Difference between revisions of "Template:ShortTermSchedule-RGE"
Jump to navigation
Jump to search
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1605705819), except on Wednesdays, which is @ 15:00 in CH Room 200C and at the same ZOOM link.
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | '''Run Coordinator: | + | '''Run Coordinator: Sebouh Paul ''' (757) 575-7540 |
'''PDL: Nathan Baltzell''' (757) 876-1789, Office: x5902 | '''PDL: Nathan Baltzell''' (757) 876-1789, Office: x5902 | ||
Line 11: | Line 11: | ||
* <font color=Blue>In case of a problem with the HV Slow Controls, EPICS in general, please call the primary expert on-call, Nathan Baltzell, before reaching out to anyone else.</font> | * <font color=Blue>In case of a problem with the HV Slow Controls, EPICS in general, please call the primary expert on-call, Nathan Baltzell, before reaching out to anyone else.</font> | ||
− | '''Please put all essential information on the main | + | * '''Please put all essential information on the main Hall B logbook HBLOG. Some important alarms have been documented on HBRUN. Use the pulldown menu to choose where an error is reported.''' |
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
Line 20: | Line 20: | ||
* Take production data! Don't break anything! | * Take production data! Don't break anything! | ||
− | * Keep an eye on the backgrounds, such as in the halo counters and the | + | * Keep an eye on the backgrounds, such as in the halo counters and the 2C24A and 2H01 BPM positions. Both give confidence that the beam remains centered on the RG-E target. |
* See the {{#switchtablink:General_Information|General Information}} tab for specific issues with the detector subsystems. | * See the {{#switchtablink:General_Information|General Information}} tab for specific issues with the detector subsystems. | ||
Line 28: | Line 28: | ||
* For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 | * For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 | ||
− | === '''Lumi Scan for LD2+ | + | === '''Lumi Scan for LD2+Pb on May 15<sup>th</sup> - 16<sup>th</sup>''' === |
− | |||
:<font color=Brown>• Beam Blocker: OUT | :<font color=Brown>• Beam Blocker: OUT | ||
:• Configuration: <tt>PROD67</tt> (w/o. PIN option) | :• Configuration: <tt>PROD67</tt> (w/o. PIN option) | ||
− | :• Take one 5 nA run for 4 hours | + | :• Trigger: <tt>rge_inb_v1.0_200MeV.trg</tt> |
− | :• Take one | + | :• Take one 5 nA run for 4 hours w/. beam ON |
− | :• Take one | + | :• Take one 10 nA run for 3 hours w/. beam ON |
− | + | :• Take one 20 nA run for 3 hours w/. beam ON | |
− | :• | + | :• Take one 40 nA run for 3 hours w/. beam ON </font> |
* <font color=BLUE>Long-term run plan can be found in this link: [https://docs.google.com/spreadsheets/d/13CvaWromHWRBfxoPrRsy8AD4omTOl0SQkHT6A3mJbRw/edit#gid=967597323], and is outlined below: | * <font color=BLUE>Long-term run plan can be found in this link: [https://docs.google.com/spreadsheets/d/13CvaWromHWRBfxoPrRsy8AD4omTOl0SQkHT6A3mJbRw/edit#gid=967597323], and is outlined below: | ||
− | + | :# Perform the '''Streaming Readout Test''' (''when possible om May 16<sup>th</sup>; will be coordinated with Sergey''); | |
− | + | :# Take one Empty+Al run @ 70 nA w/. BB for 3 hours; | |
− | :# Perform the '''Streaming Readout Test''' | + | :# Take one Empty+Empty run @ 200 nA w/. BB for 5 hours (do BB calibration); |
− | :# Take one Empty+Al run @ 70 nA w/. BB for 3 hours | + | :# Reverse the torus magnet polarity and fill the LD2 target; |
− | :# Take one Empty+Empty run @ 200 nA w/. BB for 5 hours (do BB calibration) | + | :# Take outbending data with LD2+C and/or LD2+Pb until the beam is taken away on May 19<sup>th</sup> at 7 a.m. for the accelerator beam studies.</font> |
− | :# Reverse the torus magnet polarity and fill the LD2 target | ||
− | :# Take outbending data with LD2+C and/or LD2+Pb until the beam is | ||
== ''Previous Dual-target Configuration Plans'' == | == ''Previous Dual-target Configuration Plans'' == | ||
Line 84: | Line 81: | ||
:• Beam Current: 70 nA | :• Beam Current: 70 nA | ||
:• 3-hour runs | :• 3-hour runs | ||
+ | |||
+ | == ''Lumi Scan for LD2+Al on May 15<sup>th</sup>'' == | ||
+ | :• Beam Blocker: OUT | ||
+ | :• Configuration: <tt>PROD67</tt> (w/o. PIN option) | ||
+ | :• Trigger: <tt>rge_inb_v1.0_200MeV.trg</tt> | ||
+ | :• Take one 5 nA run for 4 hours | ||
+ | :• Take one 20 nA run for 3 hours | ||
