Difference between revisions of "UITF Meeting - April 24, 2019"
Jump to navigation
Jump to search
(15 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | ==UITF Review#3 Conduct of Operations Review== | |
+ | * Summary report [[media:Summary report UITF Conduct of Operations Review.docx]] | ||
− | == | + | ==Advance Material== |
+ | *Final Safety Assessment Document (FSAD) [[media:FSAD8.pdf]] | ||
+ | *Draft UITF Accelerator Safety Envelope (ASE) [[media:UITF ASE Rev 0 version as of 4_24_2019.pdf]] | ||
+ | *Draft UITF Operations Directive (UOD) [[media:UITF Accelerator Operations Directive UOD Rev 0.pdf]] | ||
+ | *link to UITF Safety Documentation page: https://wiki.jlab.org/ciswiki/index.php/UITF_Safety_Documents | ||
==Charge== | ==Charge== | ||
+ | Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam? | ||
==Agenda== | ==Agenda== | ||
− | Status of the Upgraded Injector Test Facility - UITF (Poelker) | + | * (9:00) Status of the Upgraded Injector Test Facility - UITF (Poelker) [[media:UITF status_poelker_COO review v2.pptx]] |
− | Expectations for this meeting | + | **Expectations for this meeting |
− | Brief history of past reviews | + | **Brief history of past reviews |
− | Where are we going? | + | **Where are we going? |
− | Milestones so far | + | **Milestones so far |
− | Highlights of Important Official Documentation (Poelker) | + | * (9:20) Highlights of Important Official Documentation (Poelker, slides included in Status presentation above) |
− | Accelerator Safety Envelope (ASE) | + | **Accelerator Safety Envelope (ASE) |
− | UITF Operations Directives (UOD) | + | **UITF Operations Directives (UOD) |
− | UITF Personnel Safety System – PSS (Kowal) | + | * (10:00) Tour the UITF |
− | UITF Machine Protection System – MPS (Poelker) | + | * (10:15) UITF Personnel Safety System – PSS (Kowal) [[media:UITF PSS overview.pdf]] |
− | UITF Radiation Shielding (Vylet) | + | * (10:45) UITF Machine Protection System – MPS (Poelker) [[media:UITF Machine Protection_poelker_COO review v1.pptx]] |
− | Wrap Up, Summary, Discussion | + | * (11:15) UITF Radiation Shielding (Vylet) [[media:UITF Shielding Summary_Vylet_COO review.pptx]] |
+ | * (11:45) Wrap Up, Summary, Discussion | ||
+ | |||
+ | ==Extra== | ||
+ | [[media:UITF COO review_extras.pptx]] |
Latest revision as of 12:45, 15 June 2019
UITF Review#3 Conduct of Operations Review
- Summary report media:Summary report UITF Conduct of Operations Review.docx
Advance Material
- Final Safety Assessment Document (FSAD) media:FSAD8.pdf
- Draft UITF Accelerator Safety Envelope (ASE) media:UITF ASE Rev 0 version as of 4_24_2019.pdf
- Draft UITF Operations Directive (UOD) media:UITF Accelerator Operations Directive UOD Rev 0.pdf
- link to UITF Safety Documentation page: https://wiki.jlab.org/ciswiki/index.php/UITF_Safety_Documents
Charge
Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?
Agenda
- (9:00) Status of the Upgraded Injector Test Facility - UITF (Poelker) media:UITF status_poelker_COO review v2.pptx
- Expectations for this meeting
- Brief history of past reviews
- Where are we going?
- Milestones so far
- (9:20) Highlights of Important Official Documentation (Poelker, slides included in Status presentation above)
- Accelerator Safety Envelope (ASE)
- UITF Operations Directives (UOD)
- (10:00) Tour the UITF
- (10:15) UITF Personnel Safety System – PSS (Kowal) media:UITF PSS overview.pdf
- (10:45) UITF Machine Protection System – MPS (Poelker) media:UITF Machine Protection_poelker_COO review v1.pptx
- (11:15) UITF Radiation Shielding (Vylet) media:UITF Shielding Summary_Vylet_COO review.pptx
- (11:45) Wrap Up, Summary, Discussion