Talk:Gun Test Stand at LERF

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

== What do we need for connecting the beamline to the gunr? ==

  • Fixing the gun in its final position to the table
  • Install the anode
  • Install recently fabricated "viewer ports" anode flange
  • Install 4-1/2 inch valve between the anode flange and the beamline
  • The beamline height can be defined by the final height of the center line of the cathode, defined by gun-table assembly. We can then adjust the beamline height (80/20 adjustable feet) accordingly.
  • Can we do this with the existing beamline components before parts are ready to re-start high voltage testing? Who can do what? what help/assistance is needed? In parallel, we/I need to look for 2 DP cans...one more viewer screen, dump, steering coils, beampipe, hardware, what else???