur | prev) . . (+18,504). . Grames (Talk | contribs) (Created page with "= Meeting Info == We will meet Thursday @ 10am EDT <u>'''via BlueJeans'''</u> Meeting URL (for video and/or audio call in): https://bluejeans.com/909497334 Phone number (fo...")
N    18:08  PPB - Nov 18, 2020‎‎ (11 changes | history) . . (+908). . [Grames‎ (11×)]
     18:08 (cur | prev) . . (+7). . Grames (Talk | contribs)
     18:07 (cur | prev) . . (+60). . Grames (Talk | contribs)
     07:06 (cur | prev) . . (+29). . Grames (Talk | contribs)
     06:44 (cur | prev) . . (+32). . Grames (Talk | contribs)
     06:42 (cur | prev) . . (-2). . Grames (Talk | contribs)
     06:40 (cur | prev) . . (-242). . Grames (Talk | contribs)
     06:40 (cur | prev) . . (-1). . Grames (Talk | contribs)
     06:39 (cur | prev) . . (0). . Grames (Talk | contribs)
     06:39 (cur | prev) . . (0). . Grames (Talk | contribs)
     06:39 (cur | prev) . . (0). . Grames (Talk | contribs)
N    06:38 (cur | prev) . . (+1,025). . Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed (Mexico 10am, US 12pm, France 5pm) Bluejeans: https://bluejeans.com/164307983 ==Updates== ;Joe * Possible CASA support topics : no f...")
     17:50  List of Ghost Beam Measurements‎‎ (12 changes | history) . . (+1,770). . [Yoskowij‎ (12×)]
     17:50 (cur | prev) . . (+155). . Yoskowij (Talk | contribs)
     17:47 (cur | prev) . . (+156). . Yoskowij (Talk | contribs)
     17:44 (cur | prev) . . (+42). . Yoskowij (Talk | contribs)
     17:43 (cur | prev) . . (+233). . Yoskowij (Talk | contribs)
     17:40 (cur | prev) . . (+126). . Yoskowij (Talk | contribs)
     17:38 (cur | prev) . . (+221). . Yoskowij (Talk | contribs)
     17:33 (cur | prev) . . (+515). . Yoskowij (Talk | contribs)
     17:25 (cur | prev) . . (-14). . Yoskowij (Talk | contribs)
     17:25 (cur | prev) . . (+43). . Yoskowij (Talk | contribs)
     17:23 (cur | prev) . . (+42). . Yoskowij (Talk | contribs)
     17:23 (cur | prev) . . (+41). . Yoskowij (Talk | contribs)
     17:22 (cur | prev) . . (+210). . Yoskowij (Talk | contribs)
     17:41  Publications and Research Presentations‎ (diff | hist) . . (+126). . Sajini (Talk | contribs)
N    17:11  2020 Steel Shield Experiments at GTS‎‎ (3 changes | history) . . (+259). . [Yoskowij‎ (3×)]
     17:11 (cur | prev) . . (+38). . Yoskowij (Talk | contribs)
     17:11 (cur | prev) . . (+13). . Yoskowij (Talk | contribs)
N    16:45 (cur | prev) . . (+208). . Yoskowij (Talk | contribs) (Created page with "Info on proposed steel shield experiments using the T-Gun at GTS == Parameters == == Experimental Procedure == == Relevant Calculations/Tech Notes == Ghost Beam Studies...")
     17:00  Josh Yoskowitz‎‎ (5 changes | history) . . (+47). . [Yoskowij‎ (5×)]
     17:00 (cur | prev) . . (+10). . Yoskowij (Talk | contribs)
     17:00 (cur | prev) . . (+73). . Yoskowij (Talk | contribs)
     16:54 (cur | prev) . . (-31). . Yoskowij (Talk | contribs)
     16:53 (cur | prev) . . (+5). . Yoskowij (Talk | contribs)
     16:52 (cur | prev) . . (-10). . Yoskowij (Talk | contribs)
     16:43  Ghost Beam Studies‎ (diff | hist) . . (+177). . Yoskowij (Talk | contribs)
     09:49  UITC meeting minutes‎ (diff | hist) . . (+38). . Poelker (Talk | contribs)
     08:16  CIS Phase 1 work plans‎ (diff | hist) . . (+9). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     07:20  AIPINJ - Upgrade Meetings‎ (diff | hist) . . (+43). . Grames (Talk | contribs)
     06:30  PPB Meetings‎ (diff | hist) . . (+24). . Grames (Talk | contribs)

17 November 2020

     16:57 (Upload log). . [Poelker‎; Suleiman‎]
     16:57 . . Poelker (Talk | contribs) uploaded File:Golden orbit procedure.docx
     13:28 . . Suleiman (Talk | contribs) uploaded File:DNetoBubbleUpdate-11172020.pdf
     16:57  UITF Procedures not managed via document control‎ (diff | hist) . . (+75). . Poelker (Talk | contribs)
N    13:30  Bubble Chamber Meeting Tuesday November 24, 2020‎ (diff | hist) . . (+306). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday November 24 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone numbe...")
     13:29  Planning Meetings‎ (diff | hist) . . (+62). . Suleiman (Talk | contribs)
     13:28  Bubble Chamber Meeting Tuesday November 17, 2020‎ (diff | hist) . . (+42). . Suleiman (Talk | contribs)
     09:32  CIS Phase 1 work plans‎ (diff | hist) . . (+75). . Moser (Talk | contribs)

