Difference between revisions of "UITC Meeting - August 12, 2015"

From Ciswikidb
Jump to navigation Jump to search
 
Line 5: Line 5:
 
** Beam line height Cave 2 : 87.0" = 2.2098m
 
** Beam line height Cave 2 : 87.0" = 2.2098m
 
** QCM downstream valve from gun/keV beam line intersection : 9.3835m
 
** QCM downstream valve from gun/keV beam line intersection : 9.3835m
** (Preliminary) Distance from QCM downstream valve to HDIce upstream valve : 10.6m
+
** (Preliminary) Distance from QCM downstream valve to HDIce upstream valve : 15-20 m

Latest revision as of 09:08, 12 August 2015

  • Double checking dimensions
    • Beam line height Cave 1 : 42.0" = 1.0668m
    • Beam line height Cave 2 : 87.0" = 2.2098m
    • QCM downstream valve from gun/keV beam line intersection : 9.3835m
    • (Preliminary) Distance from QCM downstream valve to HDIce upstream valve : 15-20 m