#) 2 more weeks of HDIce, with all the drama of rooftile removal/replacement | #) 2 more weeks of HDIce, with all the drama of rooftile removal/replacement | ||
#) when we come back, Rama and Tomasz need days to load LLRF 3.0, which is needed for CEBAF | #) when we come back, Rama and Tomasz need days to load LLRF 3.0, which is needed for CEBAF | ||
− | #) yao bunchlength measurement, if it works, it could really help us | + | #) yao bunchlength measurement, if it works, it could really help us set phases (I would like a description of the proposed measurement, what phases will be adjusted?) |
#) more optics measurements... | #) more optics measurements... | ||
#) try RayTrace, need BPMs | #) try RayTrace, need BPMs | ||
Line 16: | Line 16: | ||
#) GPT studies by Xi (not last because it's not important, but she gets the months of July and August) | #) GPT studies by Xi (not last because it's not important, but she gets the months of July and August) | ||
− | [[media: ]] | + | [[media:UITF talking points 2_18_2021.docx]] |
+ | |||
+ | [[media:Fay's astra model of CEBAF injector.pdf]] |
Latest revision as of 13:03, 18 February 2021
UITF going forward, here's how I prioritize things. We might have till the end of March, when LHe gets diverted to CMTF
so now juggling the three priorities: HDIce run4, booster assessment, water irradiation
sort of sequential order....
- ) the gun needs to be krypton processed, a mysterious task with no definitive idea as to when the work stops. Guess three days, start next Tuesday Feb 23 - stop Thursday Feb 25
- ) Yan is on a roll with the booster studies, deflection, x/y coupling etc.
- ) we need to feed "good" emittance measurements to Dennis. There are four working harps, we need good files from each harp, both planes
- ) 2 more weeks of HDIce, with all the drama of rooftile removal/replacement
- ) when we come back, Rama and Tomasz need days to load LLRF 3.0, which is needed for CEBAF
- ) yao bunchlength measurement, if it works, it could really help us set phases (I would like a description of the proposed measurement, what phases will be adjusted?)
- ) more optics measurements...
- ) try RayTrace, need BPMs
- ) emittance using YAG viewer
- ) GPT studies by Xi (not last because it's not important, but she gets the months of July and August)