Difference between revisions of "UITF Procedures not managed via document control"

From Ciswikidb
Jump to navigation Jump to search
Line 6: Line 6:
  
 
'''[[laser related]]'''
 
'''[[laser related]]'''
*tune mode generator alignment procedure
+
*tune mode generator alignment procedure [media:tune mode generator alignment procedure.pdf]]
 
*pockel cell alignment procedure
 
*pockel cell alignment procedure
 
*maximizing the power delivered to the laser hutch inside UITF enclosure
 
*maximizing the power delivered to the laser hutch inside UITF enclosure
Line 30: Line 30:
  
 
'''[[HDIce-related]]'''
 
'''[[HDIce-related]]'''
*Rowgowski-coil beam position monitor
+
*Rowgowski-coil beam position monitor [media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]

Revision as of 16:44, 4 March 2020

photogun related procedures

  • krypton and vacuum high voltage processing
  • photogun bakeout
  • QE scanning the photocathode
  • turn ON/OFF the photogun high voltage

laser related

  • tune mode generator alignment procedure [media:tune mode generator alignment procedure.pdf]]
  • pockel cell alignment procedure
  • maximizing the power delivered to the laser hutch inside UITF enclosure

techniques to set the UITF buncher phase and gradient

  • using the harmonically resonant cavity
  • using the 200 keV spectrometer
  • using the Yao cavity, time-of-flight method

UITF chopper system

  • overall description

notes on sweeping the UITF enclosure and making it safe after beam operations

  • overview of the sweep procedure for UITF, including pre-sweep steps

machine protection at UITF

  • UHV ion pumps, setting the trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

HDIce-related

  • Rowgowski-coil beam position monitor [media:Kevin's proposed test plan for evaluating the Rogowski coil bpm.docx]]