Difference between revisions of "UITF Meeting - April 24, 2019"
Jump to navigation
Jump to search
(Created page with "UITF Review#3 Conduct of Operations Review Status of the Upgraded Injector Test Facility - UITF (Poelker) Expectations for this meeting Brief history of past reviews Where a...") |
|||
Line 1: | Line 1: | ||
− | UITF Review#3 Conduct of Operations Review | + | ===UITF Review#3 Conduct of Operations Review=== |
+ | |||
+ | ==Preview Material== | ||
+ | |||
+ | ==Charge== | ||
+ | |||
+ | ==Agenda== | ||
Status of the Upgraded Injector Test Facility - UITF (Poelker) | Status of the Upgraded Injector Test Facility - UITF (Poelker) |
Revision as of 14:47, 18 April 2019
UITF Review#3 Conduct of Operations Review
Preview Material
Charge
Agenda
Status of the Upgraded Injector Test Facility - UITF (Poelker) Expectations for this meeting Brief history of past reviews Where are we going? Milestones so far Highlights of Important Official Documentation (Poelker) Accelerator Safety Envelope (ASE) UITF Operations Directives (UOD) UITF Personnel Safety System – PSS (Kowal) UITF Machine Protection System – MPS (Poelker) UITF Radiation Shielding (Vylet) Wrap Up, Summary, Discussion