Search results

Jump to navigation Jump to search
  • ** gun - carlos/jessica/marcy<br /> ** degrader - marcy<br />
    308 bytes (42 words) - 12:21, 15 March 2024
  • ...b4&share=EdK4-xqvVeZBh4nTSBUclQEBYc5G0wknVAWXqmSTSVL3kw Sharepoint link to Marcy's Gun/2I/Y jobs]
    496 bytes (79 words) - 12:51, 10 September 2020
  • [[media:Marcy's evaluation of activation energy_summary of many test chambers including t
    209 bytes (28 words) - 10:51, 3 March 2022
  • January 11, 2016 - Small Group meeting regarding fitting functions: Tim, Dan, Marcy 2. Marcy: [[File:Pade_AvsR.pdf]] Pade functions for asym vs. rate
    508 bytes (75 words) - 11:32, 12 January 2016
  • * Marcy's update on the vacuum chamber
    496 bytes (75 words) - 08:48, 22 September 2021
  • * Marcy + tentative microMott schedule * Carlos, Marcy, Riad, Shukui, Matt
    450 bytes (63 words) - 15:18, 10 January 2024
  • ;Marcy, viewer marks for measurements [[media:viewscreens_Aug2019.docx]]
    72 bytes (9 words) - 16:06, 20 August 2019
  • January 7, 2016 - Small Group meeting regarding fitting functions: Tim, Dan, Marcy 2. Marcy: Looking at fitting parameters [[Media:Dunning-Gay-fit-functions.pptx]]
    544 bytes (71 words) - 15:12, 7 January 2016
  • ==(Marcy/Mamun) Run 1 target thickness==
    634 bytes (90 words) - 10:40, 16 February 2015
  • : Interaction vacuum - Marcy : Marcy - show/describe options for how NEG's might be mounted [[media:UHV1400Mount
    685 bytes (98 words) - 11:14, 17 September 2021
  • Marcy: [[File:Pade_run_2.pdf]]
    346 bytes (49 words) - 10:21, 4 February 2016
  • * Marcy: Asym vs. Rate, text on Pade [[File:fitting.docx]] * Marcy look at Marty's presentation [[File:24Feb2016.xlsx]]
    835 bytes (111 words) - 19:58, 3 December 2016
  • * Marcy/Carlos/Phil - Status of gun jobs (gun bake, NEG coating, alignment fixture, * Marcy - test YAG resistance
    772 bytes (120 words) - 21:28, 17 October 2022
  • * Marcy - select gold targets * Joe/Marcy - get existing tunnel camera framed with central beam pixel on old ladder a
    1 KB (187 words) - 16:04, 26 February 2021
  • #Marcy
    289 bytes (44 words) - 07:39, 22 February 2024
  • ...UBgR_iWPHI2jAfsc9wJE00oQ?e=Wmp1Mr&CID=9ace3d4c-3c26-a771-e9b4-3e5d57e60bc9 Marcy's Gantt]] * 4/17 - 5/1: Marcy
    2 KB (231 words) - 12:43, 19 March 2023
  • * Marcy: functional form dependence on Mott fitting [[File:Pade_22Jan2016.pdf]]
    370 bytes (53 words) - 16:00, 21 January 2016
  • [[media:marcy retreat discussion.pptx]]
    417 bytes (56 words) - 16:07, 2 February 2017
  • * Marcy, draft tech note extrapolation: [[media:Extrapolation6Feb2017.docx]]
    300 bytes (44 words) - 15:50, 6 February 2017
  • === Phil/Marcy discussed count of components needs in MeV section, good news relatively li
    1,021 bytes (164 words) - 20:12, 24 January 2018
  • *NEG ZAO modules have been installed and wired by Marcy Stutzman ...o ensure there are no leaks, and that the NEG modules are not shorted out. Marcy installed an extractor gauge for vacuum monitoring after bake.
    1 KB (188 words) - 07:39, 5 October 2022
  • ...vs. energy for H2, CH4, and CO. These were weighted by gas pressures from Marcy's presentation last week.
