Difference between revisions of "UITF Meeting - April 24, 2019"

From Ciswikidb
Jump to navigation Jump to search
Line 4: Line 4:
 
*Final Safety Assessment Document (FSAD) [[media:FSAD8.pdf]]
 
*Final Safety Assessment Document (FSAD) [[media:FSAD8.pdf]]
 
*Draft UITF Accelerator Safety Envelope (ASE) [[media:UITF ASE Rev 0.pdf]]
 
*Draft UITF Accelerator Safety Envelope (ASE) [[media:UITF ASE Rev 0.pdf]]
*Draft UITF Operations Directive (UOD)
+
*Draft UITF Operations Directive (UOD) [[media:UITF Accelerator Operations Directive UOD Rev 0.pdf]]
 
*link to UITF Safety Documentation page: https://wiki.jlab.org/ciswiki/index.php/UITF_Safety_Documents
 
*link to UITF Safety Documentation page: https://wiki.jlab.org/ciswiki/index.php/UITF_Safety_Documents
  

Revision as of 15:52, 18 April 2019

UITF Review#3 Conduct of Operations Review

Advance Material

Charge

Reviewers, please comment on our readiness to conduct the final Accelerator Readiness Review. Are we ready to ask the DOE for permission to make MeV beam?

Agenda

  • Status of the Upgraded Injector Test Facility - UITF (Poelker)
    • Expectations for this meeting
    • Brief history of past reviews
    • Where are we going?
    • Milestones so far
  • Highlights of Important Official Documentation (Poelker)
    • Accelerator Safety Envelope (ASE)
    • UITF Operations Directives (UOD)
  • UITF Personnel Safety System – PSS (Kowal)
  • UITF Machine Protection System – MPS (Poelker)
  • UITF Radiation Shielding (Vylet)
  • Wrap Up, Summary, Discussion