'''[[photogun related procedures]]'''
 
'''[[photogun related procedures]]'''
*krypton and vacuum high voltage processing
+
*krypton and vacuum high voltage processing [[Media:UITF Photogun  HV conditioning with Kr procedure.docx]]
 
*photogun bakeout
 
*photogun bakeout
 
*QE scanning the photocathode  [[media:how to perform a QE scan.docx]]
 
*QE scanning the photocathode  [[media:how to perform a QE scan.docx]]
Line 31: Line 31:
 
'''[[HDIce-related]]'''
 
'''[[HDIce-related]]'''
 
*Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]
 
*Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]
 +
*Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]]

Revision as of 17:57, 17 November 2020

photogun related procedures

laser related

techniques to set the UITF buncher phase and gradient

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

notes on sweeping the UITF enclosure and making it safe after beam operations

  • overview of the sweep procedure for UITF, including pre-sweep steps

machine protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

HDIce-related