    881 bytes (129 words) - 14:42, 24 March 2020
  • #Marcy
    345 bytes (54 words) - 09:59, 15 February 2024
  • : Marcy - Fitting update [[media:24Feb2017ExtrapolationUpdate_v2.pdf]] : Marcy - target ladder
    1 KB (177 words) - 15:17, 27 February 2017
  • #**4 10 kV SHV feedthroughs. (Marcy, do we have these?, how many?) #*Marcy dimension requests [[media:screens18gun.pptx]]
    1 KB (166 words) - 07:39, 21 April 2022
  • * (Marcy) Remake A2 joint * (Marcy) Replace harp
    1 KB (172 words) - 10:05, 9 September 2021
  • == Marcy/Phil - plans for the Y-chamber (NEG coating, NEG flange, IP, window) ==
    884 bytes (130 words) - 09:58, 10 October 2019
  • Attendees : Carlos, Mamun, Marcy, Riad, Joe * Marcy - list any UITF gun and beam line jobs or repairs to make photocathodes rel
    1,013 bytes (160 words) - 13:15, 20 July 2020
  • * Marcy's MolFlow TN - writing?
    1 KB (159 words) - 10:24, 2 August 2022
  • Marcy: Travel 17-22
    313 bytes (49 words) - 17:46, 16 September 2015
  • ; Marcy (5 min) - Vacuum beam line status (viewers, apertures, pumping) and post-ba ; Reza, Alica, Marcy, Yan, Dennis (30 min) - Beam commissioning plans: [[media:BeamINJphase1v4.p
    1 KB (180 words) - 16:06, 29 January 2021
  • #*Marcy, Joe mentioned installing this flange in the injector was a challenge: the #*Marcy, what are your conclusions on the HV chamber vacuum?
    2 KB (298 words) - 08:58, 13 April 2022
  • ; Marcy - mini-Mott recovery plan
    428 bytes (72 words) - 10:15, 7 June 2022
  • Marcy [[File:Fitting_Function_dependence.pdf]]
    508 bytes (70 words) - 12:49, 28 January 2016
  • ...grounded + flat & tilted + Gabriel will try electrostatic model with slots Marcy recommends for conductance # Marcy blow off new NEGs, install w/o ground screen, add NEG wiring, gauge, blank
    1 KB (176 words) - 23:22, 26 January 2022
  • * AVS Symposium, Charlotte NC, October 24-29 (Marcy) * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, Riad, Mamun)
    2 KB (214 words) - 06:37, 25 August 2021
  • At today's meeting Marcy summarizes the measurements and her analysis. We'll discuss what is neede
    420 bytes (59 words) - 14:03, 30 August 2021
  • * Marcy - On-call report * AVS Symposium, Charlotte NC, October 24-29 (Marcy)
    2 KB (299 words) - 09:05, 18 August 2021
  • **Marcy - Description of vacuum - Molflow simulations and ion pumps
    453 bytes (67 words) - 20:07, 1 October 2020
  • # Update by Marcy on Degrader installation
    607 bytes (88 words) - 07:59, 4 April 2024
  • * AVS Symposium, Charlotte NC, October 24-29 (Marcy) * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, Riad, Mamun)
    3 KB (361 words) - 08:23, 1 September 2021
  • == Friday, October 23 SWING (Tim, Marcy) == Started shift with white board tool-box meeting (Tim, Daniel, Matt, Marcy, Riad, Joe). The look up [https://logbooks.jlab.org/entry/3355838 table] o
    3 KB (468 words) - 17:20, 24 October 2015
  • #* It is awaiting vacuum degassing at 400 C for as long as possible (Marcy? Phil?) #* Marcy, could you please check with ohm-meter to make sure screen is not shorting
    3 KB (443 words) - 08:05, 22 June 2022
  • * [[8/27/21 - JLab-Euclid meeting]] - Marcy presents results of summer beam tests on diamond targets
    475 bytes (58 words) - 08:16, 27 August 2021
  • ## NEG screens: what is needed to finalize the design? Marcy, Shaun
    589 bytes (92 words) - 11:16, 28 March 2022
  • * Diamond Mott beam test #1, how do we analyze data, Riad or Marcy analysis training? Phil, rebuild 3" spool/nipple? * UITF schedule meeting just after 1:30 today...Shukui, Carlos, Max, Marcy, Phil
    2 KB (352 words) - 09:39, 4 August 2021
  • * Marcy - remaining vacuum tasks, harp done?, chopper valve/bake region ...IMEKO TC16 7th International Conference on Pressure and Vacuum Metrology (Marcy)
    1 KB (174 words) - 10:47, 18 April 2023
  • * Matt's PV - graphics from Joe Wien, Marcy Molflow, Riad PV * Marcy mini-Mott
    1 KB (222 words) - 10:36, 5 July 2022
  • * Marcy or Mamun - Jobs when venting Prep chamber
    587 bytes (88 words) - 12:59, 16 October 2020
  • **Two simulations used a constant H2 density of 10^17 and two used Marcy's H2 density profile for CEBAF from Molflow.
