Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 250 results in range #1 to #250.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. 'Stabbing the cryoconda' September 26 2018
  2. 02/16/16 Meeting Analysis Follow-Up
  3. 1/18/19
  4. 1/9/18
  5. 1/9/19
  6. 10-10-18 meeting notes
  7. 10-3-18 meeting notes
  8. 10/1/18
  9. 10/17/18
  10. 10/9/18
  11. 11/1/18
  12. 11/11/18
  13. 11/15/19
  14. 12/4/18
  15. 1497 MHz choppers
  16. 18" Photogun ala GTS
  17. 18" Photogun with flat electrode front face and CEBAF anode
  18. 18" gun build status as of October 04 2022
  19. 18" high voltage chamber history
  20. 2/18/19
  21. 2/26/19
  22. 2/26/21 - Bi-weekly meeting
  23. 200KV 15 deg dipole
  24. 200KV gun BPM's
  25. 200 kV Gun - Jan 26, 2022
  26. 200 kV Gun Installation
  27. 200 kV NEG Coated BPM's
  28. 200 kV Polarized Gun
  29. 200 kV gun
  30. 200kV High Voltage Power Supply & Controls
  31. 200kV High Voltage Power Supply Controls
  32. 200kV PSS Kicker
  33. 200kV Prebuncher
  34. 200kV Quadrupoles
  35. 200kV Wien Filter
  36. 200kV Wien filter - FINAL
  37. 200kV Wien filter - V1
  38. 200kV Wien filter - V2
  39. 200kV Wien filter - V3
  40. 2018 Mott Paper Working Area
  41. 2020 Steel Shield Experiments at GTS
  42. 2021-01-07
  43. 2021-01-14
  44. 2021-01-26
  45. 2021-01-27
  46. 2021-02-03
  47. 2021-02-10
  48. 2021-02-24
  49. 2021-03-17
  50. 2021-03-24
  51. 2021-03-31
  52. 2021-04-07
  53. 2021-04-14
  54. 2021-04-21
  55. 2021-04-28
  56. 2021-05-04
  57. 2021-05-12
  58. 2021-05-19
  59. 2021-05-26
  60. 2021-06-09
  61. 2021-06-16
  62. 2021-06-23
  63. 2021-07-07
  64. 2021-07-14
  65. 2021-07-21
  66. 2021-07-28
  67. 2021-08-04
  68. 2021-08-11
  69. 2021-08-18
  70. 2021-08-25
  71. 3/13/19
  72. 3/19/21 - Bi-weekly meeting
  73. 3/9/19
  74. 4/13/23 -- Target power limits -- Max, Silviu, Andriy, Victor
  75. 4/23/19
  76. 4/7/20
  77. 5/11/23 -- Scope updates following pre-proposal submission -- Max, Silviu, Andriy, Victor
  78. 5/18/23 -- Making beam at LERF -- Max, Steve Benson, Joe Gubeli
  79. 5/20/19
  80. 5/24/18
  81. 5/25/18
  82. 5/28/18
  83. 5/30/18
  84. 5/4/20
  85. 6/1/18
  86. 6/11/18
  87. 6/14/18
  88. 6/14/19
  89. 6/18/18
  90. 6/22/18
  91. 6/25/18
  92. 6/27/18
  93. 6/4/21 - Planning meeting
  94. 6/7/18
  95. 7/13/18
  96. 7/23/18
  97. 7/9/18
  98. 8-15-18 meeting notes
  99. 8-15-18 notes
  100. 8-29-18 meeting notes
  101. 8-8-18 meeting notes
  102. 8-8-18 notes
  103. 8/15/18
  104. 8/22/18
  105. 8/27/18
  106. 8/27/21 - JLab-Euclid meeting
  107. 8/6/18
  108. 8/8/18
  109. 9-20-18 meeting notes
  110. 9-26-18 meeting notes
  111. 9-27-18 meeting notes
  112. 9-5-18 meeting notes
  113. 9/14/18
  114. 9/6/18
  115. 9/8/21
  116. A1/A2 Aperture Steering Cubes
  117. A1 Aperture Motor Control
  118. ACC2003000-0310 REV A SHT 1.pdf
  119. AESOP optical polarimeter LDRD proposal
  120. AIPINJ - CED
  121. AIPINJ - Layouts
  122. AIPINJ - Phase 1 and 2 Schedule
  123. AIPINJ - Phase 2 Layouts
  124. AIPINJ - Phase 2 Upgrade Meetings
  125. AIPINJ - S&A Transmittals
  126. AIPINJ - Upgrade Meetings
  127. AIPINJ Layouts
  128. Absolute Beam Energy
  129. Accelerator Experimental Review
  130. Accelerator PQB Meetings
  131. Accelerator Test Review
  132. Adeleke Adeyemi
  133. Airline Valve Changeout
  134. Analysis Campaigns
  135. Anode
  136. Anode flange prints and pictures
  137. Apparatus
  138. Apr 03 2024
  139. Apr 1, 2020 Meeting Minutes
  140. Apr 10, 2020 Meeting Minutes
  141. Apr 10 2024
  142. Apr 17, 2020 Meeting Minutes
  143. Apr 17 2024
  144. Apr 18, 2023 - CIS Group Meeting
  145. Apr 24, 2020 Meeting Minutes
  146. Apr 3, 2020 Meeting Minutes
  147. Apr 4, 2023 - CIS Group Meeting
  148. Apr 4, 2024 - CIS Group Meeting
  149. April 1, 2016 - Positron LDRD
  150. April 10, 2013
  151. April 10, 2018 - HVPS/PSS planning meeting
  152. April 11, 2018 - CEBAF Darklight Meeting
  153. April 11, 2019 - Weekly AIPINJ Meeting
  154. April 12, 2017 - Group Meeting
