Difference between revisions of "UITF Meeting - April 24, 2019"

From Ciswikidb
Jump to navigation Jump to search
Line 2: Line 2:
  
 
==Advance Material==
 
==Advance Material==
 +
*Final Safety Assessment Document (FSAD)
 +
*Draft UITF Accelerator Safety Envelope (ASE)
 +
*Draft UITF Operations Directives (UOD)
  
 
==Charge==
 
==Charge==
 +
Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?
  
 
==Agenda==
 
==Agenda==

Revision as of 14:58, 18 April 2019

UITF Review#3 Conduct of Operations Review

Advance Material

  • Final Safety Assessment Document (FSAD)
  • Draft UITF Accelerator Safety Envelope (ASE)
  • Draft UITF Operations Directives (UOD)

Charge

Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?

Agenda

  • Status of the Upgraded Injector Test Facility - UITF (Poelker)
    • Expectations for this meeting
    • Brief history of past reviews
    • Where are we going?
    • Milestones so far
  • Highlights of Important Official Documentation (Poelker)
    • Accelerator Safety Envelope (ASE)
    • UITF Operations Directives (UOD)
  • UITF Personnel Safety System – PSS (Kowal)
  • UITF Machine Protection System – MPS (Poelker)
  • UITF Radiation Shielding (Vylet)
  • Wrap Up, Summary, Discussion