Difference between revisions of "UITF Meeting - March 18, 2016"

From Ciswikidb
Jump to navigation Jump to search
 
(3 intermediate revisions by 2 users not shown)
Line 20: Line 20:
 
===  9:30 (15 + 5) UITF Overview and timeline (M. Poelker) [[media:UITF overview v2.pptx]] ===
 
===  9:30 (15 + 5) UITF Overview and timeline (M. Poelker) [[media:UITF overview v2.pptx]] ===
  
===  9:50 (20 + 5) HDIce description (C. Hanretty) [[media:Charles Hanretty HDIce overview.pdf]] ===
+
===  9:50 (20 + 5) HDIce description (C. Hanretty) [[media:Charles_Hanretty_HDice_overview.pdf]] ===
  
 
=== 10:15 (25 + 5) Mechanical Layout of the entire beamline, Diagnostic devices, beam dumps, spectrometers (J. Grames) [[media:160317_UITF_OpsReview_Grames.pptx]] (view animated mode) ===
 
=== 10:15 (25 + 5) Mechanical Layout of the entire beamline, Diagnostic devices, beam dumps, spectrometers (J. Grames) [[media:160317_UITF_OpsReview_Grames.pptx]] (view animated mode) ===
Line 26: Line 26:
 
=== 10:45 (15 + 5) UITF Optics - keV and MeV beam-lines (A. Bogacz) [[media:UITF_OpsReview_Bogacz.pptx]] ===  
 
=== 10:45 (15 + 5) UITF Optics - keV and MeV beam-lines (A. Bogacz) [[media:UITF_OpsReview_Bogacz.pptx]] ===  
  
=== 11:05 (15 + 5) UITF Gun through 2-7 Quarter Optimization (A. Hofler) [[media:UITF_OpsReview_Hofler2.pptx]] ===  
+
=== 11:05 (15 + 5) UITF Gun through 2-7 Quarter Optimization (A. Hofler) [[media:UITF_OpsReview_Hofler3.pptx]] ===
  
 
=== 11:20 (10 + 5) High Voltage and Laser Systems (J. Hansknecht)[[media:Hansknecht overview of gun HV and laser.pptx]] ===
 
=== 11:20 (10 + 5) High Voltage and Laser Systems (J. Hansknecht)[[media:Hansknecht overview of gun HV and laser.pptx]] ===
Line 35: Line 35:
  
 
== Reviewer Summary and Recommendations ==
 
== Reviewer Summary and Recommendations ==
 +
 +
[[media:UITF Ops review summary.docx]]

Latest revision as of 16:19, 11 April 2016

Charge

Evaluate the UITF design with respect to beam requirements for HDIce.

1. Can UITF deliver the beam HDIce needs?
2. Are there sufficient diagnostic devices to aid in beam delivery?
3. What devices or processes ensure the low-current beam is at the intended place on target?
4. What measures are planned to protect the HDIce target from > nA beam for any length of  time (msecs)?

Advance Material

*UITF Description _ see Agenda below
*HDIce Beam Requirements media:HDIce beam requirements at UITF.pdf
*UITF mechanical layout  [1]
*UITF Optics Elegant layout releases here
*New quarter CM calculation from Haipeng media:Haipeng's calculations for new quarter CM.pdf
*UITF schedule media:updated UITF schedule 3_6_2016.docx
*UITF parts list media:UITF component count.xls and UITF Element Database here
*John Musson's ideas on improving stripline BPM sensitivity  media:injection locking paper 1.pdf  media:injection locking paper 2.pdf  media:injection locking paper 3.pdf

Agenda

9:30 (15 + 5) UITF Overview and timeline (M. Poelker) media:UITF overview v2.pptx

9:50 (20 + 5) HDIce description (C. Hanretty) media:Charles_Hanretty_HDice_overview.pdf

10:15 (25 + 5) Mechanical Layout of the entire beamline, Diagnostic devices, beam dumps, spectrometers (J. Grames) media:160317_UITF_OpsReview_Grames.pptx (view animated mode)

10:45 (15 + 5) UITF Optics - keV and MeV beam-lines (A. Bogacz) media:UITF_OpsReview_Bogacz.pptx

11:05 (15 + 5) UITF Gun through 2-7 Quarter Optimization (A. Hofler) media:UITF_OpsReview_Hofler3.pptx

11:20 (10 + 5) High Voltage and Laser Systems (J. Hansknecht)media:Hansknecht overview of gun HV and laser.pptx

11:40 (10 + 5) Machine protection (M. Poelker) media:UITF MPS.pptx

11:55 Discussion (all) media:UITF concerns.pptx

Reviewer Summary and Recommendations

media:UITF Ops review summary.docx