Difference between revisions of "UITF plans for coming weeks, months plus booster optics discussion"

From Ciswikidb
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 10: Line 10:
 
#) 2 more weeks of HDIce, with all the drama of rooftile removal/replacement
 
#) 2 more weeks of HDIce, with all the drama of rooftile removal/replacement
 
#) when we come back, Rama and Tomasz need days to load LLRF 3.0, which is needed for CEBAF
 
#) when we come back, Rama and Tomasz need days to load LLRF 3.0, which is needed for CEBAF
#) yao bunchlength measurement, if it works, it could really help us setting phases
+
#) yao bunchlength measurement, if it works, it could really help us set phases (I would like a description of the proposed measurement, what phases will be adjusted?)
 
#) more optics measurements...
 
#) more optics measurements...
 
#) try RayTrace, need BPMs
 
#) try RayTrace, need BPMs
Line 17: Line 17:
  
 
[[media:UITF talking points 2_18_2021.docx]]
 
[[media:UITF talking points 2_18_2021.docx]]
 +
 +
[[media:Fay's astra model of CEBAF injector.pdf]]

Latest revision as of 13:03, 18 February 2021

UITF going forward, here's how I prioritize things. We might have till the end of March, when LHe gets diverted to CMTF

so now juggling the three priorities: HDIce run4, booster assessment, water irradiation

sort of sequential order....

  1. ) the gun needs to be krypton processed, a mysterious task with no definitive idea as to when the work stops. Guess three days, start next Tuesday Feb 23 - stop Thursday Feb 25
  2. ) Yan is on a roll with the booster studies, deflection, x/y coupling etc.
  3. ) we need to feed "good" emittance measurements to Dennis. There are four working harps, we need good files from each harp, both planes
  4. ) 2 more weeks of HDIce, with all the drama of rooftile removal/replacement
  5. ) when we come back, Rama and Tomasz need days to load LLRF 3.0, which is needed for CEBAF
  6. ) yao bunchlength measurement, if it works, it could really help us set phases (I would like a description of the proposed measurement, what phases will be adjusted?)
  7. ) more optics measurements...
  8. ) try RayTrace, need BPMs
  9. ) emittance using YAG viewer
  10. ) GPT studies by Xi (not last because it's not important, but she gets the months of July and August)

media:UITF talking points 2_18_2021.docx

media:Fay's astra model of CEBAF injector.pdf