16 November 2020

     21:55  CIS Phase 1 work plans‎‎ (2 changes | history) . . (-34). . [Moser‎ (2×)]
     21:55 (cur | prev) . . (+10). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     21:46 (cur | prev) . . (-44). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     21:41  CEBAF Injector Upgrade‎ (diff | hist) . . (+130). . Moser (Talk | contribs) (ATLIS Tasks)
     09:38 (Upload log) . . Poelker (Talk | contribs) uploaded File:HDIce status report 11 15 2020.pdf
     09:38  UITC meeting minutes‎ (diff | hist) . . (+46). . Poelker (Talk | contribs)

13 November 2020

     15:48  CIS Phase 1 work plans‎‎ (4 changes | history) . . (+1,074). . [Moser‎ (4×)]
     15:48 (cur | prev) . . (+360). . Moser (Talk | contribs)
     15:32 (cur | prev) . . (+104). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     15:30 (cur | prev) . . (-2). . Moser (Talk | contribs)
     15:28 (cur | prev) . . (+612). . Moser (Talk | contribs)
     10:20  200kV Wien filter - FINAL‎‎ (3 changes | history) . . (+59). . [Chgarcia‎ (3×)]
     10:20 (cur | prev) . . (+4). . Chgarcia (Talk | contribs)
     10:18 (cur | prev) . . (0). . Chgarcia (Talk | contribs)
     09:11 (cur | prev) . . (+55). . Chgarcia (Talk | contribs)
     10:19 (Upload log). . [Chgarcia‎ (2×)]
     10:19 . . Chgarcia (Talk | contribs) uploaded File:CEBAF Wiens rebuild schedule Nov 13 2020.png
     09:13 . . Chgarcia (Talk | contribs) uploaded File:Voltage readouts cal test plan Rev01.pptx

12 November 2020

     16:37  CIS Phase 1 work plans‎‎ (10 changes | history) . . (+1,688). . [Moser‎ (10×)]
     16:37 (cur | prev) . . (+1). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     16:24 (cur | prev) . . (+33). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     16:22 (cur | prev) . . (+117). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     12:00 (cur | prev) . . (+130). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     11:58 (cur | prev) . . (-3). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     11:27 (cur | prev) . . (-10). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     11:26 (cur | prev) . . (+19). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     11:25 (cur | prev) . . (+9). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     11:25 (cur | prev) . . (+279). . Moser (Talk | contribs)
     11:17 (cur | prev) . . (+1,113). . Moser (Talk | contribs)
     16:36 (Upload log) . . Moser (Talk | contribs) uploaded File:InjSB Week9.png
N    11:13  November 12, 2020 - Weekly ME meeting‎‎ (14 changes | history) . . (+18,438). . [Grames‎ (14×)]
     11:13 (cur | prev) . . (+133). . Grames (Talk | contribs)
     10:51 (cur | prev) . . (+53). . Grames (Talk | contribs)
     10:31 (cur | prev) . . (+149). . Grames (Talk | contribs)
     10:26 (cur | prev) . . (+1). . Grames (Talk | contribs)
     10:23 (cur | prev) . . (+31). . Grames (Talk | contribs)
     10:21 (cur | prev) . . (+59). . Grames (Talk | contribs)
     10:19 (cur | prev) . . (+143). . Grames (Talk | contribs)
     10:13 (cur | prev) . . (+36). . Grames (Talk | contribs)
     10:11 (cur | prev) . . (+60). . Grames (Talk | contribs)
     10:11 (cur | prev) . . (+93). . Grames (Talk | contribs)
     10:10 (cur | prev) . . (+24). . Grames (Talk | contribs)
     10:00 (cur | prev) . . (+414). . Grames (Talk | contribs)
     09:45 (cur | prev) . . (+543). . Grames (Talk | contribs)
N    09:36 (cur | prev) . . (+16,699). . Grames (Talk | contribs) (Created page with "= Meeting Info == We will meet Thursday @ 10am EDT <u>'''via BlueJeans'''</u> Meeting URL (for video and/or audio call in): https://bluejeans.com/909497334 Phone number (fo...")
     09:34  AIPINJ - Upgrade Meetings‎ (diff | hist) . . (+43). . Grames (Talk | contribs)