    1 KB (236 words) - 11:42, 3 August 2020
  • * AVS Symposium, Charlotte NC, October 24-29 (Marcy) * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, Riad, Mamun)
    2 KB (226 words) - 09:48, 22 July 2021
  • * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, ...) ; Status on partner projects - next week when Marcy is back in town
    2 KB (237 words) - 09:57, 23 June 2021
  • * Marcy - select gold targets * Marcy - any tech note on thickness, statistics, target and beam scans?
    1 KB (216 words) - 16:18, 19 March 2021
  • * Carlos/Marcy - working mostly on UITF beam line (gun & depo)
    598 bytes (82 words) - 14:18, 25 September 2020
  • ** Marcy, Riad, Joe - Writing TN on the Mott chamber assembly [[media:MottConstructi # (Tim, Marcy, Dan) Complete experimental asymmetry vs. target thickness for Runs I/II; s
    2 KB (228 words) - 09:24, 13 May 2016
  • * Marcy/Phil gun chamber vacuum work : NEG coat, when 1400's arrive, ports assigned
    662 bytes (93 words) - 21:12, 19 October 2021
  • * NEG screens - Marcy ** Marcy to meet with Shaun
    3 KB (412 words) - 11:43, 17 March 2022
  • ...the wire option for the anode and tube. We'll use 1 mm thick Cu wire that Marcy has used before, adding a strain relief. #*Weaved wire mesh that Marcy prefers: 0.88 mm wire diameter, 0.5 inch square opening is in Bubba's offic
    2 KB (381 words) - 13:05, 16 May 2022
  • 2. Marcy - Target thickness and extrapolation method [[Media:FESEM_uncertainty_effec
    797 bytes (115 words) - 17:19, 17 December 2015
  • #Marcy will work with Danny to select and finalize two kapton coated K type thermo
    692 bytes (109 words) - 17:38, 6 June 2021
  • * When Phase II vac/HV jobs ramp down - test UCSB/RIT samples @ UITF? (Phil, Marcy, Jessica, Carlos, Mamun) ...IMEKO TC16 7th International Conference on Pressure and Vacuum Metrology (Marcy)
    2 KB (234 words) - 10:47, 2 May 2023
  • 4. Time permitting: Marcy - summary of thickness uncertainties, dependence of Ao on fitting function
    714 bytes (101 words) - 21:27, 16 February 2016
  • Marcy - Target thickness
    759 bytes (109 words) - 11:42, 27 March 2015
  • Marcy: [[File:Marcy_15March2016.pdf]]
    724 bytes (101 words) - 10:56, 15 March 2016
  • Both Dan and Marcy are making great progress respectively on the analysis and target thickness
    810 bytes (114 words) - 13:30, 29 July 2015
  • :(Marcy/Tim/Riad) Status of fitting asymmetry vs. thickness and rate:corrected vers :(Joe/Marcy/Riad) Technical Description of the CEBAF Mott Polarimeter and Detector Chai
    3 KB (401 words) - 12:28, 6 February 2017
  • 1. Marcy - update on target thickness
    828 bytes (117 words) - 13:21, 12 August 2015
  • * Marcy/Bubba/Phil - path forward on vacuum chamber modification/assembly
    824 bytes (120 words) - 15:53, 16 November 2021
  • *Marcy/Carlos - sent drawings of the CEBAF photogun & anode
    622 bytes (96 words) - 17:57, 20 July 2020
  • * 200 kV gun job at UITF (Marcy, Jessica, Phil, Carlos), * Update on the R&D in GTS (Gabriel) and TL1137 (Mamun, Marcy),
    2 KB (264 words) - 11:30, 13 December 2022
  • * Marcy's Gantt chart goes here => https://jeffersonlab-my.sharepoint.com/:x:/g/per
    3 KB (441 words) - 09:37, 15 April 2024
  • 1 Viewer assembly fixture => Marcy, do you really need this, or skip? 2 Will NEG fit 25 l/sec IP on Y => Marcy, do you need any help?
