Difference between revisions of "UITF Meeting - April 24, 2019"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
===UITF Review#3  Conduct of Operations Review===
+
==UITF Review#3  Conduct of Operations Review==
  
==Preview Material==
+
==Advance Material==
  
 
==Charge==
 
==Charge==
Line 7: Line 7:
 
==Agenda==
 
==Agenda==
  
Status of the Upgraded Injector Test Facility - UITF (Poelker)
+
*Status of the Upgraded Injector Test Facility - UITF (Poelker)
Expectations for this meeting
+
**Expectations for this meeting
Brief history of past reviews
+
**Brief history of past reviews
Where are we going?
+
**Where are we going?
Milestones so far
+
**Milestones so far
Highlights of Important Official Documentation (Poelker)
+
*Highlights of Important Official Documentation (Poelker)
Accelerator Safety Envelope (ASE)
+
**Accelerator Safety Envelope (ASE)
UITF Operations Directives (UOD)
+
**UITF Operations Directives (UOD)
UITF Personnel Safety System – PSS (Kowal)
+
*UITF Personnel Safety System – PSS (Kowal)
UITF Machine Protection System – MPS (Poelker)
+
*UITF Machine Protection System – MPS (Poelker)
UITF Radiation Shielding (Vylet)
+
*UITF Radiation Shielding (Vylet)
Wrap Up, Summary, Discussion
+
*Wrap Up, Summary, Discussion

Revision as of 14:50, 18 April 2019

UITF Review#3 Conduct of Operations Review

Advance Material

Charge

Agenda

  • Status of the Upgraded Injector Test Facility - UITF (Poelker)
    • Expectations for this meeting
    • Brief history of past reviews
    • Where are we going?
    • Milestones so far
  • Highlights of Important Official Documentation (Poelker)
    • Accelerator Safety Envelope (ASE)
    • UITF Operations Directives (UOD)
  • UITF Personnel Safety System – PSS (Kowal)
  • UITF Machine Protection System – MPS (Poelker)
  • UITF Radiation Shielding (Vylet)
  • Wrap Up, Summary, Discussion