11 November 2020

     17:19  CEBAF Injector Upgrade‎ (diff | hist) . . (+109). . Moser (Talk | contribs) (ATLIS Tasks)
N    16:45  Robust Meeting - Nov 19, 2020‎‎ (5 changes | history) . . (+1,282). . [Grames‎ (5×)]
     16:45 (cur | prev) . . (+77). . Grames (Talk | contribs)
     16:40 (cur | prev) . . (+39). . Grames (Talk | contribs)
     16:38 (cur | prev) . . (+198). . Grames (Talk | contribs)
     16:25 (cur | prev) . . (+148). . Grames (Talk | contribs)
N    16:24 (cur | prev) . . (+820). . Grames (Talk | contribs) (Created page with " #The photocathode lifetime at UITF is REALLY bad, the field emission at 200 kV certainly doesn’t help (is it the sole problem?). So take apart gun polish electrode, krypt...")
     16:23  Robust Meetings‎ (diff | hist) . . (+56). . Grames (Talk | contribs)
     11:11 (Upload log). . [Voutier‎; Grames‎ (2×)]
     11:11 . . Grames (Talk | contribs) uploaded a new version of File:PolTra-Brem.pptx
     09:06 . . Voutier (Talk | contribs) uploaded File:PolTra-Brem.pptx
     06:35 . . Grames (Talk | contribs) uploaded File:201111 GPT Spin Tracking.docx
     10:44  CIS Phase 1 work plans‎‎ (3 changes | history) . . (+28). . [Moser‎ (3×)]
     10:44 (cur | prev) . . (+59). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     09:09 (cur | prev) . . (+3). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:16 (cur | prev) . . (-34). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
N    09:05  PPB - Nov 11, 2020‎‎ (8 changes | history) . . (+1,075). . [Voutier‎ (2×); Grames‎ (6×)]
     09:05 (cur | prev) . . (+27). . Voutier (Talk | contribs) (Updates)
     08:23 (cur | prev) . . (+66). . Grames (Talk | contribs)
     07:59 (cur | prev) . . (+215). . Voutier (Talk | contribs) (Updates)
     07:07 (cur | prev) . . (+71). . Grames (Talk | contribs)
     06:41 (cur | prev) . . (+95). . Grames (Talk | contribs)
     06:39 (cur | prev) . . (-296). . Grames (Talk | contribs)
     06:35 (cur | prev) . . (-1). . Grames (Talk | contribs)
N    06:35 (cur | prev) . . (+898). . Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed (Mexico 10am, US 12pm, France 5pm) Bluejeans: https://bluejeans.com/164307983 ==Updates== ;Joe * Status of post-doc * Update on spin...")
     08:22  PPB Geant4 Development‎‎ (4 changes | history) . . (+394). . [Grames‎ (4×)]
     08:22 (cur | prev) . . (+41). . Grames (Talk | contribs)
     08:22 (cur | prev) . . (+43). . Grames (Talk | contribs)
     08:21 (cur | prev) . . (+107). . Grames (Talk | contribs)
     08:19 (cur | prev) . . (+203). . Grames (Talk | contribs)
     06:03  PPB Meetings‎ (diff | hist) . . (+24). . Grames (Talk | contribs)

10 November 2020

     15:16  Josh Yoskowitz‎‎ (3 changes | history) . . (-44). . [Yoskowij‎ (3×)]
     15:16 (cur | prev) . . (-34). . Yoskowij (Talk | contribs)
     15:16 (cur | prev) . . (+34). . Yoskowij (Talk | contribs)
     15:16 (cur | prev) . . (-44). . Yoskowij (Talk | contribs)
     14:39  CEBAF Injector Upgrade‎‎ (6 changes | history) . . (-17). . [Grames‎ (6×)]
     14:39 (cur | prev) . . (-9). . Grames (Talk | contribs)
     14:38 (cur | prev) . . (0). . Grames (Talk | contribs)
     14:38 (cur | prev) . . (+12). . Grames (Talk | contribs)
     14:30 (cur | prev) . . (+4). . Grames (Talk | contribs)
     14:29 (cur | prev) . . (-2). . Grames (Talk | contribs)
     14:29 (cur | prev) . . (-22). . Grames (Talk | contribs)
     14:29 (Upload log). . [Grames‎; Poelker‎]
     14:29 . . Grames (Talk | contribs) uploaded File:201110 AIPINJ Schedule.pdf
     12:11 . . Poelker (Talk | contribs) uploaded File:Running log during run2.docx
     12:19  CIS Refereed Publications‎ (diff | hist) . . (+12). . Poelker (Talk | contribs)
     12:10  UITC meeting minutes‎ (diff | hist) . . (+41). . Poelker (Talk | contribs)
N    11:27  Bubble Chamber Meeting Tuesday November 17, 2020‎ (diff | hist) . . (+306). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday November 17 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone numbe...")
N    11:27  Bubble Chamber Meeting Tuesday November 10, 2020‎ (diff | hist) . . (+306). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday November 10 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone numbe...")
     11:27  Planning Meetings‎ (diff | hist) . . (+124). . Suleiman (Talk | contribs)
     09:07  CIS Phase 1 work plans‎‎ (12 changes | history) . . (+853). . [Moser‎ (5×); Grames‎ (7×)]
     09:07 (cur | prev) . . (+33). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     09:07 (cur | prev) . . (+127). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:36 (cur | prev) . . (-8). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:36 (cur | prev) . . (+3). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:34 (cur | prev) . . (+11). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:34 (cur | prev) . . (-6). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:33 (cur | prev) . . (-2). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:32 (cur | prev) . . (-1). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:32 (cur | prev) . . (+574). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:00 (cur | prev) . . (+83). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     07:58 (cur | prev) . . (+39). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     07:40 (cur | prev) . . (0). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)

