Difference between revisions of "UITF Meeting - April 24, 2019"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
**Where are we going? | **Where are we going? | ||
**Milestones so far | **Milestones so far | ||
− | * (9:20)Highlights of Important Official Documentation (Poelker, slides included in Status presentation above) | + | * (9:20) Highlights of Important Official Documentation (Poelker, slides included in Status presentation above) |
**Accelerator Safety Envelope (ASE) | **Accelerator Safety Envelope (ASE) | ||
**UITF Operations Directives (UOD) | **UITF Operations Directives (UOD) |
Revision as of 10:10, 22 April 2019
UITF Review#3 Conduct of Operations Review
Advance Material
- Final Safety Assessment Document (FSAD) media:FSAD8.pdf
- Draft UITF Accelerator Safety Envelope (ASE) media:UITF ASE Rev 0.pdf
- Draft UITF Operations Directive (UOD) media:UITF Accelerator Operations Directive UOD Rev 0.pdf
- link to UITF Safety Documentation page: https://wiki.jlab.org/ciswiki/index.php/UITF_Safety_Documents
Charge
Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?
Agenda
- (9:00) Status of the Upgraded Injector Test Facility - UITF (Poelker) media:UITF status_poelker_COO review v2.pptx
- Expectations for this meeting
- Brief history of past reviews
- Where are we going?
- Milestones so far
- (9:20) Highlights of Important Official Documentation (Poelker, slides included in Status presentation above)
- Accelerator Safety Envelope (ASE)
- UITF Operations Directives (UOD)
- (10:00) Tour the UITF
- (10:15) UITF Personnel Safety System – PSS (Kowal)
- (10:45) UITF Machine Protection System – MPS (Poelker) media:UITF Machine Protection_poelker_COO review v1.pptx
- (11:15) UITF Radiation Shielding (Vylet)
- (11:45) Wrap Up, Summary, Discussion