Difference between revisions of "UITF Meeting - March 12, 2019"
Jump to navigation
Jump to search
(Created page with " UITF to do list: March 11, 2019 • Brock bunch length monitor: o 1497 MHz trigger signal to fast scope o Connect oscope to network o Software o Video, tripod? • Dress ion...") |
|||
Line 3: | Line 3: | ||
March 11, 2019 | March 11, 2019 | ||
− | + | #Brock bunch length monitor: | |
− | + | ## 1497 MHz trigger signal to fast scope | |
− | + | ## Connect oscope to network | |
− | + | ## Software | |
− | + | ## Video, tripod? | |
− | + | # Dress ion pump cables, cut to length | |
− | + | # Shelf for ion pump supply | |
− | + | # Yao cavity installed, bake this region | |
− | + | # Brock bunch length monitor at MeV dump | |
− | + | # Yao bunchlength electronics | |
− | + | # Chopper and buncher epics screen calibrations | |
− | + | # Characterize the buncher (Yan) | |
− | + | # QE scan tool like one at CEBAF? To ground out the gun HV, or whatever it does | |
− | + | # Test the Brock polarimeter | |
− | + | # OSP for floating beam through the QCM, maybe just a revision of keV OSP? | |
− | + | # Float beam through QCM, calibrate the BCM (beam small enough for this?) | |
− | + | # UITF AOD | |
− | + | ## Channel access, implement it | |
− | + | ## MPS description | |
− | + | ## UED | |
− | + | # Steering magnets on MeV beamline 1.5” pipe, or on 2.75” flanges? | |
− | + | # Steering magnets for HDIce line, 3” pipe | |
− | + | # Third magnet rack | |
− | + | # Valve chassis for MeV beamline | |
− | + | ## Will our valve actuators always look kluged up? | |
− | + | # Harps, install them, four more | |
− | + | # MeV beamline BPMs, fix one of them (Phil is on it) | |
− | + | # MeV viewers and video signals | |
− | + | # Water flow through dumps and cups | |
− | + | # Raster magnets and electronics, installed, functional | |
− | + | # Water leak keV region | |
− | + | # Update UED | |
− | + | # Songsheet, as-built accurate drawing | |
− | + | # Modify Eric’s quick view schematic (correct errors, if any) | |
− | + | # Ask Eric for MeV quick view schematic | |
− | + | # pA BPMs | |
− | + | # Go-No Go detector for HDIce, near apertures, add these as fsd nodes | |
− | + | # Summarize MPS/FSDs, install them, test them | |
− | + | ## Gun high voltage | |
− | + | ## Dipole magnet at 15 degree bend | |
− | + | ## Vertical chicane dipole (or is this PSS?) | |
− | + | ## Go-No Go sensor near HDIce, at one of the apertures | |
− | + | ## Vacuum interlock to valves | |
− | + | ## Vacuum interlock to chopper rf power, buncher power? | |
− | + | ## BLMs, need to put them on beamline | |
− | + | ## QCM liquid level | |
− | + | ## Water flow to buncher, chopper cavities | |
• Modifications to PSS? | • Modifications to PSS? | ||
o How does SSG want to interlock the vertical chicane dipole to PSS? | o How does SSG want to interlock the vertical chicane dipole to PSS? |
Revision as of 13:38, 12 March 2019
UITF to do list: March 11, 2019
- Brock bunch length monitor:
- 1497 MHz trigger signal to fast scope
- Connect oscope to network
- Software
- Video, tripod?
- Dress ion pump cables, cut to length
- Shelf for ion pump supply
- Yao cavity installed, bake this region
- Brock bunch length monitor at MeV dump
- Yao bunchlength electronics
- Chopper and buncher epics screen calibrations
- Characterize the buncher (Yan)
- QE scan tool like one at CEBAF? To ground out the gun HV, or whatever it does
- Test the Brock polarimeter
- OSP for floating beam through the QCM, maybe just a revision of keV OSP?
- Float beam through QCM, calibrate the BCM (beam small enough for this?)
- UITF AOD
- Channel access, implement it
- MPS description
- UED
- Steering magnets on MeV beamline 1.5” pipe, or on 2.75” flanges?
- Steering magnets for HDIce line, 3” pipe
- Third magnet rack
- Valve chassis for MeV beamline
- Will our valve actuators always look kluged up?
- Harps, install them, four more
- MeV beamline BPMs, fix one of them (Phil is on it)
- MeV viewers and video signals
- Water flow through dumps and cups
- Raster magnets and electronics, installed, functional
- Water leak keV region
- Update UED
- Songsheet, as-built accurate drawing
- Modify Eric’s quick view schematic (correct errors, if any)
- Ask Eric for MeV quick view schematic
- pA BPMs
- Go-No Go detector for HDIce, near apertures, add these as fsd nodes
- Summarize MPS/FSDs, install them, test them
- Gun high voltage
- Dipole magnet at 15 degree bend
- Vertical chicane dipole (or is this PSS?)
- Go-No Go sensor near HDIce, at one of the apertures
- Vacuum interlock to valves
- Vacuum interlock to chopper rf power, buncher power?
- BLMs, need to put them on beamline
- QCM liquid level
- Water flow to buncher, chopper cavities
• Modifications to PSS? o How does SSG want to interlock the vertical chicane dipole to PSS? o Third run/safe box • Electricians with some outlet strips along the beamline? That can be turned OFF with switch? • PSS BCM, needed or not? • North wall SEG blocks • Piers and chimney roof tile in place • 3rd review: who are reviewers, schedule it, agenda • Buy a vacuum cleaner for the cave and use it (Shark) • Clean up the caves • Labels applied to everything? • Replumb the GN2 manifolds