Difference between revisions of "UITC users"

From Ciswikidb
Jump to navigation Jump to search
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''[[HDIce]]'''
+
The proposal of experiments:
  
'''[[beamline for water sample irradiation]]'''
+
[https://www.jlab.org/ehs/ehsmanual/manual/3120.html ES&H Manual Ch:3120 The CEBAF Experiment Review Process]<br />
 +
[https://www.jlab.org/ehs/ehsmanual/manual/3130.html ES&H Manual Ch:3130 Accelerator Experiment Safety Review Process]
 +
 
 +
The following are a list of all of the experiments which have been performed to date in the Upgrade Injector Test Facility:
 +
 
 +
 
 +
Present Experiment on the floor:<br />
 +
'''[[E-beam Irradiation Experiment| UE21-001: E-beam Irradiation Experiment/LDRD with HRSD]]'''<br />
 +
'''[[beamline for water sample irradiation| UE21-001: E-beam Irradiation Experiment/LDRD with HRSD]]'''
 +
 
 +
Past Experiments:
 +
 
 +
'''[[HDIce|UE-19-001 HDIce]]'''
 +
[https://clasweb.jlab.org/wiki/index.php/HDice@UITF Physics HDIce Wiki]
 +
[https://clasweb.jlab.org/wiki/index.php/CLAS12_HD-Ice_ERR Experimental Readiness Review]

Revision as of 15:21, 27 July 2021

The proposal of experiments:

ES&H Manual Ch:3120 The CEBAF Experiment Review Process
ES&H Manual Ch:3130 Accelerator Experiment Safety Review Process

The following are a list of all of the experiments which have been performed to date in the Upgrade Injector Test Facility:


Present Experiment on the floor:
UE21-001: E-beam Irradiation Experiment/LDRD with HRSD
UE21-001: E-beam Irradiation Experiment/LDRD with HRSD

Past Experiments:

UE-19-001 HDIce Physics HDIce Wiki Experimental Readiness Review