+ | :• Take one 45 nA run until the beam is off for the Hall C 5<sup>th</sup> pass change. | ||
| valign=top | | | valign=top | | ||
Line 93: | Line 98: | ||
:*The most important <font color=red>'''BPMs to monitor are 2C24A and 2H01'''</font>, from the point of view of assuring the beam remains centered on the RG-E target. Other steering/focusing beamline elements can influence the values of the others. | :*The most important <font color=red>'''BPMs to monitor are 2C24A and 2H01'''</font>, from the point of view of assuring the beam remains centered on the RG-E target. Other steering/focusing beamline elements can influence the values of the others. | ||
− | :{| class=wikitable cellpadding="10" cellspacing="0" style="border-left:2px solid gray;border-right:2px solid gray;border-bottom:1px solid gray;" | + | :{| class=wikitable cellpadding="10" cellspacing="0" style="border-left:2px solid gray;border-right:2px solid gray;border-bottom:1px solid gray" |
+ | !style="background:#ffdead;border-bottom:2px solid gray; border-top:2px solid gray;border-right:2px solid gray" | '''BPM''' || style="border-bottom:2px solid gray; border-top:2px solid gray" | 2C21A || style="border-bottom:2px solid gray; border-top:2px solid gray" | 2C24A || style="border-bottom:2px solid gray; border-top:2px solid gray" | 2H01 | ||
+ | |- | ||
+ | | style="background:#ffdead;border-bottom:2px solid gray;border-top:2px solid gray;border-right:2px solid gray" | '''X (mm)''' || -0.4 || -1.7 || -1.0 | ||
+ | |- | ||
+ | | style="background:#ffdead;border-bottom:2px solid gray;border-top:2px solid gray;border-right:2px solid gray" | '''Y (mm)'''|| style="border-bottom:2px solid gray"|+0.7 || style="border-bottom:2px solid gray"|+0.5 || style="border-bottom:2px solid gray"|+0.25 | ||
+ | |- | ||
+ | |} | ||
+ | <!--:{| class=wikitable cellpadding="10" cellspacing="0" style="border-left:2px solid gray;border-right:2px solid gray;border-bottom:1px solid gray;" | ||
!style="background:#ffdead;border-bottom:2px solid gray; border-top:2px solid gray" | '''BPM''' ||style="background:#ffdead;border-bottom:2px solid gray;border-top:2px solid gray" | '''X (mm)''' ||style="background:#ffdead;border-bottom:2px solid gray;border-top:2px solid gray" | '''Y (mm)''' | !style="background:#ffdead;border-bottom:2px solid gray; border-top:2px solid gray" | '''BPM''' ||style="background:#ffdead;border-bottom:2px solid gray;border-top:2px solid gray" | '''X (mm)''' ||style="background:#ffdead;border-bottom:2px solid gray;border-top:2px solid gray" | '''Y (mm)''' | ||
|- | |- | ||
Line 101: | Line 114: | ||
|- | |- | ||
|style="border-bottom:2px solid gray;" | 2H01 ||style="border-bottom:2px solid gray;"| -1.0 ||style="border-bottom:2px solid gray;"| +0.25 | |style="border-bottom:2px solid gray;" | 2H01 ||style="border-bottom:2px solid gray;"| -1.0 ||style="border-bottom:2px solid gray;"| +0.25 | ||
− | |} | + | |}--> |
− | |||
=== ''- Harp Scans'' === | === ''- Harp Scans'' === | ||
* [https://logbooks.jlab.org/entry/4268480 2C21A] | * [https://logbooks.jlab.org/entry/4268480 2C21A] |
Revision as of 21:51, 15 May 2024
Run Coordinator: Sebouh Paul (757) 575-7540
PDL: Nathan Baltzell (757) 876-1789, Office: x5902
Important Notes
- In case of medical or fire emergency, call 911 or 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter can call MCC to turn the beam OFF for Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift. Instead, inform the PDL, the RC, and JLab medical services immediately to arrange replacements.
- In case of a problem with the HV Slow Controls, EPICS in general, please call the primary expert on-call, Nathan Baltzell, before reaching out to anyone else.
- Please put all essential information on the main Hall B logbook HBLOG. Some important alarms have been documented on HBRUN. Use the pulldown menu to choose where an error is reported.
Current Run Plan: May 8th to May 19th
Lumi Scan for LD2+Pb on May 15th - 16th
Previous Dual-target Configuration Plans- DC firmware test plan (LD2 + Pb)1) Take one run each with 1M events with the trigger files and beam current at 70 nA
2) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_2.trg 3) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_4.trg
*** Notes ***
LD2+Pb runs
LD2+Sn runs
LD2+Al runs
Lumi Scan for LD2+Al on May 15th
|
References- BPM Positions
- Harp Scans- FSD Thresholds
- Charge Asymmetry- Upstream Halo counters
|
General Reminders
|
DAQ Operation
|