To do list in preparation for water irradiation and final booster characterizations studies

From Ciswikidb
Revision as of 10:55, 7 July 2021 by Poelker (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

media:to do list at UITF for water irradiation studies 7_7_21.docx

Engineering support jobs

keV region:

  • [DC] Reconnect two steering magnet sets and solenoid on the NEG tube near the gun after the bakeout
  • [IC] Restore operation of ITVK202 and ITVK203 (at the Wien, if it were there). These channels were used for HDIce dump viewers ITVMA01A and B (might have names wrong)

MeV regions: Near FCup3:

  • [DC] Four corrector (2 sets) near dif pump station and FCup3, restore them:
    • MHBM401H/V between manual and fast valve – On beam line; requires connection
    • MHBM501H/V over bellows in from in IPMM501 – requires mounting and connection
  • [IC/VAC] Fast valve – Pull cable, interface locally and to VCG, mount electronics, and test

BCM + Current clamp receiver/chassis from Musson/Seaton

  • [IC/VAC] Power + Cable NEG VGPM401 on cross with VIPM401 [Software] Controls
  • [IC] ITVM401 connections, restore them. [software] Viewer is now a YAG.
  • [IC] FCup3 connections, restore them
  • [IC/VAC] VBVM501 connections, restore them
  • [LLRF] Yao cavity – Prototype receiver install + cable from LLRF [Software/LLRF] Controls
  • [Experiment] Place shielding around FC3 region

Spectrometer line:

  • [IC] IHAM703 was replaced, but need correct cable connections, verification it moves. Controls changes required for different harp style? If so - [software]
  • [IC/VAC] Power + Cable NEG added in front of IHAM703

New straight ahead line to water samples:

  • [IC/VAC] New valve VBVM602 – verify operation / hook up
  • Three new BPMs: IPMM602, IPMM603, and IPMM604
    • [IC] Verify connections and operation
    • [Software] Controls changes – Kyle working it already.
  • [DC] 3 new steering magnet sets: Verify & Polarity check installation. Update CED as appropriate.
    • MHBM602AH/V: ITF07 Channel 11/12 rerouted
    • MHBM602BH/V: ITF07 Channel 14 rerouted to vertical; Ch. 13 still needs rerouting to horizontal
    • MHBM603H/V: ITF07 Ch 17/18 rerouted
  • Also, secure loose magnet cables on that rack.
  • Solenoid –
    • [Install] Plumb LCW / Flow meter (from DC)
    • [DC] Power Supply, Cabling, Integration
    • [Software] EPICs contol
  • [IC] 2 new viewers: ITVM603 and ITVM604 – both YAG. Connect & interface.
  • [IC] FCup4 in/out
  • [IC] Video only channel at water sample area (Norris hooking up with Hannes Tuesday.)
  • Stepper motor controlled sample holder (Windham + Lu) – Mount after 80/20 table build [Experiment] and integrate
  • [Experiment] Build 80/20 shielding Table
  • [IC/Vacuum] Power + Cable NEG (x2): VGPM603 on cross with VIPM603. VGPM604 on cross with VIPM604A
  • [IC/Vacuum] VCGM604 Cathode Gauge – Cable, power, interface to EPICS
  • [Experiment] Place Decarad heads
  • [Experiment] Mount fluorescing screen after target

Safety System Group:

  • Relocate BLMs
  • Update gold masking
  • FSD for BCM Current clamp; from [IC]
  • FSD for Solenoid for [DC]

[ME] Design related:

  • Plate and 2”x2” support leg at FCup3
  • Camera holders: 2.75” and 4.625” flanges
  • Table for water sample holder (pictures for assembly)

[All system owners] Other: CED updates and verification for everything