Difference between revisions of "UITF Meeting - April 24, 2019"

From Ciswikidb
Jump to navigation Jump to search
Line 17: Line 17:
 
**Where are we going?
 
**Where are we going?
 
**Milestones so far
 
**Milestones so far
* (9:20)Highlights of Important Official Documentation (Poelker, slides included in Status presentation above)
+
* (9:20) Highlights of Important Official Documentation (Poelker, slides included in Status presentation above)
 
**Accelerator Safety Envelope (ASE)
 
**Accelerator Safety Envelope (ASE)
 
**UITF Operations Directives (UOD)
 
**UITF Operations Directives (UOD)

Revision as of 10:10, 22 April 2019

UITF Review#3 Conduct of Operations Review

Advance Material

Charge

Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?

Agenda

  • (9:00) Status of the Upgraded Injector Test Facility - UITF (Poelker) media:UITF status_poelker_COO review v2.pptx
    • Expectations for this meeting
    • Brief history of past reviews
    • Where are we going?
    • Milestones so far
  • (9:20) Highlights of Important Official Documentation (Poelker, slides included in Status presentation above)
    • Accelerator Safety Envelope (ASE)
    • UITF Operations Directives (UOD)
  • (10:00) Tour the UITF
  • (10:15) UITF Personnel Safety System – PSS (Kowal)
  • (10:45) UITF Machine Protection System – MPS (Poelker) media:UITF Machine Protection_poelker_COO review v1.pptx
  • (11:15) UITF Radiation Shielding (Vylet)
  • (11:45) Wrap Up, Summary, Discussion