HDIce Dump Magnet OSP media:HDIce Dump Magnet OSP.pdf

UITF cave 2 catwalk engineering calculations media:catwalk engineering calculations from Tom Renzo.pdf

UITF Cave2 ceiling roof tile removal, OSP and THA, revision 2, in review media:UITF Cave2 ceiling roof tile removal OSP.pdf**** media:UITF Cave2 ceiling roof tile removal THA.pdf

Shielding Design Package from Vashek, approved by SCMB media:UITF shielding package by Vashek Vylet.pdf,https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, Photos of trench foam and lead shielding media:UITF trench shielding with photos.xls

Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP File:Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP.pdf

UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility: Revised OSP #82655 File:Revised OSP 82655 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf and File:Revised THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf. These files can be accessed at https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?ENTRY_ID=82655

UITF Commissioning the QCM with RF, no beam acceleration, revision2: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424 File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf****File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx

UITF Commissioning the QCM with RF, no beam acceleration, Task Hazard Analysis, revision2: File:THA for the OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF)revision2.pdf

UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)

UITF QCM Vacuum Vessel assessment: File:QCM Vacuum Vessel Assessment by Gary Cheng.docx

UITF Laser OSP: File:LOSP ACC-17-64784.pdf

UITF keV Beam Operations OSP (note this is revision3 of previously approved OSP): File:OSP UITF keV beam operations approved revision3.docx **** File:OSP UITF keV beam operations approved revision3.pdf **** File:OSP-UITF keV beam operations approved revision3 approved OSP format with signatures.pdf

UITF keV Beam Operations THA (note this is revision3 of previously approved THA): File:THA UITF keV beam operations approved revision3.pdf

UITF sweep procedure, updated 11/27/2019, Document Number:SSG-PR-03-101 Rev. 19.2 File:UITF sweep procedure SSG-PR-03-101 Rev. 19.2.pdf

UITF Final Approved ODH Assessment: File:UITF ODH Assessment.pdf and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/74180/edit

UITF Industrial Hygiene Assessment for SF6 exposure: File:UITF SF6 assessment.pdf

UITF TOSP_high voltage conditioning a new photogun with 225kV Spellman supply: File:UITF TOSP gun HV conditioning.pdf **** File:UITF THA gun HV conditioning.pdf