9 November 2020

     20:42  CIS Phase 1 work plans‎‎ (13 changes | history) . . (+1,781). . [Grames‎ (3×); Moser‎ (10×)]
     20:42 (cur | prev) . . (-2). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     20:36 (cur | prev) . . (+41). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     20:34 (cur | prev) . . (+4). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     20:07 (cur | prev) . . (+36). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     20:05 (cur | prev) . . (+81). . Moser (Talk | contribs) (Week 9 (Nov 16 - Nov 20))
     19:28 (cur | prev) . . (+124). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     19:27 (cur | prev) . . (-124). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     19:22 (cur | prev) . . (0). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     19:22 (cur | prev) . . (0). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     19:21 (cur | prev) . . (+1,440). . Moser (Talk | contribs)
     08:04 (cur | prev) . . (0). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:04 (cur | prev) . . (+3). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     08:04 (cur | prev) . . (+178). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     20:39 (Upload log). . [Moser‎ (2×); Poelker‎ (6×)]
     20:39 . . Moser (Talk | contribs) uploaded a new version of File:InjSB Week8.png
     20:33 . . Moser (Talk | contribs) uploaded File:InjSB Week8.png
     09:34 . . Poelker (Talk | contribs) uploaded File:Chapter 7.pdf
     09:32 . . Poelker (Talk | contribs) uploaded a new version of File:Chapter 7 Modern Developments in Vacuum Electron Sources.pdf
     09:31 . . Poelker (Talk | contribs) uploaded a new version of File:Chapter 7 Modern Developments in Vacuum Electron Sources.pdf
     09:30 . . Poelker (Talk | contribs) uploaded File:Chapter 7 Modern Developments in Vacuum Electron Sources.pdf
     09:29 . . Poelker (Talk | contribs) uploaded File:Charpter 7 Modern Developments in Vacuum Electron Sources.pdf
     09:18 . . Poelker (Talk | contribs) uploaded File:HDIce status report 11 8 2020.pdf
     09:34  CIS Refereed Publications‎‎ (7 changes | history) . . (+435). . [Poelker‎ (7×)]
     09:34 (cur | prev) . . (+4). . Poelker (Talk | contribs)
     09:33 (cur | prev) . . (-47). . Poelker (Talk | contribs)
     09:30 (cur | prev) . . (-1). . Poelker (Talk | contribs)
     09:28 (cur | prev) . . (+73). . Poelker (Talk | contribs)
     09:27 (cur | prev) . . (0). . Poelker (Talk | contribs)
     09:26 (cur | prev) . . (+95). . Poelker (Talk | contribs)
     09:23 (cur | prev) . . (+311). . Poelker (Talk | contribs)
     09:18  UITC meeting minutes‎‎ (3 changes | history) . . (+47). . [Poelker‎ (3×)]
     09:18 (cur | prev) . . (+1). . Poelker (Talk | contribs)
     09:18 (cur | prev) . . (+1). . Poelker (Talk | contribs)
     09:17 (cur | prev) . . (+45). . Poelker (Talk | contribs)

7 November 2020

     06:53  CEBAF Injector Upgrade‎ (diff | hist) . . (+21). . Grames (Talk | contribs)

6 November 2020

     12:48  Weekly phone call - November 6, 2020‎‎ (2 changes | history) . . (+245). . [Yoskowij‎ (2×)]
     12:48 (cur | prev) . . (+114). . Yoskowij (Talk | contribs)
     09:30 (cur | prev) . . (+131). . Yoskowij (Talk | contribs)
     12:47 (Upload log) . . Yoskowij (Talk | contribs) uploaded File:Laser Profile and QE Scan to Initial Distribution.pptx
     10:15  CIS Phase 1 work plans‎‎ (24 changes | history) . . (-510). . [Grames‎ (24×)]
     10:15 (cur | prev) . . (+6). . Grames (Talk | contribs)
     10:07 (cur | prev) . . (+13). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     10:06 (cur | prev) . . (-5). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     10:05 (cur | prev) . . (0). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) beamline anchors/pedestals, Wien mapping/HV system, A1/A2 cubes, prebuncher)
     10:05 (cur | prev) . . (-16). . Grames (Talk | contribs)
     10:04 (cur | prev) . . (-34). . Grames (Talk | contribs)
     10:03 (cur | prev) . . (-1). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13) Install gun table anchors, pedestals, Wien mapping, Wien HV system, A1/A2 cubes, prebuncher =)
     10:03 (cur | prev) . . (-6). . Grames (Talk | contribs)
     10:01 (cur | prev) . . (-15). . Grames (Talk | contribs)
     09:59 (cur | prev) . . (-14). . Grames (Talk | contribs)
     09:58 (cur | prev) . . (+9). . Grames (Talk | contribs)
     09:53 (cur | prev) . . (-6). . Grames (Talk | contribs)
     09:52 (cur | prev) . . (+5). . Grames (Talk | contribs)
     09:51 (cur | prev) . . (+162). . Grames (Talk | contribs)
     09:48 (cur | prev) . . (-1,064). . Grames (Talk | contribs)
     09:46 (cur | prev) . . (+26). . Grames (Talk | contribs)
     09:45 (cur | prev) . . (-2). . Grames (Talk | contribs)
     09:44 (cur | prev) . . (0). . Grames (Talk | contribs)
     09:43 (cur | prev) . . (+85). . Grames (Talk | contribs) (Non-Tunnel Work)
     09:42 (cur | prev) . . (+4). . Grames (Talk | contribs) (Tunnel work)
     08:28 (cur | prev) . . (-27). . Grames (Talk | contribs) (Non-Tunnel Work)
     08:27 (cur | prev) . . (+117). . Grames (Talk | contribs) (Non-Tunnel Work)
     08:25 (cur | prev) . . (-3). . Grames (Talk | contribs) (Tunnel work)
     08:25 (cur | prev) . . (+256). . Grames (Talk | contribs) (Tunnel work)

5 November 2020

     10:22  November 5, 2020 - Weekly ME meeting‎‎ (4 changes | history) . . (+1,185). . [Grames‎ (4×)]
     10:22 (cur | prev) . . (+304). . Grames (Talk | contribs)
     10:07 (cur | prev) . . (+78). . Grames (Talk | contribs)
     09:45 (cur | prev) . . (+2). . Grames (Talk | contribs)
     09:44 (cur | prev) . . (+801). . Grames (Talk | contribs)

