Difference between revisions of "UITF Meeting with Allison and others to discuss schedule HDIce tests 3 5 2020"
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
*Everything ready for UITF Run 0 commissioning | *Everything ready for UITF Run 0 commissioning | ||
*Prior to UITF/HD-Ice Run 1: | *Prior to UITF/HD-Ice Run 1: | ||
− | **CATS items to be closed (Poelker/Ginsburg/Seryi/Smith) | + | ** CATS items to be closed (Poelker/Ginsburg/Seryi/Smith) |
− | **ERR Recommendations to be closed (Sandorfi/Rossi) | + | ** ERR Recommendations to be closed (Sandorfi/Rossi) |
− | **Permission to operate from TJSO (Poelker/Ginsburg/Seryi/May) | + | ** Permission to operate from TJSO (Poelker/Ginsburg/Seryi/May) |
*Progress on repair of the current LCLS-II cryomodule will determine whether it can be ready by June 16 for CTF. Any delay will require re-visiting the schedule for UITF/HD-Ice Run #3 | *Progress on repair of the current LCLS-II cryomodule will determine whether it can be ready by June 16 for CTF. Any delay will require re-visiting the schedule for UITF/HD-Ice Run #3 | ||
*Updates to be presented at the Planning & Coordination meeting on March 17 | *Updates to be presented at the Planning & Coordination meeting on March 17 | ||
*Re-convene this group for a status meeting in ~one month | *Re-convene this group for a status meeting in ~one month |
Revision as of 14:26, 8 March 2020
05 March 2020 UITF/HD-Ice Meeting: • Poelker, Ginsburg, Reilly, Lung, Rossi, Preble, May, Sandorfi, Smith
Schedule for CTF Demand: • Draft Schedule based on estimated readiness for CTF of LCLS-II CM in June and C75 in August
NOTES
- Everything ready for UITF Run 0 commissioning
- Prior to UITF/HD-Ice Run 1:
- CATS items to be closed (Poelker/Ginsburg/Seryi/Smith)
- ERR Recommendations to be closed (Sandorfi/Rossi)
- Permission to operate from TJSO (Poelker/Ginsburg/Seryi/May)
- Progress on repair of the current LCLS-II cryomodule will determine whether it can be ready by June 16 for CTF. Any delay will require re-visiting the schedule for UITF/HD-Ice Run #3
- Updates to be presented at the Planning & Coordination meeting on March 17
- Re-convene this group for a status meeting in ~one month