(Created page with "• Fibers for helicity info to HDIce • Install the fiber modulator, 1 MHz, with BNC cable or fiber cable to the rack of lockin amplifiers • Build the apertures, with moto...")
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Fibers for helicity info to HDIce
+
*Fibers for helicity info to HDIce, 3 fibers, what are the fiber connectors?
Install the fiber modulator, 1 MHz, with BNC cable or fiber cable to the rack of lockin amplifiers
+
*Install the fiber modulator, 1 MHz signal generator, with BNC cable to the rack of lockin amplifiers
Build the apertures, with motorized bellows actuators like the chopper master slit, use Decarad to detect beam loss
+
*Build the apertures, with motorized bellows actuators like the chopper master slit, use Decarad to detect beam loss
 +
*Install Brock cavity
 +
*more pressure to spectrometer valve, it leaks
 +
*bake gun, high voltage condition, make a photocathode

Revision as of 09:46, 4 November 2019

  • Fibers for helicity info to HDIce, 3 fibers, what are the fiber connectors?
  • Install the fiber modulator, 1 MHz signal generator, with BNC cable to the rack of lockin amplifiers
  • Build the apertures, with motorized bellows actuators like the chopper master slit, use Decarad to detect beam loss
  • Install Brock cavity
  • more pressure to spectrometer valve, it leaks
  • bake gun, high voltage condition, make a photocathode