4 November 2020

N    21:41  November 5, 2020 - Weekly ME meeting‎‎ (5 changes | history) . . (+12,240). . [Grames‎ (5×)]
     21:41 (cur | prev) . . (0). . Grames (Talk | contribs)
     21:39 (cur | prev) . . (+379). . Grames (Talk | contribs)
     20:03 (cur | prev) . . (+9). . Grames (Talk | contribs)
     20:02 (cur | prev) . . (+11,533). . Grames (Talk | contribs)
N    19:36 (cur | prev) . . (+319). . Grames (Talk | contribs) (Created page with "= Meeting Info == We will meet Thursday @ 10am EDT <u>'''via BlueJeans'''</u> Meeting URL (for video and/or audio call in): https://bluejeans.com/909497334 Phone number (fo...")
     19:35  AIPINJ - Upgrade Meetings‎ (diff | hist) . . (+42). . Grames (Talk | contribs)
N    14:18  LLRF 3.0 Phase 1‎‎ (5 changes | history) . . (+927). . [Grames‎ (5×)]
     14:18 (cur | prev) . . (-1). . Grames (Talk | contribs)
     14:18 (cur | prev) . . (+1). . Grames (Talk | contribs)
     14:17 (cur | prev) . . (-1). . Grames (Talk | contribs)
     14:17 (cur | prev) . . (-7). . Grames (Talk | contribs)
N    14:16 (cur | prev) . . (+935). . Grames (Talk | contribs) (Created page with " From: hovater <hovater@jlab.org>Sent: Wednesday, November 4, 2020 2:11 PMTo: Joe Grames <grames@jlab.org>; Tomasz Plawski <plawski@jlab.org>; Pamela Kjeldsen <kjeldsen@jlab.o...")
     14:15  CEBAF Injector Upgrade‎‎ (4 changes | history) . . (+266). . [Grames‎ (4×)]
     14:15 (cur | prev) . . (+22). . Grames (Talk | contribs)
     14:09 (cur | prev) . . (-1). . Grames (Talk | contribs)
     14:09 (cur | prev) . . (+83). . Grames (Talk | contribs)
     14:08 (cur | prev) . . (+162). . Grames (Talk | contribs)
     13:58 (Upload log) . . Grames (Talk | contribs) uploaded File:PSS Kicker Magnet Design-V03-Lakshmi-201030.pdf
     13:58  PSS Kicker (upgraded for 200 kV upgrade)‎ (diff | hist) . . (+80). . Grames (Talk | contribs)

3 November 2020

N    13:57  UITF Mott Data Acquisition System‎‎ (2 changes | history) . . (+322). . [Suleiman‎ (2×)]
     13:57 (cur | prev) . . (-266). . Suleiman (Talk | contribs)
N    13:57 (cur | prev) . . (+588). . Suleiman (Talk | contribs) (Created page with "=='''INT FADC'''== const FADC_ADDR = 0xed0000 # 12 bit fADC Int - Slot 10 const FADCMODE = 3 (Int_Int, special) const FADCSLOT_PEPPo3 = 10 cons...")
N    13:56  UITF Mott Polarimeter‎‎ (3 changes | history) . . (+224). . [Suleiman‎ (3×)]
     13:56 (cur | prev) . . (-590). . Suleiman (Talk | contribs)
     13:56 (cur | prev) . . (+226). . Suleiman (Talk | contribs)
N    13:54 (cur | prev) . . (+588). . Suleiman (Talk | contribs) (Created page with "=='''INT FADC'''== const FADC_ADDR = 0xed0000 # 12 bit fADC Int - Slot 10 const FADCMODE = 3 (Int_Int, special) const FADCSLOT_PEPPo3 = 10 cons...")
     13:53  Robust Technical Areas‎‎ (2 changes | history) . . (+14). . [Suleiman‎ (2×)]
     13:53 (cur | prev) . . (+2). . Suleiman (Talk | contribs)
     13:53 (cur | prev) . . (+12). . Suleiman (Talk | contribs)
N    10:52  Bubble Chamber Meeting Tuesday November 3, 2020‎‎ (2 changes | history) . . (+305). . [Suleiman‎ (2×)]
     10:52 (cur | prev) . . (-27). . Suleiman (Talk | contribs)
N    10:50 (cur | prev) . . (+332). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday November 3 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number...")
     10:50  Bubble Chamber Meeting Tuesday October 27, 2020‎ (diff | hist) . . (-27). . Suleiman (Talk | contribs)
     10:50  Planning Meetings‎ (diff | hist) . . (+61). . Suleiman (Talk | contribs)

2 November 2020

N    15:02  Weekly phone call - November 6, 2020‎ (diff | hist) . . (+949). . Yoskowij (Talk | contribs) (Created page with "== Meeting Info == We will meet Friday @ 1pm EDT <u>'''via BlueJeans'''</u> Meeting ID: 979356718# Moderator Passcode: 3141 Meeting URL (for video and/or audio call in):...")
N    15:00  November 6, 2020 Meeting Minutes‎ (diff | hist) . . (+173). . Yoskowij (Talk | contribs) (Created page with "==Post-meeting notes== *To be added... Return to Ionization Effects Meetings Go to Meeting Page")
     14:59  Ionization Effects Meetings‎ (diff | hist) . . (+108). . Yoskowij (Talk | contribs)
     10:40 (Upload log) . . Poelker (Talk | contribs) uploaded File:HDIce status report 11 1 2020.pdf
     10:40  UITC meeting minutes‎ (diff | hist) . . (+46). . Poelker (Talk | contribs)
     09:27  To-Do List For Thesis‎‎ (3 changes | history) . . (+19). . [Yoskowij‎ (3×)]
     09:27 (cur | prev) . . (-13). . Yoskowij (Talk | contribs)
     09:25 (cur | prev) . . (-1). . Yoskowij (Talk | contribs)
     09:23 (cur | prev) . . (+33). . Yoskowij (Talk | contribs)

