UITF Notes
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
MeV beam time
- Measure MeV dispersion with BPMs => Done, need to analyze
- TM beam to 703 to see RF drift (full shift)
- Verify optics setup for HKDL
- Repeat buncher study, booster crested, 8 MeV, multiple scans per point
keV beam time
- LVQE scan at different voltages. Expect same result.
- HVQE scan at different voltages. Expect different result.
- CST: Does thermal energy affect collection efficiency?
- High current to FC2 for 12+ hours, check if drift is gone
Beam line modifications
- Put HKDL stuff into the machine ahead of time!