Difference between revisions of "UITF Meeting - April 24, 2019"

From Ciswikidb
Jump to navigation Jump to search
 
(14 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
==UITF Review#3  Conduct of Operations Review==
 
==UITF Review#3  Conduct of Operations Review==
 +
* Summary report [[media:Summary report UITF Conduct of Operations Review.docx]]
  
 
==Advance Material==
 
==Advance Material==
 +
*Final Safety Assessment Document (FSAD) [[media:FSAD8.pdf]]
 +
*Draft UITF Accelerator Safety Envelope (ASE) [[media:UITF ASE Rev 0 version as of 4_24_2019.pdf]]
 +
*Draft UITF Operations Directive (UOD) [[media:UITF Accelerator Operations Directive UOD Rev 0.pdf]]
 +
*link to UITF Safety Documentation page: https://wiki.jlab.org/ciswiki/index.php/UITF_Safety_Documents
  
 
==Charge==
 
==Charge==
 +
Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?
  
 
==Agenda==
 
==Agenda==
  
*Status of the Upgraded Injector Test Facility - UITF (Poelker)
+
* (9:00) Status of the Upgraded Injector Test Facility - UITF (Poelker) [[media:UITF status_poelker_COO review v2.pptx]]
 
**Expectations for this meeting
 
**Expectations for this meeting
 
**Brief history of past reviews
 
**Brief history of past reviews
 
**Where are we going?
 
**Where are we going?
 
**Milestones so far
 
**Milestones so far
*Highlights of Important Official Documentation (Poelker)
+
* (9:20) Highlights of Important Official Documentation (Poelker, slides included in Status presentation above)
 
**Accelerator Safety Envelope (ASE)
 
**Accelerator Safety Envelope (ASE)
 
**UITF Operations Directives (UOD)
 
**UITF Operations Directives (UOD)
*UITF Personnel Safety System – PSS (Kowal)
+
* (10:00) Tour the UITF
*UITF Machine Protection System – MPS (Poelker)
+
* (10:15) UITF Personnel Safety System – PSS (Kowal) [[media:UITF PSS overview.pdf]]
*UITF Radiation Shielding (Vylet)
+
* (10:45) UITF Machine Protection System – MPS (Poelker) [[media:UITF Machine Protection_poelker_COO review v1.pptx]]
*Wrap Up, Summary, Discussion
+
* (11:15) UITF Radiation Shielding (Vylet) [[media:UITF Shielding Summary_Vylet_COO review.pptx]]
 +
* (11:45) Wrap Up, Summary, Discussion
 +
 
 +
==Extra==
 +
[[media:UITF COO review_extras.pptx]]

Latest revision as of 12:45, 15 June 2019

UITF Review#3 Conduct of Operations Review

Advance Material

Charge

Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?

Agenda

Extra

media:UITF COO review_extras.pptx