1 November 2020

     17:30  CIS Phase 1 work plans‎‎ (7 changes | history) . . (+121). . [Grames‎ (7×)]
     17:30 (cur | prev) . . (+18). . Grames (Talk | contribs) (Tunnel work)
     17:27 (cur | prev) . . (-4). . Grames (Talk | contribs) (Week 8 (Nov 9 - Nov 13))
     17:25 (cur | prev) . . (+123). . Grames (Talk | contribs) (Tunnel work)
     17:23 (cur | prev) . . (-15). . Grames (Talk | contribs) (Non-Tunnel Work--)
     17:22 (cur | prev) . . (+10). . Grames (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Y-Chamber push, Diagnostics Upgrades)
     17:20 (cur | prev) . . (-116). . Grames (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Y-Chamber push, Diagnostics Upgrades)
     17:19 (cur | prev) . . (+105). . Grames (Talk | contribs)

31 October 2020

     14:53 (Upload log) . . Poelker (Talk | contribs) uploaded File:HDIce status report 10 25 2020.pdf
     14:53  UITC meeting minutes‎ (diff | hist) . . (+47). . Poelker (Talk | contribs)

30 October 2020

     17:46  CIS Phase 1 work plans‎‎ (15 changes | history) . . (+365). . [Moser‎ (15×)]
     17:46 (cur | prev) . . (+12). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Y-Chamber push, Diagnostics Upgrades)
     17:45 (cur | prev) . . (-52). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     17:20 (cur | prev) . . (-31). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     17:09 (cur | prev) . . (+13). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Y-Chamber push, Diagnostics Upgrades)
     17:08 (cur | prev) . . (+158). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Y-Chamber push, Diagnostics Upgrades)
     13:16 (cur | prev) . . (+45). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Pedestal Point Layouts and Anchor Installs)
     13:13 (cur | prev) . . (0). . Moser (Talk | contribs)
     12:04 (cur | prev) . . (+19). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Pedestal Point Layouts and Anchor Installs)
     12:03 (cur | prev) . . (+107). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Pedestal Point Layouts and Anchor Installs)
     12:01 (cur | prev) . . (-13). . Moser (Talk | contribs) (Week 8 (Nov 9 - Nov 13))
     12:01 (cur | prev) . . (-74). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Pedestal Point Layouts and Anchor Installs)
     11:57 (cur | prev) . . (+13). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     08:42 (cur | prev) . . (+75). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Pedestal Point Layouts and Anchor Installs)
     08:18 (cur | prev) . . (+4). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Pedestal Point Layouts and Anchor Installs)
     07:21 (cur | prev) . . (+89). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     14:37 (Upload log). . [Moser‎; Grames‎ (2×)]
     14:37 . . Grames (Talk | contribs) uploaded File:APSDNP2020-Grames FINAL 150dpi.pptx
     12:57 . . Grames (Talk | contribs) uploaded File:APSDNP2020-Grames FINAL.pptx
     09:54 . . Moser (Talk | contribs) uploaded File:1993.png
     14:36  CIS Conference and Workshop Proceedings‎‎ (3 changes | history) . . (+49). . [Grames‎ (3×)]
     14:36 (cur | prev) . . (+7). . Grames (Talk | contribs)
     12:57 (cur | prev) . . (+2). . Grames (Talk | contribs)
     12:56 (cur | prev) . . (+40). . Grames (Talk | contribs)
     09:56  Historical Timeline‎‎ (4 changes | history) . . (+38). . [Moser‎ (4×)]
     09:56 (cur | prev) . . (-1). . Moser (Talk | contribs) (1993)
     09:55 (cur | prev) . . (+2). . Moser (Talk | contribs) (1993)
     09:55 (cur | prev) . . (+2). . Moser (Talk | contribs) (1993)
     09:55 (cur | prev) . . (+35). . Moser (Talk | contribs)
     09:48  CEBAF Injector Upgrade‎ (diff | hist) . . (+94). . Moser (Talk | contribs) (ATLIS Tasks)
     08:10  October 30, 2020 - Special Spooky Hallow's Eve ME Meeting‎‎ (4 changes | history) . . (+1,828). . [Grames‎ (4×)]
     08:10 (cur | prev) . . (+311). . Grames (Talk | contribs)
     08:05 (cur | prev) . . (+388). . Grames (Talk | contribs)
     07:26 (cur | prev) . . (-1). . Grames (Talk | contribs)
     07:25 (cur | prev) . . (+1,130). . Grames (Talk | contribs)