    2 KB (246 words) - 11:16, 8 October 2020
  • #*Marcy has 3 of the 10 kV SHV feedthroughs. #*Bubba ordered more weaved wire mesh that Marcy prefers: 0.88 mm wire diameter, 0.5 inch square opening
    2 KB (312 words) - 08:45, 27 April 2022
  • #Marcy (QE scan)
    796 bytes (126 words) - 12:00, 9 April 2014
  • #Marcy, find the y-chamber in UITF, have it degassed, recommend a pump configurati #Marcy investigate precision linear vacuum actuators...are there other options to
    2 KB (322 words) - 09:44, 13 June 2019
  • ...h - H2, CH4, CO - cross-sections vs. energy, and weighted by gas densities Marcy showed last week [[:File:ICSPlot_H2CH4CO.png | ICS vs Beam Energy]], [[:Fil
    980 bytes (139 words) - 15:51, 24 March 2020
  • == Friday, October 23 SWING (Tim, Marcy) == Started shift with white board tool-box meeting (Tim, Daniel, Matt, Marcy, Riad, Joe). The look up [https://logbooks.jlab.org/entry/3355838 table] o
    6 KB (856 words) - 18:04, 18 May 2018
  • ...roup Leader), Steve Covert, Phil Adderley, Riad Suleiman, John Hansknecht, Marcy Stutzman, Joe Grames.]]
    1 KB (172 words) - 19:03, 29 May 2014
  • # Mamun/Marcy - status of sibling target thickness measurements
    868 bytes (132 words) - 14:10, 18 December 2014
  • *Marcy will use MolFlo to estimate the vacuum isolation of each dif pump design, a *Next meeting should include Phil, Marcy, Alicia, Yan and Reza. Matt will distribute the drawings I get from Gary.
    2 KB (400 words) - 14:35, 4 June 2021
  • Present: Alicia, Reza and Yan, Marcy and Joe, Gary, Shaun and Danny, and Lakshmi
    868 bytes (150 words) - 12:54, 29 April 2021
  • ...the status of the theory input and Xavier should be able to join too. If Marcy is ready we'll have a first peek at the complete target thickness measureme
    855 bytes (140 words) - 09:09, 11 May 2015
  • ...the status of the theory input and Xavier should be able to join too. If Marcy is ready we'll have a first peek at the complete target thickness measureme
    856 bytes (140 words) - 09:10, 11 May 2015
  • * Cat 2 PPE gear ordered for Joe, Bubba, Carlos, Marcy, Riad => pick-up on Thursday (otherwise 2 week delivery time)
    857 bytes (128 words) - 17:12, 25 August 2020
  • * Marcy
    905 bytes (137 words) - 10:35, 10 March 2023
  • #Phi/Marcy, can you confirm Danny's parts list, set them aside when found? '''=> Phil, #Marcy, can you look at heating blankets for this geometry, good idea? '''=> come
    2 KB (388 words) - 09:15, 21 June 2019
  • * CEBAF "200 kV" jobs (Marcy's vacuum "hook-ups", Carlos' HV Conditioning TOSP, Phil's plans for the har
    2 KB (320 words) - 08:29, 7 February 2023
  • # Marcy, Tim, Daniel, ...
    1 KB (152 words) - 11:46, 13 August 2016
  • **Description: Marcy sent vacuum simulation data for H2 and CO for the CEBAF photogun through th
    941 bytes (139 words) - 15:06, 24 March 2020
  • From Marcy - We have decided that we would like to install a new manipulator to replac From Marcy - Those are the uitf ones from the FEL - are we looking for the ones we use
    3 KB (452 words) - 09:49, 26 March 2020
  • : (MARCY) After all of the above are done, pursue your "prediction" studies, e.g., : (MARCY) - target ladder
    4 KB (536 words) - 16:11, 20 February 2017
  • ** 4/17 - 5/1: Marcy * Marcy's schedule...
