Difference between revisions of "UITF Operations"

From Ciswikidb
Jump to navigation Jump to search
(11 intermediate revisions by 2 users not shown)
Line 9: Line 9:
 
<td bgcolor="#e0e0f0" valign=top>
 
<td bgcolor="#e0e0f0" valign=top>
 
*[[UITC_meeting_minutes|General]]
 
*[[UITC_meeting_minutes|General]]
*[[Meeting_minutes|Experiment In-progress]]
+
*[[E-beam_Irradiation_Experiment|Experiment In-progress]]
 
<hr> <!-- line -->
 
<hr> <!-- line -->
 
<b>Configuration</b>
 
<b>Configuration</b>
Line 16: Line 16:
 
*[[Beamline_Layout|ME Drawings]]
 
*[[Beamline_Layout|ME Drawings]]
 
*[[Beamline_Layout|Elegant/Model Data]]
 
*[[Beamline_Layout|Elegant/Model Data]]
*[[UITC_technical_areas|Other data]]
+
*[[UITC_technical_areas|Technical areas]]
 
<hr>
 
<hr>
 
<b>Work Controls</b>
 
<b>Work Controls</b>
Line 24: Line 24:
 
<hr>
 
<hr>
 
<b>Users (Past/Present)</b>
 
<b>Users (Past/Present)</b>
* [[Beamline_for_water_sample_irradiation| Wastewater Irradiation]]
+
* [[E-beam Irradiation Experiment| Wastewater Irradiation]]
 
* [[HDIce| HDIce]]
 
* [[HDIce| HDIce]]
 
<hr>
 
<hr>
Line 35: Line 35:
 
*[[Data_Acquisition_and_Control_racks|UITF Rack Layout]]
 
*[[Data_Acquisition_and_Control_racks|UITF Rack Layout]]
 
*Inventories
 
*Inventories
 +
*[[To-do_list]]
 
</td>
 
</td>
  
Line 47: Line 48:
 
<td rowspan=5>[[Image:Matt.jpg|250px]]</td>
 
<td rowspan=5>[[Image:Matt.jpg|250px]]</td>
 
<td width=150 bgcolor="#e0e0f0"><font size="+1">[[Meeting_minutes| Experimental Meetings]]</font></td>
 
<td width=150 bgcolor="#e0e0f0"><font size="+1">[[Meeting_minutes| Experimental Meetings]]</font></td>
<td width=210 bgcolor="#e0e0f0"><font size="+1">[[Shift_Taker_Information| Info for Shift Takers]]</font></td>
+
<td width=210 bgcolor="#e0e0f0"><font size="+1">[[ProposedSchedule| Upcoming Schedule]]</font></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 124: Line 125:
 
* [http://ued.acc.jlab.org UED]
 
* [http://ued.acc.jlab.org UED]
 
* [[UITF_Operation_How_To's| Common How-to]]
 
* [[UITF_Operation_How_To's| Common How-to]]
 +
* [[Wastewater_Experiment_Commissioning_Plan| Wastewater Commissioning Plan]]
 +
* [https://accweb.acc.jlab.org/presenter/uitf-menu Shift leader summary]
 +
* [[UITF_Notes|Notes and random thoughts]]
 
</td>
 
</td>
 
<!-- Column #2 -->
 
<!-- Column #2 -->
Line 134: Line 138:
 
*UITF Cave [Experiment]
 
*UITF Cave [Experiment]
 
*UITF Laser Room
 
*UITF Laser Room
*UITF Mezzanine
+
*UITF Mezzanine (North/Gun)
 +
*UITF Mezzanine (South)
 
*Control Room (Left)
 
*Control Room (Left)
 
*Control Room (Center)
 
*Control Room (Center)
Line 156: Line 161:
 
*7356
 
*7356
 
*6143
 
*6143
*-
+
*7359
 +
*7358
 
*7351
 
*7351
 
*6141
 
*6141
Line 189: Line 195:
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
[[Shift_Taker_Information| Info for Shift Takers]]
 
<br clear="all"> -->
 
<br clear="all"> -->

Revision as of 11:07, 22 September 2021

Meetings

Configuration


Work Controls


Users (Past/Present)


Archival


Documentation

Welcome to the UITF Operations Wiki!


The Upgraded Injector Test Facility (or UITF) is located within the North-West side of the Test Lab (Bldg. 58), and exists to provide a robust proving ground for a variety of accelerator technologies as well as providing a venue in which to perform low energy physics experiments.

Matt.jpg Experimental Meetings Upcoming Schedule
UITF Meetings Logbook
Publications Posters & Proceedings
Talks Proposed Experiments
Past Experiments Facility Overview

Sign up to this mailing list to receive and share information within the UITF community.

Communication
Web Sites
Documentation
Shift Taker Information
Shift Prep
Contact List
Phone Numbers
Official Documents
  • UITF Facility Manager
  • UITF Facility Manager (Back up)
  • UITF Principle Investigator
  • UITF Cave [Gun]
  • UITF Cave [Quarter]
  • UITF Cave [Experiment]
  • UITF Laser Room
  • UITF Mezzanine (North/Gun)
  • UITF Mezzanine (South)
  • Control Room (Left)
  • Control Room (Center)
  • Control Room (Right)
  • Control Room (Wall)
  • Program Deputy
  • MCC
  • SSO
  • Crew Chief
  • Director of Operations
  • Dept. Director: Accelerator
  • 757-343-7123
  • 757-269-5572
  • -
  • 7355
  • 6144
  • 7356
  • 6143
  • 7359
  • 7358
  • 7351
  • 6141
  • 7354
  • 6142
  • 876-7997
  • 7046,7047,& 7048
  • 269-7050
  • 269-7045
  • -
  • -