29 October 2020

     13:00  CIS Phase 1 work plans‎‎ (23 changes | history) . . (+2,213). . [Moser‎ (23×)]
     13:00 (cur | prev) . . (-1). . Moser (Talk | contribs)
     12:44 (cur | prev) . . (+19). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     12:37 (cur | prev) . . (-195). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     12:28 (cur | prev) . . (+88). . Moser (Talk | contribs)
     12:27 (cur | prev) . . (+1,534). . Moser (Talk | contribs)
     12:17 (cur | prev) . . (0). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Pedestal Point Layouts and Anchor Installs)
     12:15 (cur | prev) . . (-16). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     12:15 (cur | prev) . . (+17). . Moser (Talk | contribs)
     12:13 (cur | prev) . . (+48). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     12:12 (cur | prev) . . (+262). . Moser (Talk | contribs)
     12:08 (cur | prev) . . (+118). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Pedestal Point Layouts and Anchor Installs)
     12:03 (cur | prev) . . (+1). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     11:58 (cur | prev) . . (+13). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     11:57 (cur | prev) . . (-68). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     11:55 (cur | prev) . . (-413). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     10:49 (cur | prev) . . (+18). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move Gun2 new location)
     08:42 (cur | prev) . . (-33). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     08:40 (cur | prev) . . (+81). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     08:15 (cur | prev) . . (+19). . Moser (Talk | contribs) (Week 7 (Nov 2 - Nov 6) Point Layout and Anchor Installs)
     07:48 (cur | prev) . . (+119). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     07:27 (cur | prev) . . (-1). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     07:26 (cur | prev) . . (+32). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     07:25 (cur | prev) . . (+571). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     12:40 (Upload log). . [Moser‎; Grames‎; Chgarcia‎ (2×)]
     12:40 . . Moser (Talk | contribs) uploaded File:InjSB Week7.png
     11:22 . . Chgarcia (Talk | contribs) uploaded File:CEBAF Wiens rebuild schedule Oct 29 2020.png
     10:52 . . Chgarcia (Talk | contribs) uploaded File:HV Controls update meeting Oct 28 2020.pptx
     04:57 . . Grames (Talk | contribs) uploaded File:20-T016 University Paris-Saclay - fully executed.pdf
     11:21  200kV Wien filter - FINAL‎‎ (5 changes | history) . . (+148). . [Chgarcia‎ (5×)]
     11:21 (cur | prev) . . (0). . Chgarcia (Talk | contribs)
     10:54 (cur | prev) . . (+138). . Chgarcia (Talk | contribs)
     10:35 (cur | prev) . . (0). . Chgarcia (Talk | contribs)
     10:35 (cur | prev) . . (+5). . Chgarcia (Talk | contribs)
     10:34 (cur | prev) . . (+5). . Chgarcia (Talk | contribs)
N    10:52  October 28, 2020 - Wien HV controls update meeting‎‎ (2 changes | history) . . (+2,624). . [Chgarcia‎ (2×)]
     10:52 (cur | prev) . . (+2,068). . Chgarcia (Talk | contribs)
N    10:42 (cur | prev) . . (+556). . Chgarcia (Talk | contribs) (Created page with "File:HV Controls update meeting Oct 28 2020.pptx '''HV and interlock cables:''' * Old Wien HV cables have been disconnected but still in place * Gun2 and Gun3 HV cabl...")
     10:38  AIPINJ - Upgrade Meetings‎‎ (3 changes | history) . . (+61). . [Chgarcia‎ (3×)]
     10:38 (cur | prev) . . (0). . Chgarcia (Talk | contribs)
     10:33 (cur | prev) . . (0). . Chgarcia (Talk | contribs)
     10:30 (cur | prev) . . (+61). . Chgarcia (Talk | contribs)
N    10:36  October 27, 2020 - Wien magnetic field mapping and characterization meeting‎‎ (2 changes | history) . . (+1,269). . [Chgarcia‎ (2×)]
     10:36 (cur | prev) . . (+59). . Chgarcia (Talk | contribs)
N    10:36 (cur | prev) . . (+1,210). . Chgarcia (Talk | contribs) (Created page with "'''Hardware:''' * Use new SCE 20A/75V PS for measurements. This is the same type of PS that will be used for oparations * DC power will install new SCE PS in magnet t...")
     05:26  PPB References and Documents‎‎ (2 changes | history) . . (0). . [Grames‎ (2×)]
     05:26 (cur | prev) . . (-71). . Grames (Talk | contribs)
     04:56 (cur | prev) . . (+71). . Grames (Talk | contribs)

28 October 2020

     18:54  CIS Phase 1 work plans‎‎ (9 changes | history) . . (+1,509). . [Moser‎ (9×)]
     18:54 (cur | prev) . . (+13). . Moser (Talk | contribs) (Week 7 (Nov 2 - Oct 6) and beyond...)
     18:54 (cur | prev) . . (+14). . Moser (Talk | contribs) (Week 7 (Nov 2 - Oct 6) and beyond...)
     12:48 (cur | prev) . . (+67). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     12:15 (cur | prev) . . (-35). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     10:20 (cur | prev) . . (-40). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     08:42 (cur | prev) . . (+370). . Moser (Talk | contribs) (Week 7 (Nov 2 - Oct 6) and beyond...)
     08:37 (cur | prev) . . (+1,065). . Moser (Talk | contribs)
     08:29 (cur | prev) . . (-3). . Moser (Talk | contribs) (Penetration Work)
     08:17 (cur | prev) . . (+58). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
N    14:41  October 30, 2020 - Special Spooky Hallow's Eve ME Meeting‎‎ (2 changes | history) . . (+8,203). . [Grames‎ (2×)]
     14:41 (cur | prev) . . (0). . Grames (Talk | contribs)
N    14:41 (cur | prev) . . (+8,203). . Grames (Talk | contribs) (Created page with "= Meeting Info == '''SPECIAL HALLOW's EVE MEETING FRIDAY, OCT 30 @ 10am, use https://bluejeans.com/7572697097 ''' == Meeting October 29 == ; 10/23 - From Danny - on A1/A2...")
     14:41  AIPINJ - Upgrade Meetings‎‎ (2 changes | history) . . (+21). . [Grames‎ (2×)]
     14:41 (cur | prev) . . (-42). . Grames (Talk | contribs)
     14:40 (cur | prev) . . (+63). . Grames (Talk | contribs)