    4 KB (625 words) - 08:29, 17 March 2023
  • * 9/15/2021 Marcy options for how NEG's might be mounted [[media:UHV1400MountV2.pptx]]
    1 KB (168 words) - 09:38, 31 March 2022
  • ...t thickness - Mamun completed various measurements of the Run 1 siblings. Marcy has been analyzing the FESEM images, organizing the metrics and will presen
    1 KB (192 words) - 10:15, 8 June 2015
  • * Marcy presented vacuum simulations of the CEBAF photogun and beamline. These simu
    1 KB (151 words) - 14:11, 24 March 2020
  • * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, Riad, Mamun)
    1 KB (176 words) - 09:57, 14 July 2021
  • * Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shiel * Marcy get quotes on A1/A2 cubes and 6-way cross w/ R-R
    3 KB (421 words) - 17:15, 2 April 2020
  • 6. Marcy/Shukui/Joe - Characterization tests of GaAs/GaAsP, DBR, Sb-cathode
    1 KB (171 words) - 13:30, 10 August 2015
  • * Marcy
    993 bytes (151 words) - 10:22, 15 January 2020
  • *Marcy presented graphs of outgassing - i.e. where do ions/gas go once formed? Do
    1 KB (191 words) - 16:25, 16 April 2020
  • * Marcy is checking on metallized YAG screen w/ hole
    953 bytes (157 words) - 15:42, 21 January 2020
  • * Joe - do we have all ion pumps and valves per model? => '''Marcy's first pass, but needs to see model again''' [[media:200320_ion pumps and
    3 KB (486 words) - 09:18, 2 April 2020
  • * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, Riad, Mamun)
    1 KB (171 words) - 07:59, 7 July 2021
  • '''[[Marcy Stutzman]]''' x7073
    1 KB (170 words) - 12:26, 22 May 2023
  • *a note to phil and marcy, on the real assembly work, the bottom and right side of the cube are no pr
    1 KB (210 words) - 15:29, 14 June 2021
  • * Marcy
    2 KB (215 words) - 11:42, 11 September 2020
  • 1) Benefits of NEG coating, toward achieving XHV (POC, Marcy) 2) Potential benefits of cryopumping toward achieving XHV (POCs, Marcy, Anahi)
    3 KB (427 words) - 11:50, 9 February 2018
  • :Review Marcy/Daniel survey of injector IP power supplies [[media:190220_IP_Summary.xlsx]
    1 KB (206 words) - 17:46, 20 February 2019
  • [[Media:FE-SEM_first_results.pdf]]==(Mamun/Marcy) Update on target thickness measurements==
    941 bytes (130 words) - 15:13, 13 February 2015
  • 6) Fit-a-thon begins (Riad=Root, Marcy=Mathematica) applying Pade and Marty functions
    1 KB (176 words) - 12:41, 4 January 2017
  • # (Daniel, Riad, Tim, Marcy) Corroborate the Lebow and FESEM measurements with foil rate measurements t
    2 KB (230 words) - 13:58, 19 November 2015
  • 6) (STARTED) Fit-a-thon begins (Riad=Root, Marcy=Mathematica) applying Pade and Marty functions
    1 KB (190 words) - 17:08, 11 January 2017
  • * vacuum chamber w/ small bread board => '''Marcy/Phil located ready in 1137'''
    1 KB (154 words) - 13:57, 6 October 2020
  • #Marcy, find the y-chamber in UITF, have it degassed, recommend a pump configurati #Marcy investigate precision linear vacuum actuators...are there other options to
    3 KB (541 words) - 13:47, 6 June 2019
  • 6) (WORKING) Fit-a-thon begins (Riad=Root, Marcy=Mathematica) applying Pade and Marty functions [[media:AoExtrapolation23Jan
    2 KB (214 words) - 14:54, 23 January 2017
  • * Marcy - From last's meeting's post => [[media:21Feb2020Vacuum.xlsx]]
    2 KB (240 words) - 15:50, 24 March 2020
  • ** (Tim, Marcy, Dan) Complete experimental asymmetry vs. target thickness for Runs I/II; s
    1 KB (199 words) - 13:08, 11 April 2016
  • * Marcy is checking on metallized YAG screen w/ hole => ?
