Difference between revisions of "UITF Meeting - April 24, 2019"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "UITF Review#3 Conduct of Operations Review Status of the Upgraded Injector Test Facility - UITF (Poelker) Expectations for this meeting Brief history of past reviews Where a...")
 
 
(16 intermediate revisions by the same user not shown)
Line 1: Line 1:
UITF Review#3  Conduct of Operations Review
+
==UITF Review#3  Conduct of Operations Review==
 +
* Summary report [[media:Summary report UITF Conduct of Operations Review.docx]]
  
Status of the Upgraded Injector Test Facility - UITF (Poelker)
+
==Advance Material==
Expectations for this meeting
+
*Final Safety Assessment Document (FSAD) [[media:FSAD8.pdf]]
Brief history of past reviews
+
*Draft UITF Accelerator Safety Envelope (ASE) [[media:UITF ASE Rev 0 version as of 4_24_2019.pdf]]
Where are we going?
+
*Draft UITF Operations Directive (UOD) [[media:UITF Accelerator Operations Directive UOD Rev 0.pdf]]
Milestones so far
+
*link to UITF Safety Documentation page: https://wiki.jlab.org/ciswiki/index.php/UITF_Safety_Documents
Highlights of Important Official Documentation (Poelker)
+
 
Accelerator Safety Envelope (ASE)
+
==Charge==
UITF Operations Directives (UOD)
+
Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?
UITF Personnel Safety System – PSS (Kowal)
+
 
UITF Machine Protection System – MPS (Poelker)
+
==Agenda==
UITF Radiation Shielding (Vylet)
+
 
Wrap Up, Summary, Discussion
+
* (9:00) Status of the Upgraded Injector Test Facility - UITF (Poelker) [[media:UITF status_poelker_COO review v2.pptx]]
 +
**Expectations for this meeting
 +
**Brief history of past reviews
 +
**Where are we going?
 +
**Milestones so far
 +
* (9:20) Highlights of Important Official Documentation (Poelker, slides included in Status presentation above)
 +
**Accelerator Safety Envelope (ASE)
 +
**UITF Operations Directives (UOD)
 +
* (10:00) Tour the UITF
 +
* (10:15) UITF Personnel Safety System – PSS (Kowal) [[media:UITF PSS overview.pdf]]
 +
* (10:45) UITF Machine Protection System – MPS (Poelker) [[media:UITF Machine Protection_poelker_COO review v1.pptx]]
 +
* (11:15) UITF Radiation Shielding (Vylet) [[media:UITF Shielding Summary_Vylet_COO review.pptx]]
 +
* (11:45) Wrap Up, Summary, Discussion
 +
 
 +
==Extra==
 +
[[media:UITF COO review_extras.pptx]]

Latest revision as of 12:45, 15 June 2019

UITF Review#3 Conduct of Operations Review

Advance Material

Charge

Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?

Agenda

Extra

media:UITF COO review_extras.pptx