(Created page with "'''photogun related procedures''' krypton and vacuum high voltage processing photogun bakeout QE scanning the photocathode '''laser related''' tune mode generator ali...")
 
(8 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
'''[[photogun related procedures]]'''
 
'''[[photogun related procedures]]'''
krypton and vacuum high voltage processing
+
*krypton and vacuum high voltage processing [[Media:UITF Photogun  HV conditioning with Kr procedure.docx]]
photogun bakeout
+
*photogun bakeout
QE scanning the photocathode
+
*QE scanning the photocathode [[media:how to perform a QE scan.docx]]
 +
*turn ON/OFF the photogun high voltage
  
 
'''[[laser related]]'''
 
'''[[laser related]]'''
tune mode generator alignment procedure
+
*tune mode generator alignment procedure [[media:tune mode generator alignment procedure.pdf]]
pockel cell alignment procedure
+
*pockel cell alignment procedure
maximizing the power delivered to the laser hutch inside UITF enclosure
+
*maximizing the power delivered to the laser hutch inside UITF enclosure
  
'''[[techniques to set the UITF buncher]]'''
+
'''[[techniques to set the UITF buncher phase and gradient]]'''
harmonically resonant cavity
+
*using the harmonically resonant cavity
200 keV spectrometer
+
*using the 200 keV spectrometer
Yao cavity, time-of-flight method
+
*using the Yao cavity, time-of-flight method
  
'''[[notes on sweeping the UITF enclosure and making it safe after beam oeprations]]'''
+
'''[[UITF chopper system]]'''
 +
*overall description
 +
 
 +
'''[[notes on sweeping the UITF enclosure and making it safe after beam operations]]'''
 +
*overview of the sweep procedure for UITF, including pre-sweep steps
  
 
'''[[machine protection at UITF]]'''
 
'''[[machine protection at UITF]]'''
UHV ion pumps, setting trip limit
+
*UHV ion pumps, setting the trip limit
  
 
'''[[Beam Authorization]]'''
 
'''[[Beam Authorization]]'''
how to get it
+
*how to get it
Locking out the gun and high power RF
+
*Locking out the gun and high power RF
Locking out the valve upstream of the booster
+
*Locking out the valve upstream of the booster
 +
 
 +
'''[[HDIce-related]]'''
 +
*Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]
 +
*Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]]

Revision as of 17:57, 17 November 2020

photogun related procedures

laser related

techniques to set the UITF buncher phase and gradient

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

notes on sweeping the UITF enclosure and making it safe after beam operations

  • overview of the sweep procedure for UITF, including pre-sweep steps

machine protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

HDIce-related