  155. April 12, 2018 - Large SAD Planning Meeting
  156. April 13, 2022 - HV chamber layout for installation in CEBAF
  157. April 14, 2017 - 200kV gun upgrade meeting
  158. April 16, 2015 - 3-Laser/4-Laser Discussion
  159. April 16, 2020 - ME/INJ/CIS/CASA
  160. April 17, 2020 - Modeling
  161. April 17, 2020 - PSS Kicker
  162. April 18, 2019 - Weekly AIPINJ Meeting
  163. April 19, 2022 - Group meeting
  164. April 2, 2020 - ME/INJ/CIS/CASA
  165. April 20, 2016 - Positron LDRD
  166. April 21, 2017 - 200kV gun upgrade meeting
  167. April 21, 2022 - HV chamber layout for installation in CEBAF
  168. April 24, 2015 - Mott Group Meeting
  169. April 24, 2019 - QIS FOA
  170. April 24, 2020 - ME/INJ/CIS/CASA
  171. April 25, 2019 - Weekly AIPINJ Meeting
  172. April 26, 2022 - Group meeting
  173. April 26, 2022 - updates
  174. April 28, 2016 - Mott Group Meeting
  175. April 3, 2015 - Mott Group Meeting
  176. April 30, 2014
  177. April 30, 2020 - ME/INJ/CIS/CASA
  178. April 6, 2016 - Monthly 4-laser Upgrade Status Meeting
  179. April 6, 2017 - Photocathode chapter
  180. April 6, 2022 - HV chamber ME jobs
  181. April 7, 2016 - Mott Group Meeting
  182. April 7, 2017 - 200kV gun upgrade meeting
  183. April 8, 2016 - Positron LDRD
  184. April 9, 2014
  185. April 9, 2020 - ME/INJ/CIS/CASA
  186. Archived Documents
  187. Aug 16, 2022 - Group meeting
  188. Aug 18, 2021 - Group Meeting
  189. Aug 19, 2020
  190. Aug 2, 2022 - Group meeting
  191. Aug 25,, 2021 - Group Meeting
  192. Aug 26, 2020
  193. Aug 4, 2021 - Group Meeting
  194. August 1, 2019 - Weekly AIPINJ Meeting
  195. August 10, 2015 - CEBAF/LERF
  196. August 12, 2015 - Mott Group Meeting
  197. August 12, 2016 - Mott Group Meeting
  198. August 13, 2014 - Mott Group Meeting
  199. August 13, 2020 - ME/INJ/CIS/CASA
  200. August 14, 2013
  201. August 14, 2014 - Group Meeting
  202. August 14, 2020 Meeting Minutes
  203. August 15, 2013 - EGG Startup and Commissioning
  204. August 15, 2019 - Weekly AIPINJ Meeting
  205. August 16, 2019
  206. August 19, 2019 - Weekly AIPINJ Meeting
  207. August 20, 2020 - ME/INJ/CIS/CASA
  208. August 21, 2013
  209. August 21, 2013 - PSTP outline/materials
  210. August 21, 2020 Meeting Minutes
  211. August 22, 2019 - Weekly AIPINJ Meeting
  212. August 23, 2013
  213. August 25, 2016 - Mott Group Meeting
  214. August 27, 2013
  215. August 27, 2014 - Group Meeting
  216. August 27, 2014 - Mott Group Meeting
  217. August 27, 2015 - CEBAF Injector Upgrade Meeting
  218. August 27, 2020 - ME/INJ/CIS/CASA
  219. August 28, 2020 Meeting Minutes
  220. August 29, 2019 - Weekly AIPINJ Meeting
  221. August 31, 2016 - Upgrading the HV Switchtank
  222. August 31, 2020 - AIPINJ Phase 1 Planning Meeting
  223. August 4, 2017 - Group Meeting UITF 350kV gun postmortem, discuss path forward
  224. August 6, 2014 - Mott Group Meeting
  225. August 6, 2020 - ME/INJ/CIS/CASA
  226. August 7, 2020 Meeting Minutes
  227. August 8, 2019 - Weekly AIPINJ Meeting
  228. August 9, 2019 - Weekly AIPINJ Meeting
  229. August of 2022
  230. AvT and AvR Fits and Residuals versus Percent Change in Cuts Boxes
  231. Availability
  232. Background
  233. Background and status as of July 1 2021
  234. Background papers
  235. Ball electrode drawings
  236. Beam Setup and Measurement - May 2018
  237. Beam line
  238. Beamline, Radiator and Dump
  239. Beamline Layout
  240. Beamline Layout Version 1
  241. Beamline element details
  242. Beamline for water sample irradiation
  243. Beamline support fixtures
  244. Beamline viewers
  245. Ben Hardy
  246. Biasing Supply with built in nano-ammeter
  247. Bob May describes overview of developing a new "Credited Control"
  248. Bob May describes overview of developing a new "Credited Control", from May 19, 2016
  249. Bob May describes the process of developing a new "Credited Control", from May 19, 2016
  250. Booster LLRF test plan

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)