Difference between revisions of "UITF Meeting - March 18, 2016"

From Ciswikidb
Jump to navigation Jump to search
Line 18: Line 18:
  
 
== Agenda ==
 
== Agenda ==
===  9:30 UITF Overview and timeline (M. Poelker) ===
+
===  9:30 (15 + 5) UITF Overview and timeline (M. Poelker) ===
===  9:50 HDIce description (C. Hanretty) ===
+
===  9:50 (20 + 5) HDIce description (C. Hanretty) ===
=== 10:15 Mechanical Layout of the entire beamline (J. Grames) ===
+
=== 10:15 (25 + 5) Mechanical Layout of the entire beamline, Diagnostic devices, beam dumps, spectrometers (J. Grames) ===
===      Diagnostic devices, beam dumps, spectrometers ===
+
=== 10:45 (15 + 5) 200-350 keV and 10 MeV Optics (A. Bogacz) ===
=== 10:45 200-350 keV and 10 MeV Optics (A. Bogacz) ===
+
=== 11:05 (10 + 5) High Voltage and Laser Systems (J. Hansknecht)===
=== 11:05 High Voltage and Laser Systems (J. Hansknecht)===
+
=== 11:15 (10 + 5) Machine protection (M. Poelker) ===
=== 11:15 Machine protection (M. Poelker) ===
+
=== 11:30 Discussion (all) ===
=== 11:30 Discussion ===
 
  
 
== Reviewer Summary and Recommendations ==
 
== Reviewer Summary and Recommendations ==

Revision as of 12:41, 11 March 2016

Charge

Evaluate the UITF design with respect to beam requirements for HDIce.

1. Can UITF deliver the beam HDIce needs?
2. Are there sufficient diagnostic devices to aid in beam delivery?
3. What devices or processes ensure the low-current beam is at the intended place on target?
4. What measures are planned to protect the HDIce target from > nA beam for any length of  time (msecs)?

Advance Material

*UITF Description 
*HDIce Beam Requirements media:HDIce beam requirements at UITF.pdf
*UITF mechanical layout
*UITF Optics
*New quarter CM calculation from Haipeng media:Haipeng's calculations for new quarter CM.pdf
*UITF schedule media:updated UITF schedule 3_6_2016.docx
*UITF parts list media:UITF component count.xls
*John Musson's ideas on improving stripline BPM sensitivity  media:injection locking paper 1.pdf  media:injection locking paper 2.pdf  media:injection locking paper 3.pdf

Agenda

9:30 (15 + 5) UITF Overview and timeline (M. Poelker)

9:50 (20 + 5) HDIce description (C. Hanretty)

10:15 (25 + 5) Mechanical Layout of the entire beamline, Diagnostic devices, beam dumps, spectrometers (J. Grames)

10:45 (15 + 5) 200-350 keV and 10 MeV Optics (A. Bogacz)

11:05 (10 + 5) High Voltage and Laser Systems (J. Hansknecht)

11:15 (10 + 5) Machine protection (M. Poelker)

11:30 Discussion (all)

Reviewer Summary and Recommendations