Difference between revisions of "Talk:GTS meeting 4 5 16"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "* To protect the viewer crystal from beam damage: ** Ask Omar: ** To look at the GTS drive laser control chassis for DL trigger ** Is there a line-sync module? it is a logic l...")
(No difference)

Revision as of 14:45, 5 April 2016

  • To protect the viewer crystal from beam damage:
    • Ask Omar:
    • To look at the GTS drive laser control chassis for DL trigger
    • Is there a line-sync module? it is a logic level to trigger things
  • Magnet nomenclature