UITF Procedures not managed via document control

From Ciswikidb
Revision as of 13:23, 4 March 2020 by Poelker (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

photogun related procedures

  • krypton and vacuum high voltage processing
  • photogun bakeout
  • QE scanning the photocathode

laser related

  • tune mode generator alignment procedure
  • pockel cell alignment procedure
  • maximizing the power delivered to the laser hutch inside UITF enclosure

techniques to set the UITF buncher

  • harmonically resonant cavity
  • 200 keV spectrometer
  • Yao cavity, time-of-flight method

notes on sweeping the UITF enclosure and making it safe after beam oeprations

machine protection at UITF

  • UHV ion pumps, setting trip limit

Beam Authorization

  • how to get it
  • Locking out the gun and high power RF
  • Locking out the valve upstream of the booster

HDIce-related Rowgowski-coil beam position monitor