(Created page with "05 March 2020 UITF/HD-Ice Meeting: • Poelker, Ginsburg, Reilly, Lung, Rossi, Preble, May, Sandorfi, Smith Schedule for CTF Demand: • Draft Schedule based on estimated re...")
 
Line 5: Line 5:
 
Schedule for CTF Demand:  
 
Schedule for CTF Demand:  
 
• Draft Schedule based on estimated readiness for CTF of LCLS-II CM in June and C75 in August
 
• Draft Schedule based on estimated readiness for CTF of LCLS-II CM in June and C75 in August
Customer Start Date End Date
+
 
UITF Run #0 Commissioning Mar 30 Apr 17
+
[[File:HDIce test schedule.jpg|thumb|left|100px]]
UITF/HD-Ice Run #1 Commissioning May 7 May 22
 
UITF/HD-Ice ~1 week changeover May 23 May 29
 
UITF/HD-Ice Run #2 Unpolarized Target May 30 June 15
 
LCLS-II CM June 16 July 5
 
UITF/HD-Ice Run #3 Polarized Target July 6 Aug 2
 
float Aug 3 Aug 20
 
CEBAF C75 Aug 21 tbd
 
  
 
NOTES
 
NOTES

Revision as of 14:21, 8 March 2020

05 March 2020 UITF/HD-Ice Meeting: • Poelker, Ginsburg, Reilly, Lung, Rossi, Preble, May, Sandorfi, Smith

Schedule for CTF Demand: • Draft Schedule based on estimated readiness for CTF of LCLS-II CM in June and C75 in August

HDIce test schedule.jpg

NOTES • Everything ready for UITF Run 0 commissioning • Prior to UITF/HD-Ice Run 1: o CATS items to be closed (Poelker/Ginsburg/Seryi/Smith) o ERR Recommendations to be closed (Sandorfi/Rossi) o Permission to operate from TJSO (Poelker/Ginsburg/Seryi/May) • Progress on repair of the current LCLS-II cryomodule will determine whether it can be ready by June 16 for CTF. Any delay will require re-visiting the schedule for UITF/HD-Ice Run #3 • Updates to be presented at the Planning & Coordination meeting on March 17 • Re-convene this group for a status meeting in ~one month