− | *Fibers for helicity info to HDIce | + | *Fibers for helicity info to HDIce, 3 fibers, what are the fiber connectors? |
− | *Install the fiber modulator, 1 MHz, with BNC | + | *Install the fiber modulator, 1 MHz signal generator, with BNC cable to the rack of lockin amplifiers |
*Build the apertures, with motorized bellows actuators like the chopper master slit, use Decarad to detect beam loss | *Build the apertures, with motorized bellows actuators like the chopper master slit, use Decarad to detect beam loss | ||
− | |||
*Install Brock cavity | *Install Brock cavity | ||
*more pressure to spectrometer valve, it leaks | *more pressure to spectrometer valve, it leaks | ||
+ | *bake gun, high voltage condition, make a photocathode |
Revision as of 09:46, 4 November 2019
- Fibers for helicity info to HDIce, 3 fibers, what are the fiber connectors?
- Install the fiber modulator, 1 MHz signal generator, with BNC cable to the rack of lockin amplifiers
- Build the apertures, with motorized bellows actuators like the chopper master slit, use Decarad to detect beam loss
- Install Brock cavity
- more pressure to spectrometer valve, it leaks
- bake gun, high voltage condition, make a photocathode