Wednesday August 6, 2014

From Ciswikidb
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

We will meet in TL 2236 on Wednesday August 6 at 3:30 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Bubble Chamber progress at Argonne

2. (Grames) JLab Update

Design, installation and released mechanical drawings (dipole + beam line) are here \group\bubble\grames
Fabrication status
Installation status
  • Injector power restored 2 days ago, can resume work
  • Phil coordinating Alignment + Installation groups for new points & pedestals (in hand)
  • Vacuum parts assembly will begin soon, tunnel installation date TBD
  • Instrumentation hook-ups and cable pulls by ~Labor Day
  • Fast valve controls group resolving design issue (no impact w/ thick radiator)
  • Dipole magnet due mid-August (measurement and controls group ready); install depends on turn-around time
  • Bench BPM position calibration (one done, one to go)
Commissioning status
  • Provided punch list to Director of Ops (vacation until mid-August)
  • High level goals are beam line functionality & 100uA at highest energy on radiator
  • Contacted Medical Imaging group (Jay's suggestion) regarding Brem characterization




Notes from this meeting:

  • Bubble Chamber: Next to try differentially cooled mercury (at meniscus, N2O will not be superheated).