    1 KB (221 words) - 21:08, 22 January 2020
  • ** Marcy's final list [[media:210209_ion pump names.xlsx]]
    3 KB (511 words) - 12:33, 22 February 2021
  • ...took additional measurements; discussed preliminary action plan with Joe.G/Marcy and Phil. :Was put on hold yesterday ( Phil /Marcy prefers baking without clamp shell)
    7 KB (1,131 words) - 11:08, 11 January 2021
  • ...2.75" for the conductance limiting aperture, pack of 10) - Copy from Matt/Marcy's req queue.(Completed)
    4 KB (503 words) - 16:26, 4 May 2021
  • ...2.75" for the conductance limiting aperture, pack of 10) - Copy from Matt/Marcy's req queue.(Completed)
    4 KB (503 words) - 16:25, 4 May 2021
  • ;Marcy/Phil, can you make a tally/description of all the viewers we have at the in
    2 KB (291 words) - 08:44, 15 August 2019
  • 1 Viewer assembly fixture => Marcy has one, would like if a lighter color 2 Will NEG fit 25 l/sec IP on Y => Marcy will check, ask for ENG help if needed
    3 KB (495 words) - 10:41, 15 October 2020
  • ::a. Hose clamps for v-blocks – DONE – Marcy ::b. Angles cut for Y-girder – DONE –Marcy
    5 KB (777 words) - 08:59, 20 November 2020
  • ...leiman, Phil Adderley, Max Bruker, Gabriel Palacios-Serrano, Steve Covert, Marcy Stutzman, Andriy Ushakov, Md. Al Mamun, Shukui Zhang. Not pictured Carlos
    2 KB (289 words) - 10:39, 1 August 2023
  • # Marcy, Riad, Joe, complete adding material to the "Mott Construction" TN on today
    1 KB (228 words) - 11:51, 13 June 2016
  • ::a. Hose clamps for v-blocks – DONE – Marcy ::b. Angles cut for Y-girder – DONE –Marcy
    5 KB (794 words) - 11:55, 17 December 2020
  • ** Carlos coordinates with Marcy availability of one mirror puck, and one puck with GaAs wafer
    2 KB (289 words) - 16:33, 26 March 2024
  • 3. Marcy - Plan A for vacuum can/diagnostics at gun3 valve, what is useful and makes
    2 KB (253 words) - 10:19, 13 March 2017
  • * Marcy - 40% RSR, 20% R&D, 20% EIC
    2 KB (250 words) - 09:11, 22 March 2022
  • # (Daniel, Riad, Tim, Marcy) Corroborate the Lebow and FESEM measurements with foil rate measurements t
    2 KB (264 words) - 21:17, 28 October 2015
  • # (Marcy) Check Mott vacuum, configuration (hipot 3D01 again?)
    1 KB (221 words) - 07:21, 7 October 2015
  • #*Marcy and Carlos looked at the screen sections fit inside the HV chamber, Carlos
    2 KB (304 words) - 15:17, 17 May 2022
  • * Marcy - test YAG resistance
    2 KB (267 words) - 13:47, 16 August 2022
  • : Once Marcy/Phil give OK on 3I vacuum => John, you can remove VBV3I02 from special inte
    2 KB (279 words) - 10:29, 2 June 2017
  • ...took additional measurements; discussed preliminary action plan with Joe.G/Marcy and Phil. :Was put on hold yesterday ( Phil /Marcy prefers baking without clamp shell)
    9 KB (1,355 words) - 11:01, 21 January 2021
  • * Ben Belfore from ODU arrives soon for photocathodes, Marcy? or Matt? will supervise
    2 KB (253 words) - 13:10, 14 October 2021
  • ::a. Hose clamps for v-blocks – DONE – Marcy ::b. Angles cut for Y-girder – DONE –Marcy
    6 KB (898 words) - 09:19, 7 January 2021
  • * Phil/Marcy starting to NEG coat vacuum chambers; need a 1kW sputtering PS that works (
    2 KB (303 words) - 15:02, 4 February 2020
  • #) Next meeting: invite Joe, Marcy, Phil, Reza, Alicia and Yan
    2 KB (354 words) - 10:09, 9 April 2021
  • * Photocathode Physics for Photoinjectors, SLAC, November 10-12, 2021 (Marcy, Carlos, ...)
    2 KB (292 words) - 21:11, 29 June 2021
  • ** Marcy to calculate how many UHV 1400 NEG wafer modules are needed, based on this,
    2 KB (326 words) - 12:36, 31 March 2022
  • * Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shiel * Marcy get quotes on A1/A2 cubes and 6-way cross w/ R-R
    6 KB (836 words) - 09:26, 9 April 2020
  • : Oct ?-?, (Carlos/Marcy program committee), Photocathode Physics for Photoinjectors Workshop, Brook
    2 KB (349 words) - 09:14, 30 May 2023
  • *** Final thickness measurments from Marcy.