27 October 2020

N    19:48  PPB - Oct 28, 2020‎‎ (3 changes | history) . . (+1,789). . [Grames‎ (3×)]
     19:48 (cur | prev) . . (-19). . Grames (Talk | contribs)
     19:45 (cur | prev) . . (+3). . Grames (Talk | contribs)
N    19:44 (cur | prev) . . (+1,805). . Grames (Talk | contribs) (Created page with "== Meeting Info == We will meet on Wed (Mexico 10am, US 12pm, France 5pm) Bluejeans: https://bluejeans.com/164307983 ==Updates== ;France ;Mexico ;Joe - Update on spin tr...")
     19:35  PPB Meetings‎ (diff | hist) . . (+23). . Grames (Talk | contribs)
     17:20  CIS Phase 1 work plans‎‎ (11 changes | history) . . (+909). . [Moser‎ (11×)]
     17:20 (cur | prev) . . (-33). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     17:19 (cur | prev) . . (+76). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     17:16 (cur | prev) . . (+14). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     17:15 (cur | prev) . . (+27). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     17:14 (cur | prev) . . (+2). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     17:12 (cur | prev) . . (+153). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     17:08 (cur | prev) . . (+283). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     08:24 (cur | prev) . . (+68). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     08:07 (cur | prev) . . (+40). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     08:05 (cur | prev) . . (+57). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     07:27 (cur | prev) . . (+222). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
N    14:20  October 27, 2020 - Magnetic field mapping and characterization meeting‎‎ (2 changes | history) . . (+1,270). . [Chgarcia‎ (2×)]
     14:20 (cur | prev) . . (-205). . Chgarcia (Talk | contribs)
N    11:39 (cur | prev) . . (+1,475). . Chgarcia (Talk | contribs) (Created page with "*Media:Magnetic field mapping meeting Oct 27 2020.pptx '''Hardware:''' * Use new SCE 20A/75V PS for measurements. This is the same type of PS that will be used for o...")
     11:43  200kV Wien filter - FINAL‎‎ (3 changes | history) . . (+165). . [Chgarcia‎ (3×)]
     11:43 (cur | prev) . . (+61). . Chgarcia (Talk | contribs)
     11:42 (cur | prev) . . (+114). . Chgarcia (Talk | contribs)
     11:33 (cur | prev) . . (-10). . Chgarcia (Talk | contribs)
     11:40 (Upload log). . [Chgarcia‎; Suleiman‎]
     11:40 . . Chgarcia (Talk | contribs) uploaded File:Magnetic field mapping meeting Oct 27 2020.pptx
     07:35 . . Suleiman (Talk | contribs) uploaded File:NIMB 229 137 2005.pdf
     11:34  AIPINJ - Upgrade Meetings‎ (diff | hist) . . (+76). . Chgarcia (Talk | contribs)
N    07:35  Bubble Chamber Meeting Tuesday October 27, 2020‎‎ (4 changes | history) . . (+458). . [Suleiman‎ (4×)]
     07:35 (cur | prev) . . (+18). . Suleiman (Talk | contribs)
     07:34 (cur | prev) . . (+88). . Suleiman (Talk | contribs)
     07:23 (cur | prev) . . (+14). . Suleiman (Talk | contribs)
N    07:22 (cur | prev) . . (+338). . Suleiman (Talk | contribs) (Created page with "We will meet on Tuesday October 27 at 11:00 am EST. == For those calling in we'll use the Blue Jeans [https://cc.jlab.org/bluejeans] audio conference system. == Phone number...")
     07:22  Bubble Chamber Meeting Tuesday March 24, 2020‎ (diff | hist) . . (-27). . Suleiman (Talk | contribs)
     07:21  Planning Meetings‎ (diff | hist) . . (+61). . Suleiman (Talk | contribs)

26 October 2020

     20:42  CIS Phase 1 work plans‎‎ (5 changes | history) . . (+297). . [Moser‎ (5×)]
     20:42 (cur | prev) . . (0). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     20:24 (cur | prev) . . (+22). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     20:21 (cur | prev) . . (+188). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     12:12 (cur | prev) . . (+84). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     08:40 (cur | prev) . . (+3). . Moser (Talk | contribs) (Week 6 (Oct 26 - Oct 30) Remove old Y+NEG & Move GUn2 new location)
     20:41 (Upload log). . [Chgarcia‎; Moser‎]
     20:41 . . Moser (Talk | contribs) uploaded File:InjSB Week6.png
     10:41 . . Chgarcia (Talk | contribs) uploaded File:CEBAF Wiens rebuild schedule Oct 26 2020.png
     10:41  200kV Wien filter - FINAL‎ (diff | hist) . . (+150). . Chgarcia (Talk | contribs)