UITF Meeting - November 4, 2019

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
  • Fibers for helicity info to HDIce, 3 fibers, what are the fiber connectors?
  • Install the fiber modulator, 1 MHz signal generator, with BNC cable to the rack of lockin amplifiers
  • Build the apertures, with motorized bellows actuators like the chopper master slit, use Decarad to detect beam loss
  • control pockels cell voltage with ADC connector to EMCO bricks, cables from upstairs rack to laser table
  • Install Brock cavity
  • more pressure to spectrometer valve, it leaks
  • bake gun, high voltage condition, make a photocathode