    3 KB (397 words) - 17:07, 25 August 2016
  • # Finish the straight ahead waist height MeV beamline: Phil/Marcy bake the short section near QCM and remove the clean hood. Start building
    2 KB (353 words) - 09:50, 22 June 2018
  • ...took additional measurements; discussed preliminary action plan with Joe.G/Marcy and Phil. :Was put on hold yesterday ( Phil /Marcy prefers baking without clamp shell)
    10 KB (1,600 words) - 11:03, 28 January 2021
  • * Marcy write ATLIS: https://opsweb.acc.jlab.org/CSUEApps/atlis/task/23934
    2 KB (377 words) - 18:30, 18 January 2022
  • * Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shiel * Marcy get quotes on A1/A2 cubes and 6-way cross w/ R-R
    6 KB (898 words) - 07:42, 16 April 2020
  • Danny, Shaun, Gary, Grames, Marcy, Poelker, Reza, Alicia
    2 KB (397 words) - 11:51, 14 April 2021
  • * Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shiel * Marcy get quotes on A1/A2 cubes and 6-way cross w/ R-R
    6 KB (916 words) - 08:55, 23 April 2020
  • *Phil/Marcy have ceramics/NEG wire Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    5 KB (816 words) - 18:52, 1 July 2020
  • ** Marcy's final list [[media:210209_ion pump names.xlsx]]
    7 KB (1,058 words) - 20:59, 4 May 2021
  • ...f companion foils, our x-axis error bar (Mamun finished with measurements, Marcy completing analysis)
    3 KB (416 words) - 21:00, 13 August 2015
  • *Phil/Marcy have ceramics/NEG wire Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    5 KB (851 words) - 18:52, 1 July 2020
  • ..., Phil Adderley, John Hansknecht, Reza Kazimi, Matt Poelker, Daniel Moser, Marcy Stutzman, R. Suleiman Shukui Zhang "Milliampere beam studies using high pol
    3 KB (414 words) - 17:30, 6 December 2019
  • * Marcy Stutzman "Ultra and Extreme High Vacuum" [[media:UHV_XHV_LBL.pdf]] ; JLAAC talks from Matt, Joe, Marcy and Carlos, October 21-23, 2020
    19 KB (2,496 words) - 15:59, 2 January 2024
  • ...t's populate the new Zimbra calendar resource. Email Carlos, Matt, Joe or Marcy you planned activity, they will put it on the calendar. Do we want represe
    3 KB (449 words) - 09:27, 18 December 2017
  • * Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shiel * Marcy get quotes on A1/A2 cubes and 6-way cross w/ R-R
    7 KB (1,094 words) - 09:35, 30 April 2020
  • ...reens at TBD locations, metal markings on rear, metalized face for charge, Marcy getting bids from Radiabeam * Phil/Marcy starting to NEG coat vacuum chambers; need a 1kW sputtering PS that works (
    6 KB (968 words) - 13:36, 21 February 2020
  • ...reens at TBD locations, metal markings on rear, metalized face for charge, Marcy getting bids from Radiabeam * Phil/Marcy starting to NEG coat vacuum chambers; need a 1kW sputtering PS that works (
    6 KB (969 words) - 13:25, 13 February 2020
  • * Re-arrange the components near HDIce (Phil, Marcy, Shaun, matt)
    3 KB (473 words) - 08:37, 20 May 2019
  • *(Marcy, find or buy the pump) Replace the ion pump at the chopper chamber
    3 KB (450 words) - 13:37, 19 November 2020
  • * Marcy and Carlos are updating the schedule for removing the solenoid NEG tube, ad
    3 KB (564 words) - 09:52, 15 April 2024
  • :* Jun'23 - CBE (Marcy)
    3 KB (473 words) - 14:32, 4 April 2023
  • : Align floppy mask to puck on heater, fix mask (comments: Marcy and Mamun looked at the mask assembly, the two screws that hold the mask on
    4 KB (647 words) - 19:30, 25 May 2021
  • *Phil/Marcy have ceramics/NEG wire Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    7 KB (1,070 words) - 11:14, 9 July 2020
  • ;Marcy - list any UITF gun and beam line jobs or repairs to make photocathodes rel
    3 KB (516 words) - 15:43, 7 August 2020
  • 1 Viewer assembly fixture => Marcy has one, would like if a lighter color 2 Will NEG fit 25 l/sec IP on Y => Marcy will check, ask for ENG help if needed
    7 KB (1,182 words) - 22:27, 22 October 2020
  • Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    3 KB (549 words) - 09:53, 28 May 2020
  • '''3. Marcy - Plan A for vacuum can/diagnostics at gun3 valve, what is useful and makes
    4 KB (575 words) - 10:29, 23 March 2017
  • 1 Viewer assembly fixture => Marcy has one, would like if a lighter color 2 Will NEG fit 25 l/sec IP on Y => Marcy will check, ask for ENG help if needed
    8 KB (1,328 words) - 16:54, 25 October 2020
  • Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    3 KB (570 words) - 09:57, 4 June 2020
  • :-IPs, Marcy has as-is tally, should be OK, may need to order couple small pumps
    4 KB (565 words) - 11:07, 13 January 2020
  • ...reens at TBD locations, metal markings on rear, metalized face for charge, Marcy getting bids from Radiabeam * Phil/Marcy starting to NEG coat vacuum chambers; need a 1kW sputtering PS that works (
    8 KB (1,258 words) - 13:54, 9 March 2020
  • b) Marcy submitted [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/17278 ATLIS task]
    4 KB (657 words) - 06:42, 31 March 2017
  • *Phil/Marcy have ceramics/NEG wire Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    8 KB (1,278 words) - 11:06, 16 July 2020
  • ..., Deewakar Poudel, Greg Blume, Stephen Polly, Erdong Wang, Seth M Hubbard, Marcy Stutzman, Joseph Michael Grames, Matt Poelker, Matt Grau, Sylvain Marsillac * Xincun Peng, Matt Poelker, Marcy Stutzman, Bin Tang, Shukui Zhang, and Jijun Zou, "''Mie-type GaAs nanopilla
    25 KB (3,462 words) - 19:19, 11 March 2024
  • * Order collars, Marcy on short bolts * sorted through all my deliveries, gave some stuff to phil and marcy.
