(Created page with "* Shaun gave an update: : Working on first MeV 80/20 stand layout and point (components may still be moved atop it) : Provided Phil w/ DP can layout for assembly : Will submit...")
 
Line 1: Line 1:
* Shaun gave an update:
+
=== Shaun gave an update ===
: Working on first MeV 80/20 stand layout and point (components may still be moved atop it)
+
* Working on first MeV 80/20 stand layout and point (components may still be moved atop it)
: Provided Phil w/ DP can layout for assembly
+
* Provided Phil w/ DP can layout for assembly
: Will submit job to machine shop for (2) vertical chicane vacuum chambers
+
* Will submit job to machine shop for (2) vertical chicane vacuum chambers
: Order add'l hardware right angle brackets (40) and 4-1/2" vee-blockes needed  
+
* Order add'l hardware right angle brackets (40) and 4-1/2" vee-blockes needed  
  
* Phil/Marcy discussed count of components needs in MeV section, good news relatively list so far...
+
=== Phil/Marcy discussed count of components needs in MeV section, good news relatively list so far ===
: Proceeding w Plan A 1.5" pipe w/ reducers as needed
+
* Proceeding w Plan A 1.5" pipe w/ reducers as needed
: Would like to order additional IP's, with XHV IP near cryo-unit exit
+
* Would like to order additional IP's, with XHV IP near cryo-unit exit
: Too early for list of bolts/flanges
+
* Too early for list of bolts/flanges
: Will begin building up the DP assembly
+
* Will begin building up the DP assembly
: Jim Kortze has the BCM cavity
+
* Jim Kortze has the BCM cavity
  
* Joe updates
+
=== Joe updates ===
: CEBAF MeV region has quad upstream of DP station; for next week will evaluate beam envelope booster to chicane using Alicia's span of cases
+
* CEBAF MeV region has quad upstream of DP station; for next week will evaluate beam envelope booster to chicane using Alicia's span of cases
: Positron spigot:  Plan A is borrow 5D line from CEBAF, Plan B is reproduce those elements ... TBD
+
* Positron spigot:  Plan A is borrow 5D line from CEBAF, Plan B is reproduce those elements ... TBD
: Will suggest MeV corrector option that fits in 15" clear gap after each quad
+
* Will suggest MeV corrector option that fits in 15" clear gap after each quad

Revision as of 12:26, 24 January 2018

Shaun gave an update

  • Working on first MeV 80/20 stand layout and point (components may still be moved atop it)
  • Provided Phil w/ DP can layout for assembly
  • Will submit job to machine shop for (2) vertical chicane vacuum chambers
  • Order add'l hardware right angle brackets (40) and 4-1/2" vee-blockes needed

Phil/Marcy discussed count of components needs in MeV section, good news relatively list so far

  • Proceeding w Plan A 1.5" pipe w/ reducers as needed
  • Would like to order additional IP's, with XHV IP near cryo-unit exit
  • Too early for list of bolts/flanges
  • Will begin building up the DP assembly
  • Jim Kortze has the BCM cavity

Joe updates

  • CEBAF MeV region has quad upstream of DP station; for next week will evaluate beam envelope booster to chicane using Alicia's span of cases
  • Positron spigot: Plan A is borrow 5D line from CEBAF, Plan B is reproduce those elements ... TBD
  • Will suggest MeV corrector option that fits in 15" clear gap after each quad