Difference between revisions of "UITF Procedures not managed via document control"

From Ciswikidb
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
*[[media:Emergency-Actions_4.7.21.docx|UITF Emergency Response Guidelines]]
 
*[[media:Emergency-Actions_4.7.21.docx|UITF Emergency Response Guidelines]]
  
 +
'''[[UITF Operator Training]]'''
 +
*[[media:SAF 162 UITF Operator Training.pptx]]
 +
 +
'''[[Shielding related]]'''
 +
*trench shielding photos [[Media:trench shielding photos.xls]]
  
 
'''[[Photogun Related Procedures]]'''
 
'''[[Photogun Related Procedures]]'''
Line 35: Line 40:
 
*Locking out the gun and high power RF
 
*Locking out the gun and high power RF
 
*Locking out the valve upstream of the booster
 
*Locking out the valve upstream of the booster
 +
 +
'''[[Start Up and Shutdown Procedures]]'''
 +
*[[media:Start Up and Shutdown Procedures.docx]]
 +
 +
'''[[booster-related]]'''
 +
*[[media:David Savransky's cool down procedure.docx]]
 +
 +
'''[[waste water irradiation-related]]'''
 +
*[[media:dose mapping procedure.pdf]]
  
 
'''[[HDIce-related]]'''
 
'''[[HDIce-related]]'''
 
*Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]
 
*Rowgowski-coil beam position monitor [[media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]
 
*Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]]
 
*Putting beam on the "golden orbit" [[media: golden orbit procedure.docx]]

Latest revision as of 14:15, 12 March 2024

Emergency Response Procedures

UITF Operator Training

Shielding related

Photogun Related Procedures

Laser Procedures

UITF Buncher Phase & Gradient Setup

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

Sweep Procedures

  • overview of the sweep procedure for UITF, including pre-sweep steps

Machine Protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

Start Up and Shutdown Procedures

booster-related

waste water irradiation-related

HDIce-related