    16 KB (2,544 words) - 11:27, 27 August 2020
  • * Order collars, Marcy on short bolts * sorted through all my deliveries, gave some stuff to phil and marcy.
    16 KB (2,612 words) - 09:39, 3 September 2020
  • * Order collars, Marcy on short bolts * sorted through all my deliveries, gave some stuff to phil and marcy.
    16 KB (2,621 words) - 06:22, 10 September 2020
  • Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    4 KB (638 words) - 11:04, 11 June 2020
  • 1 Viewer assembly fixture => Marcy has one, would like if a lighter color 2 Will NEG fit 25 l/sec IP on Y => Marcy will check, ask for ENG help if needed
    10 KB (1,604 words) - 09:10, 30 October 2020
  • Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    4 KB (645 words) - 06:12, 18 June 2020
  • * Order collars, Marcy on short bolts * sorted through all my deliveries, gave some stuff to phil and marcy.
    18 KB (2,981 words) - 16:02, 23 September 2020
  • * Marcy checking on top hat configuration for Y-chamber [[media:200326_viewer shiel * Marcy get quotes on A1/A2 cubes and 6-way cross w/ R-R
    11 KB (1,760 words) - 09:21, 7 May 2020
  • * Marcy vacuum bake 400 C gun/y-chamber *Phil/Marcy have ceramics/NEG wire
    13 KB (2,189 words) - 10:58, 13 August 2020
  • * Marcy vacuum bake 400 C gun/y-chamber *Phil/Marcy have ceramics/NEG wire
    14 KB (2,198 words) - 07:21, 20 August 2020
  • *Phil/Marcy have ceramics/NEG wire Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    10 KB (1,640 words) - 11:09, 30 July 2020
  • * Order collars, Marcy on short bolts * sorted through all my deliveries, gave some stuff to phil and marcy.
    20 KB (3,225 words) - 10:02, 1 October 2020
  • 1 Viewer assembly fixture => Marcy has one, would like if a lighter color 2 Will NEG fit 25 l/sec IP on Y => Marcy will check, ask for ENG help if needed
    13 KB (2,135 words) - 11:22, 5 November 2020
  • :[[media: Marcy's molflo simulations imagining a beamline accident at HDIce.pptx]]
    19 KB (2,566 words) - 14:25, 13 February 2023
  • *Phil/Marcy have ceramics/NEG wire Plan for the upcoming SAD and injector rebuild (Grames, Adderley, Marcy, Carlos, , Bubba, Windham)
    13 KB (2,049 words) - 19:07, 6 August 2020
  • * Marcy Stutzman, Charles Hetzel, "Pressure Simulations for the EIC Interaction Reg * Wei Lui, Matt Poelker, Shukui Zhang, Marcy Stutzman, "Spin Polarization Sensitivity of Electrons Emitted from Bulk GaA
    28 KB (3,894 words) - 10:52, 3 January 2024
  • 1 Viewer assembly fixture => Marcy has one, would like if a lighter color 2 Will NEG fit 25 l/sec IP on Y => Marcy will check, ask for ENG help if needed
    18 KB (2,917 words) - 12:13, 12 November 2020
  • * Return gun valve config to "normal" (Marcy) * Laser/Y-Chamber viewer for Y-chamber girder (Marcy)
    113 KB (16,078 words) - 16:19, 23 May 2021